Evergy

Q3 2026
Speakers

Nov 5, 2026 · 50 min

PREPARED REMARKS · INFERREDKeys: / search · Space play · ←→ ±10s · [] sections

Prepared remarks

Speaker 0

Unverified voice label

Good day and thank you for standing by. Welcome to the Q3 2026 EverG Inc. Earnings Conference Call. At this time, all participants are in a listen only mode. After the speaker's presentation, there will be a question and answer session. To ask a question during the session, you will need to press star 1 1 on your telephone. You will then hear an automated message advising your hand is raised.

To withdraw your question, please press star 1 1 again. Please be advised that today's conference I would now like to hand the conference over to Peter Flynn, Senior Director of Investor Relations and Insurance. Please go ahead.

Passages & reports (2)
  • Good day and thank you for standing by. Welcome to the Q3 2026 EverG Inc. Earnings Confere…
  • 1 on your telephone. You will then hear an automated message advising your hand is raised.…

Speaker unclear

?Thank

Passages & reports (1)
  • Thank

Speaker 1

Unverified voice label

you, Kelly, and good morning, everyone. Welcome to Evergy's third quarter 2026 Earnings Conference Call. ?We posted a presentation on the Investor Relations page of our website that will be referenced by our speakers. As noted on slide two, today's discussion will include forward-looking statements that are accurate only as of the date of today's webcast. Actual results could differ materially these forward looking statements due to a number of factors, ?which are set forth in our earnings release, the slide presentation, and our other SEC filings.

Management will also discuss certain non GAAP financial information. Reconciliations to the applicable GAAP measures are included in today's earnings release and slide presentation, both of which are available on the investor relations page of our website. Joining us on
today's call are David Campbell, Chairman and Chief Executive Officer, and Brian Buckler, Executive Vice President and Chief Financial Officer. David will cover third quarter highlights, our economic development progress, and our regulatory agenda.

Brian will review third quarter financial results, retail sales trends,
?and our 2026 and long-term financial outlook. Other members of management are with us and will be available during the QA portion of the call. ?I will now turn the call over to David. Thanks, Pete, and good morning,

Passages & reports (10)
  • you, Kelly, and good morning, everyone. Welcome to Evergy's third quarter 2026 Earnings Co…
  • We
  • posted a presentation on the Investor Relations page of our website that will be reference…
  • which
  • are set forth in our earnings release, the slide presentation, and our other SEC filings. …
  • today's call are David Campbell, Chairman and Chief Executive Officer, and Brian Buckler, …
  • and
  • our 2026 and long-term financial outlook. Other members of management are with us and will…
  • I
  • will now turn the call over to David. Thanks, Pete, and good morning,

Speaker 2

Unverified voice label

everyone. I'll begin on slide five. This morning we reported third-quarter adjusted earnings ?of $2.58

Passages & reports (3)
  • everyone. I'll begin on slide five. This morning we reported third-quarter adjusted earnin…
  • of
  • $2.58

Speaker 1

per

Passages & reports (1)
  • per

Speaker unclear

?share

Passages & reports (1)
  • share

Speaker 2

compared to $2.03 per share a year ago. ?The year-over-year increase was driven primarily by warmer weather, continued load growth, revenue from large customers, and recovery of regulated investments, partially offset by higher operations and maintenance and depreciation expense. Year-to-date adjusted earnings were $4.15 per share compared to $3.41 per share a year ago. Brian will discuss the financial drivers in more detail in his remarks.

During the quarter, we worked closely with two of our large customers to refine their anticipated load profiles
?and update their electric service agreements. As a result, we are announcing three amendments that we expect will increase peak load under those agreements by approximately 250 megawatts, adding incremental large load over the 2027 and 2030 period and beyond. Additionally, we signed a letter of intent with Digital Realty ?for a 1.4 gigawatt expansion project, which I'll discuss in more detail on slide seven. ?

These
agreements demonstrate the strength of our customer relationships and continued large customer interest in locating and expanding in our Kansas and Missouri communities. Operation results have been strong this year with safety, reliability, and generation availability trending favorably to target. Our generation team performed well through a demanding summer, maintaining reliable operation through hot weather and record peak demand for both Evergy ?and the Southwest Power Pool.

Their execution helped ensure that we reliably served our customers during the most strenuous tests of our fleet and the grid. Given strong year to date results driven by solid operational performance and warm in the normal weather, we expect full year results to exceed the top end of our annual
guidance range. ?We are increasing our 2026 adjusted EPS guidance to $4.35 to $4.50 per share, up from $4.14 to $4.34 per share. ?

We
are also reaffirming our long term adjusted EPS growth target of 6% to 8% plus through twenty thirty, measured from the original 2026 guidance midpoint of four dollars and twenty-four cents. We continue to expect annual adjusted EPS growth to exceed eight percent beginning in 2028 and through 2030. Finally, I'm pleased to announce a four percent increase in our quarterly dividend, bringing the annualized dividend to two dollars and fifty and two dollars and eighty nine cents per share.

This is in line with last year's increase and consistent with our objective
?of moving toward a payout ratio of 50 to 60 percent over time. During the slide six, we highlight the major gains in regional rate competitiveness Evergy has achieved over the past nine years. This success since the merger that created EverGee directly supports the growth opportunities we're discussing today. Since 2017, our rate trajectory has remained well below regional peers and far below inflation. ?

The
cumulative change in Evergy's all in rates over that time is approximately 7% compared to our regional peer average of 25% and overall inflation of 33%. Holding electric rate increases to a 0.7% annual rate reflects the scale benefits and cost savings resulting from the merger, promises we made and promises we kept. Our continuous focus on affordability and cost discipline is critical to ensuring all of our customers benefit from a new era of economic development and infrastructure investment.

Our commitment is further underpinned by the Large Load Power Service Tariff, or LLPS. Above all, the
LLPS protects existing customers by ensuring large customers pay the full costs associated with serving them and their fair share of incremental system cost, all while delivering affordability benefits back to our other retail customers and providing for strong commission oversight. ?To that end, we recently made a filing to augment our approach in Kansas with the LLPS Customer Affordability Enhancement Plan, ?a new vintage of tariff designed to incorporate the strong guardrails already in place while generating incremental affordability benefits for our customers.

I'll discuss this filing in more detail shortly.
?We look forward to advancing our affordability objectives and working with Governor Alex Holster, who we know from our service to Kansas as a collaborative legislator of the state senate. We'd also like to thank Governor Kelly for her leadership throughout her two terms. ?In our Missouri Service Territory, we are equally focused on ensuring protections and driving benefits for our customers and communities as we advance our robust Missouri pipeline in tandem with the economic development and growth agenda of Governor Kehoe and state leaders. ?

We
understand that new large customers aren't a good fit in every community, and our strategy remains prioritizing large customer projects in areas that are well suited for these developments and backed by local permits and local support. Turn to slide seven: execution of our large customer strategy continues to deliver tangible progress for every customers ?and the communities we ?serve. The amendments we announced today add approximately 110 megawatts of make-rental peak load across two existing large load ESAs.

As a result, the five executed ESAs now represent approximately 2.6 gigawatts of steady-state peak load. And together with non-LPS large customers, we expect these projects to require approximately 3.1
gigawatts of peak load over ?time. Additionally, we executed a third agreement for a 140 megawatt expansion of an existing project. ?The amendment is contingent on the results of a transmission study expected by the end of this year.

We're also pleased to sign a letter of intent with Digital Realty for a 1.4 gigawatt expansion
?at a site adjacent to their 600 megawatt project with a signed ESA as announced on our Q1 earnings call. Together, these projects represent two gigawatts of load with Digital Realty. This LOI demonstrates alignment on commercial terms ?and a shared interest in investing in Kansas to deliver affordability benefits to our customers ?and enable economic growth in the local economy, part of a 9,000-acre industrial site, formerly a large U.S.

Army ammunition plant that has since been remediated, that is well suited for this type of development.
?We anticipate executing an ESA in the first half of next ?year. Each of our five ESAs operates under the Large Load Power Service Tariff or L LPS, which includes premium demand rates, binding minimum bills, and meaningful credit and collateral protections. This framework is designed to ensure that large customers pay their direct costs and a fair share of existing and new system costs, while helping spread fixed costs across a broader base ?for the benefit of existing customers. ?

