Crown Castle

Q3 2026
Speakers

Oct 21, 2026 · 52 min

PREPARED REMARKS · INFERREDKeys: / search · Space play · ←→ ±10s · [] sections

Prepared remarks

Speaker 0

Unverified voice label

Good day and welcome to the third quarter 2026 Crown Castle Earnings Conference call. All participants will be in a listen-only mode. Should you need assistance, please signal a conference specialist by pressing the star key followed by zero. After today's presentation, there will be an opportunity to ask questions. To ask a question, you may press star then one on your touch tone phone.

And to withdraw your question, please press star then two. Please note this event is being recorded. I would now like to turn the conference over to Mr. Hamilton West, Vice President of Corporate Finance and Treasurer. Please go ahead.

Passages & reports (2)
  • Good day and welcome to the third quarter 2026 Crown Castle Earnings Conference call. All …
  • may press star then one on your touch tone phone. And to withdraw your question, please pr…

Speaker 1

Unverified voice label

Thank you, Chuck, ?and good afternoon, everyone. Thank you for

Passages & reports (3)
  • Thank you, Chuck,
  • and good
  • afternoon, everyone. Thank you for

Speaker unclear

?joining us

Passages & reports (1)
  • joining us

Speaker 0

today as we discuss our third quarter ?2026 results. With me on the call this afternoon are Chris Hillebrandt, Crown

Passages & reports (3)
  • today as we discuss our third quarter
  • 2026
  • results. With me on the call this afternoon are Chris Hillebrandt, Crown

Speaker unclear

?Castle's

Passages & reports (1)
  • Castle's

Speaker 1

President and Chief Executive Officer, ?and Suna Patel, Crown Castle's Chief Finance Officer. ?To aid the discussion, we have posted supplemental materials in the investors section of our website ?at Crown Castle.com that will be referenced throughout the call. This conference call will contain forward-looking statements which are subject to certain risks, uncertainties, and assumptions, and actual results may vary materially from those expected. Information about potential factors which could affect our results is available in the press release and the risk factor sections of the company's SEC filings.

Our statements are made as of today, October 21st, 2026, and we assume no obligation to update any forward-looking statements. In addition, today's call includes discussions of certain non-gap financial measures. Tables reconciling these non-gap financial measures are
available in the supplemental information package in the investor section of the company's website at Crowncastle.com. With that, let me turn the call over to Chris.

Passages & reports (9)
  • President and Chief Executive Officer,
  • and
  • Suna Patel, Crown Castle's Chief Finance Officer.
  • To
  • aid the discussion, we have posted supplemental materials in the investors section of our …
  • at
  • Crown Castle.com that will be referenced throughout the call. This conference call will co…
  • factor sections of the company's SEC filings. Our statements are made as of today, October…
  • available in the supplemental information package in the investor section of the company's…

Speaker unclear

?Thank you, Hamilton,

Passages & reports (1)
  • Thank you, Hamilton,

Speaker 2

Unverified voice label

and good afternoon, everyone. As I reflect on my first year at Crown Castle as CEO, I am pleased with the meaningful progress we have made to sharpen our strategic focus, simplify the business, ?and build a strong foundation for future growth. Over the past year, we have taken several significant steps towards becoming a best in class U.S. tower operator, in addition to completing the sale of our small cell and fiber businesses.

First, at the beginning of the year, we took decisive actions to align our
cost structure with the current business model while preserving our ability to support customers, deliver best in class efficiency, and enable future growth. These actions resulted in $65 million of annualized run rate operating cost savings. Second, ?we launched an enterprise wide transformation program to create a more efficient and scalable operating model that supports our long term growth objectives.

Our transformation program spans the entire business and includes initiatives such as modernizing our systems, optimizing our facilities' footprint, and reducing corporate
non-labor costs. This year we launched a new project management system, improving the application to air process, ?and a new field services system enhancing our asset information and utilization data. We are also on track to exit our transition services agreement related to the previous sale of our fiber and small cell businesses, which we believe will allow us to further simplify our corporate functions.

