THE INTRADAY

EQT · Company KPIs

EQT (EQT) KPIs

Average realized price, Total per unit operating costs. As reported in SEC filings, with the source line for each figure.

Average realized price

2.72 for the period ended Sep 30, 2026

Mar 31, 2025: 3.77Jun 30, 2025: 2.81Sep 30, 2025: 2.76Mar 31, 2026: 5.08Jun 30, 2026: 2.65Sep 30, 2026: 2.72Mar 31, 2025Sep 30, 2026

The filings read for this page do not define this measure.

Average realized price, as first reported, with the line it was read from
Period endedFigureFiling text
Sep 30, 20262.72Average realized price ($/Mcfe) · $2.72 · $2.76 · $(0.04)8-K filed 2026-10-27
Jun 30, 20262.65Average realized price ($/Mcfe) · $2.65 · $2.81 · $(0.16)8-K filed 2026-07-21
Mar 31, 20265.08Average realized price ($/Mcfe) · $5.08 · $3.77 · $1.318-K filed 2026-04-21
Sep 30, 20252.76Average realized price ($/Mcfe) · $2.72 · $2.76 · $(0.04)8-K filed 2026-10-27
Jun 30, 20252.81Average realized price ($/Mcfe) · $2.65 · $2.81 · $(0.16)8-K filed 2026-07-21
Mar 31, 20253.77Average realized price ($/Mcfe) · $5.08 · $3.77 · $1.318-K filed 2026-04-21

Total per unit operating costs

1.09 for the period ended Sep 30, 2026

Mar 31, 2025: 1.05Jun 30, 2025: 1.08Sep 30, 2025: 1Mar 31, 2026: 1.09Jun 30, 2026: 1.03Sep 30, 2026: 1.09Mar 31, 2025Sep 30, 2026

The filings read for this page do not define this measure.

Total per unit operating costs, as first reported, with the line it was read from
Period endedFigureFiling text
Sep 30, 20261.09Operating costs · $1.09 · $1.00 · $1.07 · $1.048-K filed 2026-10-27
Jun 30, 20261.03Operating costs · $1.03 · $1.08 · $1.04 · $1.088-K filed 2026-07-21
Mar 31, 20261.09Operating costs · $1.09 · $1.058-K filed 2026-04-21
Sep 30, 20251Operating costs · $1.09 · $1.00 · $1.07 · $1.048-K filed 2026-10-27
Jun 30, 20251.08Operating costs · $1.03 · $1.08 · $1.04 · $1.088-K filed 2026-07-21
Mar 31, 20251.05Operating costs · $1.09 · $1.058-K filed 2026-04-21

Reading notes

Figures are shown as first reported. If a later filing prints a different figure for the same period, both appear. A figure marked ≈ or shown in words is how the company itself states it, not an estimate of ours. Companies change definitions over time, so compare periods with the quoted definition in mind. Periods that failed our checks are left out, so gaps are expected.