We
are very encouraged by the momentum across our pipeline and are advancing multiple expansion opportunities with current customers and several projects with prospective new customers. ?Over the next 12 to 18 months, we see the potential for a steady cadence of pipeline conversions to announce ESAs. These agreements would further establish Kansas-Missouri as premier destinations for infrastructure investment and contribute significantly to economic growth and long-term prosperity across our

Passages & reports (62)
  • compared to $2.03 per share a year ago.
  • The
  • year-over-year increase was driven primarily by warmer weather, continued load growth, rev…
  • year ago. Brian will discuss the financial drivers in more detail in his remarks. During t…
  • and
  • update their electric service agreements. As a result, we are announcing three amendments …
  • for
  • a 1.4 gigawatt expansion project, which I'll discuss in more detail on slide seven.
  • These
  • agreements demonstrate the strength of our customer relationships and continued large cust…
  • maintaining reliable operation through hot weather and record peak demand for both Evergy
  • and
  • the Southwest Power Pool. Their execution helped ensure that we reliably served our custom…
  • guidance range.
  • We
  • are increasing our 2026 adjusted EPS guidance to $4.35 to $4.50 per share, up from $4.14 t…
  • We
  • are also reaffirming our long term adjusted EPS growth target of 6% to 8% plus through twe…
  • Finally, I'm pleased to announce a four percent increase in our quarterly dividend, bringi…
  • of
  • moving toward a payout ratio of 50 to 60 percent over time. During the slide six, we highl…
  • remained well below regional peers and far below inflation.
  • The
  • cumulative change in Evergy's all in rates over that time is approximately 7% compared to …
  • merger, promises we made and promises we kept. Our continuous focus on affordability and c…
  • LLPS protects existing customers by ensuring large customers pay the full costs associated…
  • To
  • that end, we recently made a filing to augment our approach in Kansas with the LLPS Custom…
  • a
  • new vintage of tariff designed to incorporate the strong guardrails already in place while…
  • We
  • look forward to advancing our affordability objectives and working with Governor Alex Hols…
  • In
  • our Missouri Service Territory, we are equally focused on ensuring protections and driving…
  • We
  • understand that new large customers aren't a good fit in every community, and our strategy…
  • and
  • the communities we
  • serve. The
  • amendments we announced today add approximately 110 megawatts of make-rental peak load acr…
  • gigawatts of peak load over
  • time.
  • Additionally, we executed a third agreement for a 140 megawatt expansion of an existing pr…
  • The
  • amendment is contingent on the results of a transmission study expected by the end of this…
  • at
  • a site adjacent to their 600 megawatt project with a signed ESA as announced on our Q1 ear…
  • and
  • a shared interest in investing in Kansas to deliver affordability benefits to our customer…
  • and
  • enable economic growth in the local economy, part of a 9,000-acre industrial site, formerl…
  • We
  • anticipate executing an ESA in the first half of next
  • year.
  • Each of our five ESAs operates under the Large Load Power Service Tariff or L LPS, which i…
  • spread fixed costs across a broader base
  • for
  • the benefit of existing customers.
  • We
  • are very encouraged by the momentum across our pipeline and are advancing multiple expansi…
  • Over
  • the next 12 to 18 months, we see the potential for a steady cadence of pipeline conversion…

Speaker unclear

?region.

Passages & reports (1)
  • region.

Speaker 2

Slide eight summarizes the progress we've made in converting our large customer pipeline into signed agreements and provides an update on activity further down the queue. Starting in the top row, the now 3.1 gigawatts of Tier 1 customers with active operations or binding ESAs enables a transformative growth opportunity for Evergy and the communities we serve, supporting our expected 7% to 8% annual retail load growth through 2030.

This total consists of projects already in operation, progressing towards a steady state of 1.4 gigawatts,
?as well as 1.7 gigawatts of additional projects that have executed ESAs, all of which require minimum monthly bill provisions spanning 15 to 17 years, whether or not the capacity is fully equal ?on. Regionally, these will deliver significant benefits, including supporting a leading edge economy, creating jobs, and significantly expanding the local tax base, ?while enabling us to spread system costs over a broader load profile to maintain affordability for all customers. ?

In
the next category, we highlight approximately 2.0 to 2.5 gigawatts of Tier 1 expansion opportunities ?that are at or adjacent to our existing customer sites. This category includes the potential 1.4 gigawatt expansion with digital realty that I described earlier. Agreements related to these opportunities will require amending load ramps and existing ESAs or new ESAs. In tandem, we are working on the transmission and generation solutions to enable ?them.

And to be clear, our five-year financial plan does not yet incorporate any impact from these potential expansion projects, including the 1.4 gigawatt digital realty expansion
?and the 140 megawatt contingent 30 ESA amendment described today, all of which would create additional growth into the 2030s. ?Our Tier 2 category includes approximately one to two gigawatts of advanced discussions with new customers. These projects have land or land rights, signed letters of agreement, and we are actively reviewing transmission and generation capacity solutions. ?

The
opportunity from these customers is primarily beyond 2030. All of the projects in our expansion opportunities and advanced discussions categories made meaningful progress in recent months. We look forward to converting a large portion of these prospective customer initiatives into ESAs in the quarters ahead. ?The remaining pipeline totaling well over 10 additional gigawatts highlights robust activity and a sustained interest in our region.

Serving this load will require working collaboratively to identify creative solutions with our customers who stand ready to move forward as capacity opens, allowing us to prioritize the best fit projects as the queue evolves.
?And before I move on to the next topic, I will summarize by saying that we continue to have a high level of confidence in achieving a total of five to seven gigawatts ?of large load customer agreements, which would drive significant affordability benefits for our existing customers and exceptional growth for the company well into the 2030s.

Moving to slide nine, we are pleased to reach a partial revenue requirement settlement in our Missouri Metro rate review in October. Select items remain open for commission evaluation
outside of the partial revenue settlement with staff, including return on capital. If the settlement is approved and if the midpoint of staff's testimony on return on capital is used, a 9.7% return on equity with a 52% equity ratio.

We expect the revenue increase would equal approximately $118 million before
the impact of new large load large load. In addition, we filed a partial stipulation and agreement related to the LLPS tariff. If approved, this settlement would deliver approximately 60 million of net benefits from new large customer revenues, resulting in a total net revenue increase of approximately $58 million.

Passages & reports (29)
  • Slide eight summarizes the progress we've made in converting our large customer pipeline i…
  • we serve, supporting our expected 7% to 8% annual retail load growth through 2030. This to…
  • as
  • well as 1.7 gigawatts of additional projects that have executed ESAs, all of which require…
  • on.
  • Regionally, these will deliver significant benefits, including supporting a leading edge e…
  • while
  • enabling us to spread system costs over a broader load profile to maintain affordability f…
  • In
  • the next category, we highlight approximately 2.0 to 2.5 gigawatts of Tier 1 expansion opp…
  • that
  • are at or adjacent to our existing customer sites. This category includes the potential 1.…
  • to enable
  • them.
  • And to be clear, our five-year financial plan does not yet incorporate any impact from the…
  • and
  • the 140 megawatt contingent 30 ESA amendment described today, all of which would create ad…
  • Our
  • Tier 2 category includes approximately one to two gigawatts of advanced discussions with n…
  • The
  • opportunity from these customers is primarily beyond 2030. All of the projects in our expa…
  • The
  • remaining pipeline totaling well over 10 additional gigawatts highlights robust activity a…
  • And
  • before I move on to the next topic, I will summarize by saying that we continue to have a …
  • of
  • large load customer agreements, which would drive significant affordability benefits for o…
  • outside of the partial revenue settlement with staff, including return on capital. If the …
  • the impact of new large load large load. In addition, we filed a partial stipulation and a…

Relative to our last rate case in Missouri Metro, the 2022 rate review, this increase would represent a 1.5% annualized impact. Relative to the end of 2017, ?the annualized impact is just 0.7%. Incredible story for our customers when compared to the rate trajectory of other Midwest utilities ?and the cumulative impact of inflation in the U.S. economy over the same time ?period. Missouri Metro is the first rate case ?that we have advanced with LLPS customers.

Delivering $6 million annually to the benefit of existing residential, customer, and industrial customers serves as an early and powerful example
?of how our large customer strategy can deliver meaningful affordability benefits to ?all. In addition, the agreement provides for an earnings sharing mechanism. ?In the event that large load revenues drive improvements in realized returns, earnings above the specified level would be shared 6535 between customers and shareholders, with customers receiving 65%.