Passages & reports (9)
  • and good afternoon, everyone. As I reflect on my first year at Crown Castle as CEO, I am p…
  • and
  • build a strong foundation for future growth. Over the past year, we have taken several sig…
  • cost structure with the current business model while preserving our ability to support cus…
  • we
  • launched an enterprise wide transformation program to create a more efficient and scalable…
  • non-labor costs. This year we launched a new project management system, improving the appl…
  • and
  • a new field services system enhancing our asset information and utilization data. We are a…

Third, we continue to scale our ground lease buyout program while meeting or exceeding our target returns. ?In 2026, we expect to purchase more than 400 ground leases, more than double the number completed in 2025.

Passages & reports (3)
  • Third, we continue to scale our ground lease buyout program while meeting or exceeding our…
  • In
  • 2026, we expect to purchase more than 400 ground leases, more than double the number compl…

Speaker unclear

?We

Passages & reports (1)
  • We

Speaker 2

believe acquiring land under our towers improves our margin and increases operational control of our assets, allowing us to deliver more value to the customer by meeting their needs more rapidly.

Passages & reports (1)
  • believe acquiring land under our towers improves our margin and increases operational cont…

Speaker 2

strengthening our customer relationships and driving customer engagement.

Passages & reports (1)
  • strengthening our customer relationships and driving customer engagement.

We resolved a longstanding commercial issue in the quarter with one of our largest customers that advances our strategic relationship and positions us for future growth opportunities. ?We acquired a residual economic interest on a subset of our tower sites and extended the customers' lease terms for those sites.

Passages & reports (3)
  • We resolved a longstanding commercial issue in the quarter with one of our largest custome…
  • We
  • acquired a residual economic interest on a subset of our tower sites and extended the cust…

Speaker unclear

?We

Passages & reports (1)
  • We

Speaker 2

believe this agreement creates value for both parties by simplifying economics, increasing predictability, and limiting long-term churn risk.

Passages & reports (1)
  • believe this agreement creates value for both parties by simplifying economics, increasing…

Speaker unclear

?We

Passages & reports (1)
  • We

Speaker 2

believe this progress positions Crown Castle to capitalize on an increasingly supportive long-term backdrop for wireless communications infrastructure.

Passages & reports (1)
  • believe this progress positions Crown Castle to capitalize on an increasingly supportive l…

Mobile data demand, one of the clearest indicators of demand for our infrastructure, continues to grow at a healthy pace and is showing no signs of stopping with the emergence of AI-enabled applications, physical AI, and the acceleration of data-only wireless devices.

Passages & reports (1)
  • Mobile data demand, one of the clearest indicators of demand for our infrastructure, conti…

Speaker 2

We are also seeing continued investment in spectrum by our customers and others in the wireless industry. Over the past year, carriers and other wireless operators have committed significant capital to acquire spectrum assets, including ATT's acquisition of 3.45 gigahertz ?and 600 megahertz spectrum, Verizon's acquisition of AWS III licenses, and SpaceX's acquisition of AWS 4, H block, ?and 800 MHz Spectrum. These transactions demonstrate the commitments of the wireless industry to aggressively invest and to secure spectrum resources needed to support future terrestrial wireless network growth.

Notably, as part of its 800 megahertz spectrum acquisition, SpaceX
said it aims to, quote, become the first network operator to deploy both satellite and terrestrial spectrum.

Passages & reports (6)
  • We are also seeing continued investment in spectrum by our customers and others in the wir…
  • and
  • 600 megahertz spectrum, Verizon's acquisition of AWS III licenses, and SpaceX's acquisitio…
  • and
  • 800 MHz Spectrum. These transactions demonstrate the commitments of the wireless industry …
  • said it aims to, quote, become the first network operator to deploy both satellite and ter…

Speaker unclear

?We

Passages & reports (1)
  • We

Speaker 2

believe SpaceX's mobile network ambitions could provide an additional catalyst in two ways. First, to invest directly by leasing towers to build their previously announced terrestrial network. And second, as a catalyst for network operators to achieve investment in their mobile networks to enhance performance and coverage against new entrants in the wireless marketplace.

Passages & reports (2)
  • believe SpaceX's mobile network ambitions could provide an additional catalyst in two ways…
  • and coverage against new entrants in the wireless marketplace.

Looking ahead, we expect the FCC to auction approximately 800 megahertz of spectrum, consistent with Chairman Carr's efforts to advance spectrum policy and maintain U.S. leadership in telecommunications. This includes approximately 160 megahertz of upper C band spectrum expected to be auctioned by July 2027.

