LYB · Company KPIs
LyondellBasell Industries (LYB) KPIs
Louisiana JV ethylene and polyethylene off-take. As reported in SEC filings, with the source document for each figure.
Louisiana JV ethylene and polyethylene off-take
1M tons for the fiscal year ended Dec 31, 2025
Units: tons
LyondellBasell’s annual product off-take of ethylene and polyethylene from its 50%-owned Louisiana Integrated PolyEthylene joint venture.
| Fiscal year ended | Figure | Source |
|---|---|---|
| Dec 31, 2025 | 1M tons | Our product off-take of ethylene and polyethylene produced from the Louisiana Joint Venture was 1.0 million, 1.1 million, and 1.2 million tons in 2025, 2024, and 2023, respectively.10-K filed 2026-02-20Unit source: 1.0 million tons(filing header) |
| Dec 31, 2024 | 1.1M tons | Our product off-take of ethylene and polyethylene produced from the Louisiana Joint Venture was 1.1 million, 1.2 million, and 1.0 million tons in 2024, 2023, and 2022, respectively.10-K filed 2025-02-27Unit source: 1.1 million tons(filing header) |
| Dec 31, 2023 | 1.2M tons | Our product off-take of ethylene and polyethylene produced from the Louisiana Joint Venture was 1.2 million, 1.0 million, and 1.1 million tons in 2023, 2022, and 2021, respectively.10-K filed 2024-02-22Unit source: 1.2 million tons(filing header) |
| Dec 31, 2022 | 1M tons | Our product off-take of ethylene and polyethylene produced from the Louisiana Joint Venture was 1.0 million tons in 2022 and 1.1 million tons in 2021.10-K filed 2023-02-23Unit source: 1.0 million tons(filing header) |
| Dec 31, 2021 | 1.1M tons | Our product off-take of ethylene and polyethylene produced from the Louisiana Joint Venture in 2021 was 1.1 million tons.10-K filed 2022-02-24Unit source: 1.1 million tons(filing header) |
Reading notes
Figures are shown as first reported. If a later filing prints a different figure for the same period, both appear. A figure marked ≈ or shown in words is how the company itself states it, not an estimate of ours. Companies change definitions over time, so compare periods with the quoted definition in mind. Periods that failed our checks are left out, so gaps are expected.