Passages & reports (15)
  • Relative to our last rate case in Missouri Metro, the 2022 rate review, this increase woul…
  • the
  • annualized impact is just 0.7%. Incredible story for our customers when compared to the ra…
  • and
  • the cumulative impact of inflation in the U.S. economy over the same time
  • period.
  • Missouri Metro is the first rate case
  • that
  • we have advanced with LLPS customers. Delivering $6 million annually to the benefit of exi…
  • of
  • how our large customer strategy can deliver meaningful affordability benefits to
  • all. In
  • addition, the agreement provides for an earnings sharing mechanism.
  • In
  • the event that large load revenues drive improvements in realized returns, earnings above …

Speaker unclear

?We

Passages & reports (1)
  • We

Speaker 2

believe these settlements provide a constructive path forward for customers and the company. ?We expect a commission order in December with new rates in January 2027.

Passages & reports (3)
  • believe these settlements provide a constructive path forward for customers and the compan…
  • We
  • expect a commission order in December with new rates in January 2027.

Speaker unclear

?On

Passages & reports (1)
  • On

Speaker 2

slide 10, I'll provide a brief update on our regulatory priorities in Kansas and Missouri. In Kansas, our natural gas, solar, and battery storage predetermination proceeding is underway with an order expected by April 2027. These new resources are consistent with our all of the above approach to meeting growing customer demand while maintaining reliability and affordability. Staff testimony is due January 6th, followed by a settlement conference on February 4th. ?

On
October 29th, we requested approval of our LLPS Customer Affordability Enhancement Plan in Kansas. Since the approval of the LLPS tariff in November 2025, the marketplace for large load and new generation projects has continued to evolve. The enhancement plan is a proactive approach to build on the strong foundation of the LLPS tariff and add new tools, including a vintage cost rider to accommodate higher costs of new generation resources, as well as non refundable advanced payments. ?

In
tandem, these mechanisms would increase the financial contribution from new large load customers towards the investments needed to serve ?them. We believe these enhancements will generate additional affordability benefits for existing customers while further strengthening the financial framework supporting our large load growth strategy, all while ensuring transparency and strong oversight ?from the Kansas Corporation Commission and other stakeholders. ?While a procedural schedule has not yet been approved, we anticipate an order by mid year 2027.

Separately, we filed a motion seeking clarification under our existing LLPS tariff
?that would allow voluntary customer advanced payments prior to energization, a similar feature to the one filed as part of our customer affordability enhancement ?plan. We filed a settlement on October 30th, which, if approved, would apply these conditions to future customers taking service under the existing LLPS vintage. ?We anticipate a commission decision in the coming months.

Moving to Missouri,
?we filed a rate review for Missouri West on November 3rd. This case is primarily driven by new generation investments for which we've received CCN approvals, as well as beneficial grid monetization projects that improve reliability for our customers. As we've discussed in the past, Missouri West is our smallest utility with some of the lowest rates in the region and in the country, reflecting in part the need for significant infrastructure investment, including new dispatchable generation to reduce reliance on market energy.

These investments will enhance reliability while supporting economic development and load growth. Importantly, our request also reflects approximately $61 million of
revenue offset from large load customers, demonstrating how the benefits of load growth can accrue to existing customers in this jurisdiction similar to Missouri Metro. Longer term, as these benefits continue to grow as these customers ramp up, these new large customers, we remain confident in our ability to manage residential rate increases toward inflation while delivering the infrastructure needed to support reliability, economic development, and continued load growth. ?

We
look forward to working constructively with the Missouri Public Service Commission and stakeholders throughout the process ?to achieve a balanced outcome that supports much needed investment in Missouri West while maintaining competitive rates and delivering long term benefits for customers. Similar to Kansas, we also continue to make progress with our requests for generation investments for our Missouri customers. Our CCN request includes a new natural gas plant, solar farm, and battery storage facility. ?

A
settlement conference is scheduled for January 14th and evidentiary hearings on February 24th. And lastly, we were able to reach a non-unanimous stipulation and agreement ?for our CCN request for a second combustion turbine ?at Mullen Creek, ?and we anticipate a commission order by January. These proceedings represent important steps in advancing the generation of investments needed to support reliability and capacity needs for our growing customer base.

Passages & reports (37)
  • slide 10, I'll provide a brief update on our regulatory priorities in Kansas and Missouri.…
  • and affordability. Staff testimony is due January 6th, followed by a settlement conference…
  • On
  • October 29th, we requested approval of our LLPS Customer Affordability Enhancement Plan in…
  • LLPS tariff and add new tools, including a vintage cost rider to accommodate higher costs …
  • In
  • tandem, these mechanisms would increase the financial contribution from new large load cus…
  • them. We
  • believe these enhancements will generate additional affordability benefits for existing cu…
  • from
  • the Kansas Corporation Commission and other stakeholders.
  • While
  • a procedural schedule has not yet been approved, we anticipate an order by mid year 2027. …
  • that
  • would allow voluntary customer advanced payments prior to energization, a similar feature …
  • plan. We
  • filed a settlement on October 30th, which, if approved, would apply these conditions to fu…
  • We
  • anticipate a commission decision in the coming months. Moving to Missouri,
  • we
  • filed a rate review for Missouri West on November 3rd. This case is primarily driven by ne…
  • rates in the region and in the country, reflecting in part the need for significant infras…
  • revenue offset from large load customers, demonstrating how the benefits of load growth ca…
  • while delivering the infrastructure needed to support reliability, economic development, a…
  • We
  • look forward to working constructively with the Missouri Public Service Commission and sta…
  • to
  • achieve a balanced outcome that supports much needed investment in Missouri West while mai…
  • and battery storage facility.
  • A
  • settlement conference is scheduled for January 14th and evidentiary hearings on February 2…
  • for
  • our CCN request for a second combustion turbine
  • at
  • Mullen Creek,
  • and
  • we anticipate a commission order by January. These proceedings represent important steps i…

Speaker unclear

?I'll

Passages & reports (1)
  • I'll

Speaker 2

conclude on slide 11 with the core tenets of our strategy: affordability, reliability, and sustainability. Affordability remains central to our decision making. Our capital investment plan is elevated relative to historical levels, but so too is the low growth supporting ?it. Large customers pay premium rates and fund the direct costs required to serve them, while their additional usage spreads system cost over a larger base. ?

That
is the value of our large load growth strategy, investing meaningfully in the system while leveraging incremental demand from new large customers paying premium rates. And reliability is equally fundamental. We are investing in grid modernization, resiliency, and new generation capacity while maintaining strong operating performance across our transmission, distribution, and generation fleets. ?Our teams remain focused on safety, customer service, and dependable execution ?as we enter a period of significant construction and growth.

And with respect to sustainability, we are advancing a cost effective, all the above generation portfolio. Our planned investments in efficient and efficient natural gas generation, solar resources, and battery storage are designed to meet growing demand, preserve
reliability, and support the long-term prosperity of Kansas and Missouri. ?We have positive momentum, a clear strategy, and a motivated and aligned team. We are well positioned to convert unprecedented customer demand into durable long-term growth and meaningful affordability and economic development benefits ?for our customers and communities. ?

I
will now turn the call over to Thank you, David. Thank you, Pete, and good morning, everyone. I'll begin on slide 13 with a review of our third quarter results. For the third quarter of 2026, Evergy delivered adjusted earnings of $610 million or $2.58 per share compared to adjusted earnings of $475 million or $2.03 per share in the third quarter of 2025.

As shown on the slide from left to right, the year over year drivers were as follows. With other demand and large customer revenues contributed 46 cents per share. Cooling degree days were 31% higher than the third quarter
of 2025 and 26% above normal. This category also benefited from weather normalized demand growth of 4.5% and increased large customer revenues from data center projects currently operating.

Next, return on and recovery of regulated investments was driven by new retail rates in
our Kansas central jurisdiction ?and FERC regulated investments, which in total contributed 17 cents of EPS. Offsetting these favorable drivers was the combination of higher OM and increased depreciation and interest expense, net of AFUDC, related to our capital infrastructure investments, which drove a 15 cent decrease in EPS. And finally, other items increase earnings per share by 7 cents.