Passages & reports (2)
  • Looking ahead, we expect the FCC to auction approximately 800 megahertz of spectrum, consi…
  • 2027.

new spectrum deployment has been an important driver of network investment, and we believe the industry's spectrum pipeline remains supportive of long-term infrastructure demand.

Passages & reports (1)
  • new spectrum deployment has been an important driver of network investment, and we believe…

We continue to see momentum in edge compute infrastructure as demand for storage and compute continues to accelerate, while many large data center deployments face multi-year construction and power delivery delays. Crown Castle now has a hundred-plus edge sites deployed in several concurrent trials underway. While initial results appear promising, we continue to evaluate whether these edge solutions will scale. Crown Castle is positioned well to serve this demand in a capital-efficient manner through its nationwide network of tower sites, each with existing power and broadband connectivity, ?and can provide select distributed move-in-ready locations.

Passages & reports (5)
  • We continue to see momentum in edge compute infrastructure as demand for storage and compu…
  • trials underway. While initial results appear promising, we continue to evaluate whether t…
  • connectivity,
  • and
  • can provide select distributed move-in-ready locations.

Speaker 2

teammates continue to play a critical role in our progress transforming the business, and we are seeing rising levels of engagement with our clear and focused strategy. We are committed to investing in their continued development through additional training, individual development plans, and training in the cost effective use of AI.

Passages & reports (1)
  • teammates continue to play a critical role in our progress transforming the business, and …

In conclusion, over the past year we have taken decisive steps to simplify the business, strengthen our operating model, and build the right leadership team. This progress allowed us to increase our full year 2026 guidance and positions us to capitalize on the sector tailwinds and opportunities. We believe our Pure Play US Tower strategy, investment grade balance sheet, and capital allocation framework positions Crown Castle to maximize long-term shareholder value.

With that, I'll turn it over to Sunit to walk us through the details of the quarter.

Passages & reports (2)
  • In conclusion, over the past year we have taken decisive steps to simplify the business, s…
  • We believe our Pure Play US Tower strategy, investment grade balance sheet, and capital al…

Speaker unclear

?Thank you,

Passages & reports (1)
  • Thank you,

Speaker 3

Unverified voice label

Chris, and good afternoon, everyone. We continue to execute on our strategy towards becoming a best in class U.S. tower operator in the third quarter, positioning us to increase our full year 2026 guidance. Starting on page three, third quarter organic growth, excluding the impact of sprint cancellations and dish terminations, was 3.5% or $35 million. Third quarter organic growth increases to 3.8% if dish revenues are excluded from prior year site rental billings. ?

This
growth was more than offset at site rental revenues by five million of sprint cancellations, sixty one million of disterminations, and a seventeen million decrease in non cash straight line revenues and amortization of prepaid rent. Third quarter services margin was fifteen million, which we expect to increase in the fourth quarter. Turning to page four, we are increasing our full year 2026 outlook by 20 million for site rental revenues, 25 million for adjusted EBITDA, and 5 million for AFFO.

To reflect first, a 20
million increase in straight line revenues related to contractual term extensions as a result of the agreement Chris highlighted earlier, and second, a five million decrease in site rental cost of operations as we continue to drive efficiencies and increase our ground lease buyout activity.

Passages & reports (6)
  • Chris, and good afternoon, everyone. We continue to execute on our strategy towards becomi…
  • cancellations and dish terminations, was 3.5% or $35 million. Third quarter organic growth…
  • This
  • growth was more than offset at site rental revenues by five million of sprint cancellation…
  • expect to increase in the fourth quarter. Turning to page four, we are increasing our full…
  • million increase in straight line revenues related to contractual term extensions as a res…

Excluding the impacts of the transaction, full year 2026 adjusted EBITDA and AFFO are each increasing $5 million. ?I would like to take a moment to further highlight our progress on driving cost savings. Since issuing our original full year 2026 guidance in February, if you set aside the increases to our revenue and the decrease from our services contribution, we have increased full year 2026 adjusted EBITDA by 20 million from run rate cost savings or approximately 50 basis points as a percent of our site rental revenues.