As David noted earlier, we've generated strong financial results through the third quarter and are are raising our full year 2026 adjusted EPS guidance range to $4.35 to $4.50 per share from our original
guidance range of $4.14 to $4.34 per share. ?Our updated guidance

Passages & reports (26)
  • conclude on slide 11 with the core tenets of our strategy: affordability, reliability, and…
  • it.
  • Large customers pay premium rates and fund the direct costs required to serve them, while …
  • That
  • is the value of our large load growth strategy, investing meaningfully in the system while…
  • transmission, distribution, and generation fleets.
  • Our
  • teams remain focused on safety, customer service, and dependable execution
  • as
  • we enter a period of significant construction and growth. And with respect to sustainabili…
  • reliability, and support the long-term prosperity of Kansas and Missouri.
  • We
  • have positive momentum, a clear strategy, and a motivated and aligned team. We are well po…
  • for
  • our customers and communities.
  • I
  • will now turn the call over to Thank you, David. Thank you, Pete, and good morning, everyo…
  • $475 million or $2.03 per share in the third quarter of 2025. As shown on the slide from l…
  • of 2025 and 26% above normal. This category also benefited from weather normalized demand …
  • our Kansas central jurisdiction
  • and
  • FERC regulated investments, which in total contributed 17 cents of EPS. Offsetting these f…
  • EPS. And finally, other items increase earnings per share by 7 cents. As David noted earli…
  • guidance range of $4.14 to $4.34 per share.
  • Our
  • updated guidance

Speaker unclear

?range includes an expectation to

Passages & reports (1)
  • range includes an expectation to

Speaker 2

make targeted OM reliability investments in our distribution grid and generation fleet during the fourth quarter. Turning to slide 14, I'll provide more detail on retail sales trends. Weather normalized retail demand was strong with 4.5% growth in the third quarter. That level of growth is worth highlighting. A 4.5% increase in weather-normalized electricity usage is well

Passages & reports (2)
  • make targeted OM reliability investments in our distribution grid and generation fleet dur…
  • 4.5% increase in weather-normalized electricity usage is well

Speaker 3

Unverified voice label

above what we've experienced in ?recent years and provides evidence of the step change and demand growth underway across our

Passages & reports (3)
  • above what we've experienced in
  • recent
  • years and provides evidence of the step change and demand growth underway across our

Speaker 2

service territory. ?We believe this marks the beginning of a period ?of transformational

Passages & reports (5)
  • service territory.
  • We
  • believe this marks the beginning of a period
  • of
  • transformational

Speaker unclear

?growth, which we expect will accelerate,

Passages & reports (1)
  • growth, which we expect will accelerate,

Speaker 3

especially beginning in 2028, and create meaningful benefits for our customers, our communities, and our company

Passages & reports (1)
  • especially beginning in 2028, and create meaningful benefits for our customers, our commun…

Speaker 2

in the years ahead. ?The weather

Passages & reports (3)
  • in the years ahead.
  • The
  • weather

Speaker unclear

?normalized

Passages & reports (1)
  • normalized

Speaker 3

load results in Q3 include residential demand, which increased 0.8%, commercial demand, which increased 8.7%, and industrial demand, which increased 3%.

Passages & reports (1)
  • load results in Q3 include residential demand, which increased 0.8%, commercial demand, wh…

Speaker 2

Commercial

Passages & reports (1)
  • Commercial

Speaker 3

growth reflects increased data center customer usage, while industrial results were driven primarily by Panasonic's continued ramp of operations. ?On a year-to-date basis through September 30th, weather-normalized retail demand is up 3.7% and tracking in line with our expectations for the full year of 3 to 4 percent. ?At a macro level, the robust customer demand in our service areas is supported by a solid labor market, as the Missouri, Kansas, ?and the Kansas City metropolitan area unemployment rates remain below the national average.

Our attractive service territories also continue to benefit from population growth and end migration, contributing to continued growth in residential customer counts. And few regions in the United States are as well
positioned to benefit from the accelerating investment cycle in power infrastructure and AI driven data centers as the Kansas City metro area, including the cities of Overland Park, Kansas, OneXa, Kansas, and Kansas City, Missouri, as well as many other towns throughout Kansas and Western Missouri.

The region's deep concentration of EPC firms and
highly skilled engineering talent creates a

Passages & reports (9)
  • growth reflects increased data center customer usage, while industrial results were driven…
  • On
  • a year-to-date basis through September 30th, weather-normalized retail demand is up 3.7% a…
  • At
  • a macro level, the robust customer demand in our service areas is supported by a solid lab…
  • and
  • the Kansas City metropolitan area unemployment rates remain below the national average. Ou…
  • positioned to benefit from the accelerating investment cycle in power infrastructure and A…
  • highly skilled engineering talent creates a

Speaker 2

competitive

Passages & reports (1)
  • competitive

Speaker 3

advantage that should drive sustained economic development, employment growth, and increased electricity demand across both Kansas and Missouri for years to ?come. Moving to slide 15, we highlight

Passages & reports (3)
  • advantage that should drive sustained economic development, employment growth, and increas…
  • come.
  • Moving to slide 15, we highlight

Speaker 2

our

Passages & reports (1)
  • our

Speaker 3

updated

Passages & reports (1)
  • updated

Speaker 2

large

Passages & reports (1)
  • large

Speaker 3

load

Passages & reports (1)
  • load

Speaker 2

demand growth profile.

Passages & reports (1)
  • demand growth profile.

Speaker unclear

?The

Passages & reports (1)
  • The

Speaker 3

five executed LLPS ESAs, together with non-LLPS customers, are expected to support 3.1 gigawatts of peak load over time, including today's binding ESA agreements that added 110 megawatts of peak and increased load across each year 2027 through 2030. In total, aggregate large customer demand is expected to build from approximately 350 to 400 megawatts today to approximately 2,250 megawatts in 2030, further expanding to 3,100 megawatts post-2030 at its peak.

As a reminder, Digital Realty's 1.4
gigawatt expansion project ?and the aforementioned 140 megawatt expansion agreement are not reflected in these numbers ?and therefore would represent upside to this forecast, potentially as early as 2029 and 2030. ?This chart illustrates a powerful period of growth

Passages & reports (9)
  • five executed LLPS ESAs, together with non-LLPS customers, are expected to support 3.1 gig…
  • In total, aggregate large customer demand is expected to build from approximately 350 to 4…
  • gigawatt expansion project
  • and
  • the aforementioned 140 megawatt expansion agreement are not reflected in these numbers
  • and
  • therefore would represent upside to this forecast, potentially as early as 2029 and 2030.
  • This
  • chart illustrates a powerful period of growth

Speaker 2

anchored by

Passages & reports (1)
  • anchored by

Speaker 3

long-term contracts

Passages & reports (1)
  • long-term contracts

Speaker unclear

?and

Passages & reports (1)
  • and

Speaker 2

clear

Passages & reports (1)
  • clear

Speaker 3

parameters on monthly billings,

Passages & reports (1)
  • parameters on monthly billings,

Speaker 2

providing

Passages & reports (1)
  • providing

Speaker 3

significant

Passages & reports (1)
  • significant

Speaker 2

visibility

Passages & reports (1)
  • visibility

Speaker unclear

?into

Passages & reports (1)
  • into

Speaker 3

our ?earnings growth and cash flow streams ?for the ESA L LPS contract terms that are generally spanning 16 to 17 years.

Passages & reports (5)
  • our
  • earnings
  • growth and cash flow streams
  • for
  • the ESA L LPS contract terms that are generally spanning 16 to 17 years.

Speaker unclear

?In

Passages & reports (1)
  • In

Speaker 2

addition, we continue to make strong progress with several other large customers across

Passages & reports (1)
  • addition, we continue to make strong progress with several other large customers across

Speaker 3

multiple industries

Passages & reports (1)
  • multiple industries

Speaker unclear

?and

Passages & reports (1)
  • and

Speaker 2

remain very confident in the cut in the pipeline and our ability to continue converting these opportunities into executed ESAs for the next several quarters. The associated load and capacity from

Passages & reports (1)
  • remain very confident in the cut in the pipeline and our ability to continue converting th…

Speaker 3

these potential incremental ESAs would represent further upside to load growth over the long term and importantly has the potential to extend our exceptional load growth well into the 2030s. ?As David described, we will continue working in a measured and disciplined manner through our substantial pipeline of prospective customers to build on the success we have achieved today. Let's close on slide 16 by summarizing our long-term growth outlook.

First, based on signed ESAs and announced large customers that we expect will ultimately reach
a steady state of 3.1 gigawatts, we forecast retail demand to grow approximately 7 to 8% annually through 2030. Additional ESAs would extend this growth profile with the largest impact expected in the 2030s. Secondly, our $21.6 billion capital plan supports strong foundational earnings growth. In fact, our 2026 IRP preferred plans provide approximately $1 billion of incremental investment, taking our estimate of five-year CapEx through 2030 to $22.5 billion, increasing, which increases our projected rate-based Kager through 2030 from 11.5% to approximately 12%.