On top of this improvements, we still expect to expand margins by more than 200 basis points by 2030 relative to
2026. Turning to page five, full year 2026 six organic growth, excluding the impact of sprint cancellations and dish terminations remains unchanged at one hundred and thirty five million or three point four percent of the midpoint. Full year twenty twenty-six organic growth increases to three point six percent of the midpoint if dish revenues are excluded from prior year site rental billings.

We continue to expect twenty twenty-six to mark the low point for organic growth. Our full year 2026 organic growth outlook includes
60 to 70 million in core leasing activity, and based on our current view of the leasing pipeline, we expect to finish the year towards the bottom end of the range. Now I'd like to provide additional detail on the customer agreement we completed in the third quarter.

We paid $275 million to acquire
a residual economic interest in a subset of towers originally acquired many years ago, extend the customer's lease term for those sites and limit long-term churn across this portion of our portfolio. By acquiring this residual economic interest, we expect to increase site rental billings by nearly four million in the fourth quarter or sixteen million on an annualized basis, and decrease amortization of prepaid rent by two million or eight million on an annualized basis.

We're not changing our full year 2026 guidance ranges for site
rental billings, amortization of prepaid rent, and interest expense, as these fourth quarter impacts are captured within the existing ranges. On an annualized basis, we expect the impact of the transaction to be approximately $4 million accretive to AFFO, excluding the impact of prepaid rent amortization. We expect the term extension will result in an additional 20 million of straight line revenues in the fourth quarter.

Turning to the balance sheet, we ended the quarter with 97% fixed rate debt with a weighted average maturity of seven years
and leverage at 6.5 times ?net debt to last quarter annualized adjusted EBITDA. Net debt to last quarter annualized adjusted EBITDA decreases to 6.3 times when including the impact from the incremental straight line revenues related to the term extensions commencing in the fourth quarter.

Lastly, we're increasing our outlook for
discretionary capex by 40 million to 240 million to reflect the higher volume of ground lease buyouts we expect to complete in 2026. Discretionary CapEx, net of anticipated prepaid rent additions of 40 million at the midpoint, is expected to be 200 million at the midpoint. To wrap up, the actions we've taken this year to improve efficiency and strengthen the business support our increased 2026 full-year guidance.

We also remain on track to deliver $2.1 billion of AFFO at the midpoint across the second half of 2026 and
first half of 2027. We believe our investment grade balance sheet, disciplined capital allocation framework, and focus on becoming a best-in-class U.S. tower operator positions us well to generate attractive term shareholder returns. With that, I'd like to open the line for questions.

Passages & reports (17)
  • Excluding the impacts of the transaction, full year 2026 adjusted EBITDA and AFFO are each…
  • I
  • would like to take a moment to further highlight our progress on driving cost savings. Sin…
  • adjusted EBITDA by 20 million from run rate cost savings or approximately 50 basis points …
  • 2026. Turning to page five, full year 2026 six organic growth, excluding the impact of spr…
  • growth increases to three point six percent of the midpoint if dish revenues are excluded …
  • 60 to 70 million in core leasing activity, and based on our current view of the leasing pi…
  • a residual economic interest in a subset of towers originally acquired many years ago, ext…
  • rental billings by nearly four million in the fourth quarter or sixteen million on an annu…
  • rental billings, amortization of prepaid rent, and interest expense, as these fourth quart…
  • impact of prepaid rent amortization. We expect the term extension will result in an additi…
  • and leverage at 6.5 times
  • net
  • debt to last quarter annualized adjusted EBITDA. Net debt to last quarter annualized adjus…
  • discretionary capex by 40 million to 240 million to reflect the higher volume of ground le…
  • the midpoint. To wrap up, the actions we've taken this year to improve efficiency and stre…
  • first half of 2027. We believe our investment grade balance sheet, disciplined capital all…

Speaker 0

Thank you. We will now begin the question and answer session. To ask a question, you may press star than one on your touch tone phone. If you are using a speaker phone, please pick up your handset before pressing the keys. If at any time your question has been addressed and you would like to withdraw your question, please press star, then two. And our first question for today will come from Rick Prentice with Raymond James.

Please go ahead.

Passages & reports (2)
  • Thank you. We will now begin the question and answer session. To ask a question, you may p…
  • to withdraw your question, please press star, then two. And our first question for today w…

Questions & answers

Speaker unclear

?Yeah, thanks

Passages & reports (1)
  • Yeah, thanks

Speaker 4

Unverified voice label

everybody. Good afternoon.

Passages & reports (1)
  • everybody. Good afternoon.

Speaker 2

Hey, Rick.

Passages & reports (1)
  • Hey, Rick.

Speaker unclear

?Hey,

Passages & reports (1)
  • Hey,

Speaker 4

um, ?a couple questions. Um, first, as you know, we always say follow the spectrum, really, not the CapEx. Um, and so one of the most interesting things, obviously, you touched on it a little bit in the last couple of weeks, was um brain selling spectrum to SpaceX, the 800 megahertz spectrum. So, a couple questions in regards to that. We've heard some to maybe all of the towers out there that Dish rented might already include radios and antennas or some equipment ?for the 800 megahertz frequency that SpaceX is buying.

Can can you help us understand is that is that something you understand that might actually already be on your towers?

Passages & reports (6)
  • um,
  • a
  • couple questions. Um, first, as you know, we always say follow the spectrum, really, not t…
  • in regards to that. We've heard some to maybe all of the towers out there that Dish rented…
  • for
  • the 800 megahertz frequency that SpaceX is buying. Can can you help us understand is that …

Speaker 2

Rick, the answer is there is some equipment that is on the sites. What specifically the radio types and bands are, I couldn't tell you off the top of my head, but that is correct that the equipment is up there from when Dish abandoned

Passages & reports (1)
  • Rick, the answer is there is some equipment that is on the sites. What specifically the ra…

Speaker unclear

?it.

Passages & reports (1)
  • it.

Speaker 4

Yeah. Okay. And obviously it's also the old Nextel stuff. So our understanding is also it's still in the handsets for a lot of handsets that are out there. So that's also good to have. But are you is it still like to you that that is in the chipsets in a lot of the devices?

Passages & reports (2)
  • Yeah. Okay. And obviously it's also the old Nextel stuff. So our understanding is also it'…
  • devices?

Speaker 2

The the 800 megahertz spectrum. Um again, I I couldn't I couldn't comment specifically on what the carriers have out there. ?Sure. But obviously, I think more importantly, is as you and I both know, 800 megahertz does solve one of the critical challenges for an eventual SpaceX deployment, which is you need low band to get into buildings. You need low band to be able to provide breadth of coverage.

And so it's obviously a huge
milestone in their acquisition of that spectrum.

Passages & reports (4)
  • The the 800 megahertz spectrum. Um again, I I couldn't I couldn't comment specifically on …
  • Sure.
  • But obviously, I think more importantly, is as you and I both know, 800 megahertz does sol…
  • milestone in their acquisition of that spectrum.

Speaker 4

Makes sense.

Passages & reports (1)
  • Makes sense.

Speaker 4

Obviously, with the escrow set up at the FCC with Echo Star selling spectrum to ATT. Can you update us as far as we've been hearing some chatter when we were in DC for the Wireless History Foundation a couple weeks ago that it the tower industry might be getting closer to figuring ?out who's going to get how much out of the escrow and maybe an update on what are you hearing from MLAs with satellite companies?

Any progress?

Passages & reports (3)
  • Obviously, with the escrow set up at the FCC with Echo Star selling spectrum to ATT. Can y…
  • out
  • who's going to get how much out of the escrow and maybe an update on what are you hearing …

Speaker 2

Okay. Well, let's handle the dish one first. So here's a quick update. So the current proceedings in the bankruptcy court have been placed on pause while the parties attempt to negotiate a settlement in a court ordered mediation. There's no specific update to report on the progress of that yet, but as we communicated, I think on prior earnings calls, the fact that this has now moved into a bankruptcy process will likely result in an accelerated timeline comparative to a traditional uh court court proceeding.

So that's uh I think that's a good news story, and the parties will remain in this mediation through early November. Um and
then sorry, your your second question was just around uh

Passages & reports (3)
  • Okay. Well, let's handle the dish one first. So here's a quick update. So the current proc…
  • I think on prior earnings calls, the fact that this has now moved into a bankruptcy proces…
  • then sorry, your your second question was just around uh

Speaker 4

update on any MLA and uh progress from selling companies, whether it's SpaceX, Amazon, or anyone else. Just how are we doing there?