Additional large load ESAs would provide further investment upside, and we'll update our capital plan on our fourth call in February. Regarding the digital reality expansion project, we anticipate owning the vast majority of the generation resources needed to serve their load. For this project alone, we anticipate capital investments could
be in a neighborhood of $4 billion. To fund our investment plan, we will use we will utilize our expected strong cash flow from operations and reinvested earnings, along with a prudent mix of debt and equity financing to support our strong investment grade credit rating and FFO to debt that we currently project to be in the range of 14 to 15 percent from 2026 to 2028, continuing to strengthen in 2029 and 2030. ?

On
the equity front, we have made solid progress utilizing our ATM program with approximately $700 million of common equity priced as compared to our forecasted average of approximately $700 to $900 million annually through 2029. ?We have used our ATM program throughout this year to meet all of our equity needs. Similarly, as we think about the rest of this year, we believe that our remaining needs will be addressable through issuances under our existing or any potential replacement ATM program.

Turning to our EPS outlook, we are reaffirming our long
term adjusted EPS growth target through 2030 of 6 to 8% plus, measured from the original 2026 midpoint of $4.24 per share. For 2027, we are reaffirming our expectation to grow earnings per share in the 6 to 8% range. And we continue to expect adjusted EPS growth to exceed 8% annually beginning 2028 and through 2030.

As we have discussed on prior calls, we continue to forecast an approximate 250 basis point delta between rate base growth and EPS growth in 2028 and through 2030, compared against an approximate 12%
rate base Kager discussed earlier. Driving on average 9.5% EPS growth annually in those three years. As a reminder, our financial forecast only incorporates the ESAs we assigned today, with further upside to and/or extension of our exceptional growth well into the 2030s if additional ESAs of significance are signed in the future.

In summary, continued execution of our large customer strategy is further strengthening our financial outlook, supporting long-term growth, and delivering meaningful affordability benefits for our customers. Lastly, with respect to the current year EPA EPS outlook, we are
raising our 2026 adjusted EPS guidance range to $4.35 to $4.50 per share compared to our prior range of $4.14 to $4.34 per share, primarily due to favorable weather in the third quarter.

I'd like to join David in thanking all of our employees for the strong operational and
financial results year to date and most importantly for working safely ?and keeping our customer rates at some of the lowest in the nation. And with that, we will open the call for your questions.

Passages & reports (20)
  • these potential incremental ESAs would represent further upside to load growth over the lo…
  • As
  • David described, we will continue working in a measured and disciplined manner through our…
  • a steady state of 3.1 gigawatts, we forecast retail demand to grow approximately 7 to 8% a…
  • earnings growth. In fact, our 2026 IRP preferred plans provide approximately $1 billion of…
  • 12%. Additional large load ESAs would provide further investment upside, and we'll update …
  • be in a neighborhood of $4 billion. To fund our investment plan, we will use we will utili…
  • be in the range of 14 to 15 percent from 2026 to 2028, continuing to strengthen in 2029 an…
  • On
  • the equity front, we have made solid progress utilizing our ATM program with approximately…
  • We
  • have used our ATM program throughout this year to meet all of our equity needs. Similarly,…
  • term adjusted EPS growth target through 2030 of 6 to 8% plus, measured from the original 2…
  • EPS growth to exceed 8% annually beginning 2028 and through 2030. As we have discussed on …
  • rate base Kager discussed earlier. Driving on average 9.5% EPS growth annually in those th…
  • significance are signed in the future. In summary, continued execution of our large custom…
  • raising our 2026 adjusted EPS guidance range to $4.35 to $4.50 per share compared to our p…
  • financial results year to date and most importantly for working safely
  • and
  • keeping our customer rates at some of the lowest in the nation. And with that, we will ope…

Speaker 0

Thank you. At this time, we will conduct the question and answer session. As a reminder, to ask a question, you will need to press star one one on your telephone and wait for your name to be announced. To withdraw your question, please press star one one again. Please stand by while we compile

Passages & reports (1)
  • Thank you. At this time, we will conduct the question and answer session. As a reminder, t…

Questions & answers

Speaker 0

the QA roster.

Passages & reports (1)
  • the QA roster.

Speaker 0

Our first question comes from the line of Richard Sunderland of Truist Securities. Your line is now open.

Passages & reports (1)
  • Our first question comes from the line of Richard Sunderland of Truist Securities. Your li…

Speaker 1

Hey, good morning.

Passages & reports (1)
  • Hey, good morning.

Speaker unclear

?Thank

Passages & reports (1)
  • Thank

Speaker 4

Unverified voice label

you for the

Passages & reports (1)
  • you for the

Speaker unclear

?time today.

Passages & reports (1)
  • time today.

Speaker 3

Good morning.

Passages & reports (1)
  • Good morning.

Speaker 2

Morning.

Passages & reports (1)
  • Morning.

Speaker 4

I um I wanted to start with that DLR update. The four billion CapEx potential for that project. Could you speak to how much that could fall in the next five year period and what impact they may that may have on the kind of twelve percent upside rate based growth you quantified in the script

Passages & reports (2)
  • I um I wanted to start with that DLR update. The four billion CapEx potential for that pro…
  • script

Speaker unclear

?there?

Passages & reports (1)
  • there?

Speaker 2

We won't go into those details today, but I will emphasize that this is a site where DLR has shown strong interest. You've heard them comment on it really for the past several months. It's at a great location for this kind of development. It's the old Sunflower U.S. Army ammunition plant. It's over 9,000 acres, which is almost 60% the size of the island of Manhattan.

So it it's an old uh ammunition plant that's been remediated. It's well suited for industrial uses now, but uh really for that kind of uh purpose. So we're thrilled that DLRs made their big investment in that territory. Um and the uh
LOI that we've signed reflects alignment on commercial terms, uh contemplates that we need to make sure ?they get any remaining local approvals and it is aligned with our enhanced uh tariff that we're seeking approval for.

So we expect to sign an ESA in the first half of uh 2027. The timeline for it, the bulk of that is really into the 2030s. Um, but we'll really give details about uh the
specifics once we get that sign. But we're very excited about that opportunity, sufficiently so that we're comfortable announcing it on today's call. And as well, we anticipate that we would be providing the capacity to serve, which is Ryan described as in and of itself in the range of four billion of capital.

Now,
typically that capital trends along with uh when the ramp rate will occur, and you need to have it in place ?a little bit in advance. Again, the the bulk of this would probably be in uh 2030 and beyond when it really hits its ramp. But there'd be meaningful capital that would be associated with this. And under a structure with enhanced uh provisions on the LLPS, all reflecting really our twin objectives, making sure that we've got a tariff where the large customers are paying their direct costs and their share of uh any incremental system costs so that they're real benefits driven to existing customers, and making sure it's that it's sites that really make sense for this kind of activity. ?

So,
again, we'll more details when we uh sign the ESA and give a broader update. But we're really excited about this partnership and opportunity.

Passages & reports (12)
  • We won't go into those details today, but I will emphasize that this is a site where DLR h…
  • acres, which is almost 60% the size of the island of Manhattan. So it it's an old uh ammun…
  • LOI that we've signed reflects alignment on commercial terms, uh contemplates that we need…
  • they
  • get any remaining local approvals and it is aligned with our enhanced uh tariff that we're…
  • specifics once we get that sign. But we're very excited about that opportunity, sufficient…
  • typically that capital trends along with uh when the ramp rate will occur, and you need to…
  • a
  • little bit in advance. Again, the the bulk of this would probably be in uh 2030 and beyond…
  • we've got a tariff where the large customers are paying their direct costs and their share…
  • So,
  • again, we'll more details when we uh sign the ESA and give a broader update. But we're rea…

Speaker unclear

?So

Passages & reports (1)
  • So

Speaker 4

that's it's an helpful overview, and maybe I'll follow up on that last point around the enhanced LLPS. ?Um you speak a little bit more to kind of the process out of that filing, is ?um is it something you could see settled on a more expedited basis than kind of a full procedural schedule contemplates? And I guess if settled, could that also expedite finalizing the the DLR ESA?