Passages & reports (1)
  • update on any MLA and uh progress from selling companies, whether it's SpaceX, Amazon, or …

Speaker 2

Yeah, so let I I I don't think I want to get into a customer specific detail, but you can assume that we're talking to all parties.

Passages & reports (1)
  • Yeah, so let I I I don't think I want to get into a customer specific detail, but you can …

Speaker 4

Okay. And last one for me, a lot of all these interrelated questions. The equipment that was abandoned by Dish on the Towers, who would if somebody wanted to buy that for pennies on the dollar or or or take ownership of that, what's the process? Would they come to you guys and different tower companies? Do they need to go to the bankruptcy court?

Do they need to go to Dish? Like if somebody wanted to say, hey, there's some equipment up there that's interesting to me, what's that process look like?

Passages & reports (2)
  • Okay. And last one for me, a lot of all these interrelated questions. The equipment that w…
  • companies? Do they need to go to the bankruptcy court? Do they need to go to Dish? Like if…

Speaker 2

Yeah, I I I I think it's it's probably uh a question best left to the lawyers in terms of what that is. I mean, from our perspective, ?Dish is abandoned equipment. They walked away from it. We've given them every opportunity ?to reclaim that equipment and take it off our towers, which they have elected not to do and have effectively abandoned

Passages & reports (5)
  • Yeah, I I I I think it's it's probably uh a question best left to the lawyers in terms of …
  • Dish
  • is abandoned equipment. They walked away from it. We've given them every opportunity
  • to
  • reclaim that equipment and take it off our towers, which they have elected not to do and h…

Speaker unclear

?it.

Passages & reports (1)
  • it.

Speaker 2

But in terms of how that would work contractually, I think that would be something I'd have to refer out to the lawyers.

Passages & reports (1)
  • But in terms of how that would work contractually, I think that would be something I'd hav…

Speaker unclear

?Yeah,

Passages & reports (1)
  • Yeah,

Speaker 4

I guess Shakespeare wasn't right about first thing we do about the lawyers. But anyway, okay. Thanks, everybody.

Passages & reports (1)
  • I guess Shakespeare wasn't right about first thing we do about the lawyers. But anyway, ok…

Speaker 2

We we love our lawyers, Rick.

Passages & reports (1)
  • We we love our lawyers, Rick.

Thank you for the questions.

Passages & reports (1)
  • Thank you for the questions.

Speaker 0

The next question will come from uh Brendan Lynch with Barclays. Please go ahead.

Passages & reports (1)
  • The next question will come from uh Brendan Lynch with Barclays. Please go ahead.

Speaker unclear

?Great.

Passages & reports (1)
  • Great.

Speaker 5

Unverified voice label

Thanks for taking my questions. Available infrastructure is a company that has identified you as their vendor for deploying edge data centers. Can you elaborate on what you see as the potential growth for this relationship?

Passages & reports (1)
  • Thanks for taking my questions. Available infrastructure is a company that has identified …

Speaker unclear

?Yeah,

Passages & reports (1)
  • Yeah,

Speaker 2

let me start by saying we're excited to partner with Available Infrastructure. As you know, they are building a nationwide network of edge neo-cloud data centers. And while edge data centers are not new to CCI, we look at this as an exciting niche space. And we look forward to seeing how it evolves over time. More broadly, I guess an update on we've had this trial now for a number of months.

As you heard me announce earlier, we've now eclipsed 100 sites deployed. Part of what we're looking at is to learn from these trials and understand both the demand profile from
potential customers, but also just gaining an inventory of what we actually have and what we can actually market to our customers. And as we've gone through this process, we've identified, ?you know, we have something like 5,000 existing structures or shelters that are already existing ?that are out at our sites today in various levels of condition, ?but in many cases able to take customers to move ?in right away.

We've been researching power, and I think you've heard us talk about before. The sweet spot for
?us is between, say, a 0.2 to a 0.5 megawatt installation, utilizing the existing power on sites for customers to be able to utilize ?it. Some customers have come back to us and have asked and inquired whether we would be able to bring additional power out to the sites. ?

And
just as a sampling, what we found across like 25 sites that we just recently completed. What we found out was across those 25 sites, there would be an opportunity to bring up to 100 megawatts in aggregate across those 25 And this is power that could be delivered in approximately nine to eleven months with very limited capital required from Crown. So I think from an optionality perspective, it opens up the possibility of providing even greater service to our customers.