Passages & reports (5)
  • that's it's an helpful overview, and maybe I'll follow up on that last point around the en…
  • Um
  • you speak a little bit more to kind of the process out of that filing, is
  • um
  • is it something you could see settled on a more expedited basis than kind of a full proced…

Speaker unclear

?You

Passages & reports (1)
  • You

Speaker 2

know, I I I it's a great question. I do think it is a proceeding that can move under uh ?a more accelerated schedule, certainly than relative to a rate case, but it is a proceeding where you want to make sure you get full input from stakeholders ?and full commission oversight. You'll recall we went through ?the process with the original large load power service tariff because we wanted to make sure we had something ?that had full input and oversight.

And that
?we signed that first wave of ESAs after we got the that LLPS finalized. And that that agreement in Kansas, I'll remind you, was ?a unanimous settlement. So the residential representative curb, ?a representative of the large industrial customers, existing customers, staff, all the stakeholders were participants ?in that settlement, which ultimately was approved by the commission. So we see the value of going through the process.

I do think that it will we do expect it to resolve in the first half of the year.

Passages & reports (17)
  • know, I I I it's a great question. I do think it is a proceeding that can move under uh
  • a
  • more accelerated schedule, certainly than relative to a rate case, but it is a proceeding …
  • and
  • full commission oversight. You'll recall we went through
  • the
  • process with the original large load power service tariff because we wanted to make sure w…
  • that
  • had full input and oversight. And that
  • we
  • signed that first wave of ESAs after we got the that LLPS finalized. And that that agreeme…
  • a
  • unanimous settlement. So the residential representative curb,
  • a
  • representative of the large industrial customers, existing customers, staff, all the stake…
  • in
  • that settlement, which ultimately was approved by the commission. So we see the value of g…

Speaker 2

So I'm we like this approach because it makes sure that we're delivering on ?that uh protections for existing customers that actually end up delivering benefits for customers and having a site that everyone's aligned ?with. So we expect those to move in tandem with the ESA in the first half of the

Passages & reports (5)
  • So I'm we like this approach because it makes sure that we're delivering on
  • that
  • uh protections for existing customers that actually end up delivering benefits for custome…
  • with. So
  • we expect those to move in tandem with the ESA in the first half of the

Speaker unclear

?year.

Passages & reports (1)
  • year.

Speaker 4

Very clear. Thanks for the

Passages & reports (1)
  • Very clear. Thanks for the

Speaker unclear

?time. Thank

Passages & reports (1)
  • time. Thank

Speaker 0

you. Thank you. One moment for our next question.

Passages & reports (1)
  • you. Thank you. One moment for our next question.

Speaker 0

Our next question comes from the line of Nicholas Campanella of Barclays. Your line is now open.

Passages & reports (1)
  • Our next question comes from the line of Nicholas Campanella of Barclays. Your line is now…

Speaker unclear

?Hey, good morning.

Passages & reports (1)
  • Hey, good morning.

Speaker 4

Thanks the time and for

Passages & reports (1)
  • Thanks the time and for

Speaker unclear

?all the updates.

Passages & reports (1)
  • all the updates.

Speaker 2

Good morning.

Passages & reports (1)
  • Good morning.

Speaker 3

Good morning.

Passages & reports (1)
  • Good morning.

Speaker 5

Unverified voice label

So hey, I just wanted to ask, just with the new leadership in the state of Kansas, ?you know, obviously there's been differing views on large load customers through elections broadly. But you also have many opportunities that are in the tier one bucket that are just expansions of current sites that I believe are already permitted or maybe ready to go. Can you just talk to how resilient the pipeline is if there is a change in policy, understanding that there is real economic development and affordability benefits to these customers.

Because you talked about it all. Thanks.

Passages & reports (4)
  • So hey, I just wanted to ask, just with the new leadership in the state of Kansas,
  • you know,
  • obviously there's been differing views on large load customers through elections broadly. …
  • is a change in policy, understanding that there is real economic development and affordabi…

Speaker unclear

?You

Passages & reports (1)
  • You

Speaker 2

bet, Nick, then great question and thank you. So I'll I'll first note that we look forward to working with Governor Like Culture in Kansas. We know her from her service in the Kansas Senate, where she has a collaborative legislator and supportive generally of critical infrastructure serve Kansas. I'll note that there weren't really any major statewide elections in Missouri, so Governor Kehoe, key state leaders are still in place there.

What I'll r remind folks of about uh Kansas, um, big change with respect to uh electing a Democratic U.S. Senator. That hadn't happened for over 90 years. But in this in the state elections in Kansas, unlike
some of the other states where there's a lot of news, what the result of those state elections is actually a continuation of the status quo. ?Um outgoing Governor Kelly is a two-term Democratic governor.

We work collaboratively with her throughout her eight years, and we thank her for her service to the state. Throughout that time, there has been a Republican majority Kansas Senate
?and a Republican majority Kansas House. And that's actually the status quo that will continue after this week's election. So a Democratic governor and a Republican majority Senate and Republican majority House. And with that split between the branches of government, we worked effectively throughout that time, including passage of some very important legislation supporting infrastructure development and economic development in recent years. ?

So
overall, we continue to have high confidence in achieving five to seven gigawatts of large load customer agreements. So capitalizing on the pipeline that we have. As you noted, a big chunk of that are expansion and existing sites, and it's a pipeline that's balanced across both states. Once you take account of the DLR letter of intent that we signed today, the majority of the expansion opportunities ?and advanced discussions in Tier 1 and 2 are actually on the Missouri side.

But as you noted, what I'd emphasize is that our approach that we'll continue to take in both states is one that really focuses on making sure that we have a tariff in place
?that has large load customers paying directly for what they the costs we need to incur and making sure that they're paying their share of incremental system costs so that it's really delivering best benefits for existing customers. ?

So
why we filed for the enhanced tariff. And we're also really focused on sites that work well for local communities. And the Sunflower site for DLR is LOI is a great example of that. It's ?a site that really is only going to be well suited for industrial applications like this one and a massive, massive acreage, so you can uh have it at the in the right location. ?

So
we feel good about our pipeline, the benefits it will deliver as we look across our two states. And as you know, in particular, as we look at a lot of these are expansions and robust pipeline ?and uh across both Missouri and Kansas.

Passages & reports (23)
  • bet, Nick, then great question and thank you. So I'll I'll first note that we look forward…
  • any major statewide elections in Missouri, so Governor Kehoe, key state leaders are still …
  • some of the other states where there's a lot of news, what the result of those state elect…
  • Um
  • outgoing Governor Kelly is a two-term Democratic governor. We work collaboratively with he…
  • and
  • a Republican majority Kansas House. And that's actually the status quo that will continue …
  • throughout that time, including passage of some very important legislation supporting infr…
  • So
  • overall, we continue to have high confidence in achieving five to seven gigawatts of large…
  • letter of intent that we signed today, the majority of the expansion opportunities
  • and
  • advanced discussions in Tier 1 and 2 are actually on the Missouri side. But as you noted, …
  • that has
  • large load customers paying directly for what they the costs we need to incur and making s…
  • So
  • why we filed for the enhanced tariff. And we're also really focused on sites that work wel…
  • a
  • site that really is only going to be well suited for industrial applications like this one…
  • So
  • we feel good about our pipeline, the benefits it will deliver as we look across our two st…
  • and
  • uh across both Missouri and Kansas.

Speaker unclear

?Hey,

Passages & reports (1)
  • Hey,

Speaker 5

that's great. I really appreciate it. And then uh thanks for the the the the commentary on the $4 billion for DLR. Just um as we think about additional opportunities, you know, maybe outside of generation, ?you know, SPP and the new ITP portfolios uh for 20 seven have been getting previewed and obviously those are gonna get whittled down, but could you just give any sense of how much capital would be at play there?

And um I know a lot of this would maybe be beyond twenty thirty, but is
there a way to kind of put a framework around what the available opportunity set is for the next uh ITP? Thanks.

Passages & reports (4)
  • that's great. I really appreciate it. And then uh thanks for the the the the commentary on…
  • you
  • know, SPP and the new ITP portfolios uh for 20 seven have been getting previewed and obvio…
  • there a way to kind of put a framework around what the available opportunity set is for th…

Speaker unclear

?Yeah,

Passages & reports (1)
  • Yeah,

Speaker 1

Nick, it's probably early

Passages & reports (1)
  • Nick, it's probably early

Speaker 2

days to specify what the exact opportunity is, other than to note that as you cited, it's a very robust overall program, the integrated transition plan that uh SPP released, about 20 billion, about 10 billion of that involving projects ?that span across our service territory. ?Now there can be some important decisions to be made that haven't yet been made how much of those will be competitively bid, uh, how much uh will be noticeable proceeded projects given a short-term reliability timeline.

That will have implications. And also what the ultimate timeline is to build.
?A big chunk of those are 765 lines, which are certainly more efficient relative to the overall cost and land usage if you're gonna have to build two 345s, ?but not much precedent for building those yet, certainly across our service territory. So there's still some work to do. ?I would describe it as long-term upside.

It's not in our current capital plan. Um and as we described, there's some stiff drivers of additional upside in the capital plan that we see. So there's potential opportunity into the 2030s. I've been around long distance and long-term transmission build earlier in my career, so it it
?I share with you, it's likely into the 2030s. ?So I view it as something that could be a driver into the 2030s, not only incremental ESAs that carry us into the decade.

That's also when we get into a retirement phase for some of our older uh coal units. Uh we have a number of wind and removal PPAs overall off in the time
frame. I expect electrification will be a driver. And this transmission is another piece. It's a uh part of the overall long-term tailwind that I'd cite.

Passages & reports (16)
  • days to specify what the exact opportunity is, other than to note that as you cited, it's …
  • that
  • span across our service territory.
  • Now
  • there can be some important decisions to be made that haven't yet been made how much of th…
  • A
  • big chunk of those are 765 lines, which are certainly more efficient relative to the overa…
  • but not
  • much precedent for building those yet, certainly across our service territory. So there's …
  • I
  • would describe it as long-term upside. It's not in our current capital plan. Um and as we …
  • I
  • share with you, it's likely into the 2030s.
  • So
  • I view it as something that could be a driver into the 2030s, not only incremental ESAs th…
  • frame. I expect electrification will be a driver. And this transmission is another piece. …

Speaker 5

Appreciate all the thoughts. Thanks, guys.

Passages & reports (1)
  • Appreciate all the thoughts. Thanks, guys.

Speaker 2

Thank you.

Passages & reports (1)
  • Thank you.

Speaker 0

Thank you. One moment for our next question.

Passages & reports (1)
  • Thank you. One moment for our next question.

Speaker 0

Our next question comes from the line of Steve D'Ambrizi from RBC Capital Markets. Your line is now open.

Passages & reports (1)
  • Our next question comes from the line of Steve D'Ambrizi from RBC Capital Markets. Your li…

Speaker unclear

?Hey David and Brian, good morning. Thanks for taking my question. Morning.

Passages & reports (1)
  • Hey David and Brian, good morning. Thanks for taking my question. Morning.

Speaker 6

Unverified voice label

Can you talk about a little bit about the resource mix that you think is appropriate to serve that? And then I just have a follow-up.

Passages & reports (1)
  • Can you talk about a little bit about the resource mix that you think is appropriate to se…

Speaker 1

Sure. I think if you you'll

Passages & reports (1)
  • Sure. I think if you you'll

Speaker 2

see in our slides ?a listing of the things that are included in our most recent integrated resource plan. Now, those are our resources that are serving the agreements that we've already signed. But the mix that you'll see, I think, is pretty representative of what we'd look for going forward. There's a need for dispatchable baseload generation, so the highly efficient natural gas resources that we've been invest committed to investing in so far in the receiver approval, we expect to continue to be an important part of the mix.

But along with that, solar and storage. Um it's possible that uh over time some of the large customers will bring resources in the
system, but most of the customers with whom we're having discussions now are looking for us to provide the capacity and the system resource. So I think that mix ?of uh renewables and uh natural gas with a little bit of uh a balance towards ?uh dispatchable generation to make sure that we can meet ?uh the capacity and energy needs of large customers, I expect you'll see that as pretty representative going forward as

Passages & reports (11)
  • see in our slides
  • a
  • listing of the things that are included in our most recent integrated resource plan. Now, …
  • highly efficient natural gas resources that we've been invest committed to investing in so…
  • system, but most of the customers with whom we're having discussions now are looking for u…
  • of
  • uh renewables and uh natural gas with a little bit of uh a balance towards
  • uh
  • dispatchable generation to make sure that we can meet
  • uh
  • the capacity and energy needs of large customers, I expect you'll see that as pretty repre…

Speaker unclear

?well. Yeah,

Passages & reports (1)
  • well. Yeah,

Speaker 3

and Steve, just to add to that, uh, ?you know, as you think about the ramp rate for digital reality, it'd probably start in twenty twenty nine, really kicks in in earnest in twenty thirty, um, and then ramps up each year there thereafter through twenty thirty three. ?So as David mentioned, you're looking at something that looks like solar and battery storage by twenty thirty, twenty thirty one.

So some of that capital would come in service, you know, within our new five year plan that we'll roll out in February. Um or or whenever we update the five the five year five
year plan for digital reality could ?be um you know a few months after February. ?But that uh that's that's a mix that'll you'll see uh once we finalize that ESA come into a five-year view.

Um and we kind of just have a rule of thumb when you think about a one-gig customer and whether it's digital reality or or others, we should we could have several
?of those type projects going forward. Uh you know, the rough math on that is about three thousand dollars a KW. That's kind of the going right rate for a combined cycle today, which continues to go ?up.

Uh, but think about a we we we we use about a three billion dollar per
?uh of CapEx per uh gigawatt of customer and ?uh we expect to have have uh multiple of those over time and um are adding up to multiple over time and um a rule of thumb to our rate based kegers that that would roughly equate to about two hundred basis point increase to uh to rate rate based growth.

Passages & reports (18)
  • and Steve, just to add to that, uh,
  • you
  • know, as you think about the ramp rate for digital reality, it'd probably start in twenty …
  • So
  • as David mentioned, you're looking at something that looks like solar and battery storage …
  • year plan for digital reality could
  • be
  • um you know a few months after February.
  • But
  • that uh that's that's a mix that'll you'll see uh once we finalize that ESA come into a fi…
  • of
  • those type projects going forward. Uh you know, the rough math on that is about three thou…
  • up.
  • Uh, but think about a we we we we use about a three billion dollar per
  • uh
  • of CapEx per uh gigawatt of customer and
  • uh
  • we expect to have have uh multiple of those over time and um are adding up to multiple ove…

Speaker 6

Very helpful. And Brian you kinda you kind of you know

Passages & reports (1)
  • Very helpful. And Brian you kinda you kind of you know

Speaker 3

I maybe

Passages & reports (1)
  • I maybe

Speaker 6

I bury the lead

Passages & reports (1)
  • I bury the lead

Speaker 3

or you kinda

Passages & reports (1)
  • or you kinda

Speaker 6

answered my next question, but i with the rest of the expansion up so expansion opportunities bucket, if if digital realty is one point four ?and then you've got the hundred and forty megawatts. I mean, we've been tracking obviously a a very large opportunity in Missouri that we think is in that bucket. Just can you talk a little bit about um, ?you know, w I guess can you talk a little bit about what what is the rest of that two to two and a half expansion opportunities bucket look like?

And then what are the gating items to you know converting that into ESAs? Because it does seem like there's uh you know a significant amount
of activity at some of these sites. Thanks.

Passages & reports (6)
  • answered my next question, but i with the rest of the expansion up so expansion opportunit…
  • and
  • then you've got the hundred and forty megawatts. I mean, we've been tracking obviously a a…
  • you
  • know, w I guess can you talk a little bit about what what is the rest of that two to two a…
  • of activity at some of these sites. Thanks.

Speaker 3

Yeah. Steve, I I think it's it's similar to what uh David described around digitality. The the uh those that pipeline is is real, they have real sites, uh they they still need to get through uh their full suite of local permitting. Um you know for the larger uh expansion opportunities or new projects uh you're gonna see those fall under uh an enhanced type of LLPS, similar to the one that we've filed in Kansas, and one that David described.

That'll make sure they're paying their full fair share. It'll cover aspects such as C Whip and rates, which will provide again additional affordability benefits for customers,
as well as allow for advanced payments of future revenue streams. So it's it's a really uh broad type of LLPS framework as we move into some of these larger loads for the next wave of customers. We feel great about them across both states.

The pipeline, as David mentioned, is deep in both states.

Passages & reports (3)
  • Yeah. Steve, I I think it's it's similar to what uh David described around digitality. The…
  • uh you're gonna see those fall under uh an enhanced type of LLPS, similar to the one that …
  • as well as allow for advanced payments of future revenue streams. So it's it's a really uh…

And so if we ever um and so I just kind of leave it at that, Steve, it's it's just uh one that we continue to have a very high level of confidence in achieving the total five to seven gigawatt opportunity and we'll continue to finance it in a balanced way like we have in the past.