But again, until we've finalized on how we can scale this
profitably, I would still characterize this as a trial phase where we're still learning a lot. And this is this update I'm providing with you now is is indicative of what we're learning along the way and how this might emerge as a as a business opportunity over

Passages & reports (19)
  • let me start by saying we're excited to partner with Available Infrastructure. As you know…
  • time. More broadly, I guess an update on we've had this trial now for a number of months. …
  • potential customers, but also just gaining an inventory of what we actually have and what …
  • you
  • know, we have something like 5,000 existing structures or shelters that are already existi…
  • that
  • are out at our sites today in various levels of condition,
  • but
  • in many cases able to take customers to move
  • in
  • right away. We've been researching power, and I think you've heard us talk about before. T…
  • us
  • is between, say, a 0.2 to a 0.5 megawatt installation, utilizing the existing power on sit…
  • it.
  • Some customers have come back to us and have asked and inquired whether we would be able t…
  • And
  • just as a sampling, what we found across like 25 sites that we just recently completed. Wh…
  • approximately nine to eleven months with very limited capital required from Crown. So I th…
  • profitably, I would still characterize this as a trial phase where we're still learning a …

Speaker unclear

?time.

Passages & reports (1)
  • time.

Speaker 5

Great. That's uh helpful caller. Um you've also suggested that you've hit an inflection point on organic growth. When we think about the cadence into 2027, can you break down where you anticipate an acceleration or deceleration between the components of core leasing, the escalator as sprint turn fades and normal course churn?

Passages & reports (1)
  • Great. That's uh helpful caller. Um you've also suggested that you've hit an inflection po…

Speaker unclear

?Yeah,

Passages & reports (1)
  • Yeah,

Speaker 2

I I let me just start by saying, you know, we we reiterate that we believe 2026 is the low point for organic growth uh in in our business and across the industry. The reasons why we believe that are the following. One is ?the MLAs that we have in place that gives us visibility to that future contracted activity. Um we announced in this uh past quarter we resolved this long standing customer issue, which both strengthens our relationship and clears a path for future growth opportunities with the customer.

The recent spectrum
transactions, albeit somewhat delayed in the ATT acquisition of 600 megahertz, Verizon's acquisition of AWS 3, and now SpaceX with the 800 megahertz. These are all positive catalysts for towers. And then longer term, we've talked about the opportunity of 6G and the fact that the FCC and administration has made it a priority to earmark 800 megahertz of spectrum, and more importantly, stating 6G is a battle to be won and is a kind of matter of life and death for the country to win that battle versus others.

Um, and starting that spectrum uh acceleration auction in July 2027.
?Um and then the edge infrastructure ecosystem that is now starting to emerge. ?Uh, combined with the underlying factor that mobile data demand continues to grow and is even expected to double over the next five years, and the powering of AI inference that's driving a much higher percentage uplink traffic. All of these are activities of why we believe that 2026 ?is a low watermark for growth.

But obviously that has to be borne out into 27 and beyond. But these are these are positive tailwinds for the industry and for Crown as we look towards our future growth. Without me speaking specifically towards our 27 guidance, which I'm I'm not prepared to share today.

Passages & reports (11)
  • I I let me just start by saying, you know, we we reiterate that we believe 2026 is the low…
  • the
  • MLAs that we have in place that gives us visibility to that future contracted activity. Um…
  • transactions, albeit somewhat delayed in the ATT acquisition of 600 megahertz, Verizon's a…
  • administration has made it a priority to earmark 800 megahertz of spectrum, and more impor…
  • Um
  • and then the edge infrastructure ecosystem that is now starting to emerge.
  • Uh,
  • combined with the underlying factor that mobile data demand continues to grow and is even …
  • is
  • a low watermark for growth. But obviously that has to be borne out into 27 and beyond. But…

Speaker 3

Yeah, and keep in mind now we've had some of the satellite players also declare the interest in a terrestrial network, so I think that's a positive also.

Passages & reports (1)
  • Yeah, and keep in mind now we've had some of the satellite players also declare the intere…

Speaker 5

Great. Thank you very much for the code.

Passages & reports (1)
  • Great. Thank you very much for the code.