Passages & reports (2)
  • And so if we ever um and so I just kind of leave it at that, Steve, it's it's just uh one …
  • in the past.

Speaker unclear

?I

Passages & reports (1)
  • I

Speaker 3

appreciate all the time. Thanks

Passages & reports (1)
  • appreciate all the time. Thanks

Speaker unclear

?very much

Passages & reports (1)
  • very much

Speaker 6

guys.

Passages & reports (1)
  • guys.

Speaker 3

Thank you.

Passages & reports (1)
  • Thank you.

Speaker 0

Thank you. One moment for our next question.

Passages & reports (1)
  • Thank you. One moment for our next question.

Speaker 0

Our next question comes from the line of Shar Pereza of Wells Fargo. Your line is now open.

Passages & reports (1)
  • Our next question comes from the line of Shar Pereza of Wells Fargo. Your line is now open…

Speaker unclear

?Hi

Passages & reports (1)
  • Hi

Speaker 5

guys. It's actually Andrew Cadavion for Shar. Thanks for taking my questions.

Passages & reports (1)
  • guys. It's actually Andrew Cadavion for Shar. Thanks for taking my questions.

Speaker 1

Morning, Andrew.

Passages & reports (1)
  • Morning, Andrew.

Speaker 5

Morning. So with with the large load pipeline additions and some possibility

Passages & reports (1)
  • Morning. So with with the large load pipeline additions and some possibility

Speaker unclear

?of

Passages & reports (1)
  • of

Speaker 7

Unverified voice label

having some advanced payments, can you talk about maybe the impact that might have on your equity issuance plans moving forward? And could that also maybe push out some future race rate cases?

Passages & reports (1)
  • having some advanced payments, can you talk about maybe the impact that might have on your…

Speaker unclear

?So

Passages & reports (1)
  • So

Speaker 2

I'll ask Brian to supplement, but you've hit on it. I think there's several features of the enhanced LLPS that are attractive. One is that it's uh in effect uh adding to the LLPS structure, given that the cost of new build is rising. Uh we're making adjustments to the LLPS to take account of those higher costs and making sure the new customers are paying for that and paying their fair share.

And there's also a feature that has advanced payments. That mitigates the financial impact of CWIP, potential financial impact of C WIP during the build-out phase before the customers reach their full
ramp. And as the knock-on effect also helps from an uh overall cash flow perspective because you're making sure that you're receiving some cash payments uh as you're going through that build-out phase.

So I think it is a most importantly uh a set of enhancements that ensure that we have protections for existing
customers and are delivering benefits for existing customers ?and we're adjusting the market circumstances that it as they evolve. But I think it's also a mechanism that can allow for a little bit more efficient uh overall financing strategy. And as ?we you know announce CSAs and uh potential expansions to capital plans associated with them, obviously we'll talk about the genetic strategy associated with it.

I don't know if there's anything you'd add. No, nothing to add.

Passages & reports (8)
  • I'll ask Brian to supplement, but you've hit on it. I think there's several features of th…
  • those higher costs and making sure the new customers are paying for that and paying their …
  • ramp. And as the knock-on effect also helps from an uh overall cash flow perspective becau…
  • customers and are delivering benefits for existing customers
  • and
  • we're adjusting the market circumstances that it as they evolve. But I think it's also a m…
  • we you
  • know announce CSAs and uh potential expansions to capital plans associated with them, obvi…

Speaker 3

Andrew, did that answer answer your question?

Passages & reports (1)
  • Andrew, did that answer answer your question?

Speaker 7

Yes, very helpful. And then uh ?you know, we've seen the weather be both the headwind and a tailwind for Evergy. With the data center load ramping, does the cooling load that it brings online, does that increase EPS sensitivity to weather, or or would the higher base load kind of reduce that sensitivity?

Passages & reports (3)
  • Yes, very helpful. And then uh
  • you
  • know, we've seen the weather be both the headwind and a tailwind for Evergy. With the data…

Speaker 1

Well,

Passages & reports (1)
  • Well,

Speaker unclear

?I

Passages & reports (1)
  • I

Speaker 2

I think net overall will likely reduce the sensitivity. You're going to have some high, a significantly higher percentage of high load factor customers whose load levels are going to ?be more consistent than the current mix, which is still relatively highly weighted as legacy of the old Great Plains business. We've got a pretty high mix of residential and commercial that's more sensitive to weather.

So I think as we add the higher load factor customers, they're not immune to the temperature, but their load
factors are more driven by the underlying demand for the servers and other equipment that they're running. So we think it will reduce over time. We'll continue to evaluate as it makes sense in our jurisdictions whether they're whether there are mechanisms to sort of dampen the impact ?of weather.

I've now
?uh been at Evergy. This is my sixth year, ?and um there have been some significant volatility in weather, and that ?uh can go to customers' benefits in years like 24 and 25 when it's a milder summer and lower bills, and then when they're years like uh 22 and 26, when it's a hot summer, it just creates a little more volatility.

So there
?are many jurisdictions that have opted for some dampening or smoothing. Not something that's been of interest in the past for our regulators, but that may be a conversation to have over time. But to your point, the mix overall will shift in a way that will uh reduce the overall sensitivity, at least on a percentage basis.

Passages & reports (15)
  • I think net overall will likely reduce the sensitivity. You're going to have some high, a …
  • be
  • more consistent than the current mix, which is still relatively highly weighted as legacy …
  • factors are more driven by the underlying demand for the servers and other equipment that …
  • of
  • weather. I've now
  • uh
  • been at Evergy. This is my sixth year,
  • and
  • um there have been some significant volatility in weather, and that
  • uh
  • can go to customers' benefits in years like 24 and 25 when it's a milder summer and lower …
  • are
  • many jurisdictions that have opted for some dampening or smoothing. Not something that's b…
  • percentage basis.

Speaker 7

Great. I'll leave it there. Thank

Passages & reports (1)
  • Great. I'll leave it there. Thank

Speaker unclear

?you.

Passages & reports (1)
  • you.

Speaker 0

Thank you. This concludes the question and answer session. I would now like to turn it back to David Campbell, Chairman and CEO, for closing remarks.

Passages & reports (1)
  • Thank you. This concludes the question and answer session. I would now like to turn it bac…

Speaker 2

Great. Thank you, Kelly. And thanks everyone for your interest.

Passages & reports (1)
  • Great. Thank you, Kelly. And thanks everyone for your interest.

Sorry, I think the uh mic would have been on there for someone. Thank you, Kelly, and thanks everyone for uh your participation in today's call. We look forward to seeing you uh at EEI and have a great day. We'll wrap up

Passages & reports (1)
  • Sorry, I think the uh mic would have been on there for someone. Thank you, Kelly, and than…

Speaker unclear

?there.

Passages & reports (1)
  • there.

Speaker 0

Thank you for your participation in today's conference. This does conclude the program. You may now disconnect.

Passages & reports (1)
  • Thank you for your participation in today's conference. This does conclude the program. Yo…
Source, accuracy & exportsMay contain errorsAccuracy unmeasured. Speakers are anonymous voice labels, local to this call. No names are verified. Section starts and timestamps are inferred. Speakers are anonymous voice labels, local to this call. No names are verified. Section starts and timestamps are inferred.

Short unclear spans may appear inline between matching voice IDs. The ? marker retains unknown attribution; no voice identity is inferred for those words.

AI-generated transcript; names, numbers and wording may be inaccurate.

Speaker IDs are anonymous and local to this call. Section boundaries and timestamps are inferred.

The diarizer reached its eight-speaker limit; distinct voices may share an ID.

Zero-duration alignments: 0. Unassigned words: 221. No alignment has been repaired. Timestamps locate passages in the source recording; decimal positions do not establish word-level precision.

Official issuer source ↗ · Report an issue

Published transcript · Full recording available. Publication updated 2026-11-16T02:52:29.308Z.
Transcript version v1-746364921682ca41ba13 · publication revision 1. Generated by AI; no listener-verified accuracy score is available.

Dotted spans marked ? have an unclear speaker. They remain unattributed even when shown inside a surrounding turn.

Copy or download
ReadableGrouped by speaker and paragraph with timestamps. Stored words unchanged.
As storedOne line per stored segment with its original speaker ID and start time. Exactly the stored words.
Official issuer source ↗Company overview ↗
TRANSCRIPT FEEDBACK

Report a passage

Your report is queued privately for review. It does not change this transcript automatically. Please avoid personal information.