Speaker unclear

?Thank

Passages & reports (1)
  • Thank

Speaker 2

you, Brennan.

Passages & reports (1)
  • you, Brennan.

Speaker 0

The next question will come from Michael Fonk with Bank of America. Please go ahead.

Passages & reports (1)
  • The next question will come from Michael Fonk with Bank of America. Please go ahead.

Speaker 5

Yeah, great guys. Thank you for the questions this evening. So, first on going back to the

Passages & reports (1)
  • Yeah, great guys. Thank you for the questions this evening. So, first on going back to the

Speaker 6

Unverified voice label

800 megahertz

Passages & reports (1)
  • 800 megahertz

Speaker 5

and uh and SpaceX

Passages & reports (1)
  • and uh and SpaceX

Speaker 6

comments, just if if they wanted to deploy that nationwide, you know, can you give us an approximation for ?you know number of tower sites for a minimum level of service with 800? ?And then you know your thoughts on the timing um the timing of a build of of that scale, given any kind of labor constraints, equipment purchasing, ?just maybe think about the framing for timing and sort of contribution ?to Crown Castle if they do deploy the 800.

I have one more follow-up.

Passages & reports (9)
  • comments, just if if they wanted to deploy that nationwide, you know, can you give us an a…
  • you know
  • number of tower sites for a minimum level of service with 800?
  • And
  • then you know your thoughts on the timing um the timing of a build of of that scale, given…
  • just
  • maybe think about the framing for timing and sort of contribution
  • to
  • Crown Castle if they do deploy the 800. I have one more follow-up.

Speaker 2

Yeah, Michael, I think it's it's a it's a tough question to answer because it really depends on the strategy in which SpaceX decides to go to market. If part of their goal is to move as quickly as possible across a terrestrial network, that would lead them towards maximizing the number of co-locations on existing towers and rooftops that exist today. And they'd have to accept the heights of what's available in the RAD centers.

If, on the other hand, they decided to go alone and to build thousands and millions and billions of microcells, it might take quite a bit longer based on the scale of not only
identifying the land available, but also the the time, cost, and effort of bringing back halt to every site and power to every site. So that that's a that's a very good question.

It really depends on what SpaceX decides to do in their network design. I think what we would offer to them is
the fact that we've got, ?you know, forty th approximately forty thousand sites. In many cases, we do have uh prior installations that have already been through the zoning and permitting process so that it could help them along with others in the industry of getting to market faster ?and getting that eight hundred megahertz deployed.

Passages & reports (8)
  • Yeah, Michael, I think it's it's a it's a tough question to answer because it really depen…
  • existing towers and rooftops that exist today. And they'd have to accept the heights of wh…
  • identifying the land available, but also the the time, cost, and effort of bringing back h…
  • the fact that we've got,
  • you know,
  • forty th approximately forty thousand sites. In many cases, we do have uh prior installati…
  • and
  • getting that eight hundred megahertz deployed.

Speaker unclear

?I

Passages & reports (1)
  • I

Speaker 3

mean one one indication it it took dish like four years uh and as Chris pointed out some of some of that is already up so it'd probably be in a if they wanted to depending on the ambitions you could do it on a much more compressed timeline uh depending on ?how many sites they want to get to but they can move quickly ?if they want to so

Passages & reports (5)
  • mean one one indication it it took dish like four years uh and as Chris pointed out some o…
  • how
  • many sites they want to get to but they can move quickly
  • if they want
  • to so

Speaker 6

say a say a 2029 timeline uh ballpark it for wireless service um you know utilizing disk sites is obviously easiest line of sight to get there versus doing the uh the micro cell strategy.

Passages & reports (1)
  • say a say a 2029 timeline uh ballpark it for wireless service um you know utilizing disk s…

Speaker 2

This is the industry cheat code that exists in that Dish just built this network. I know the people that built that network, uh, many of which were former colleagues at T-Mobile. They're very good, smart deployment people. They move very, very fast. Companies like Crown leaned in uh very very aggressively to help them and staffed up in the services side to actually help enable ?that.

So that does represent a a huge time to market advantage if they go down that route. But in the end, it's going to depend on what route. Is speed of essence or is some other model more appropriate for them?
?I think you'll have to wait to hear from them. But I think on our side, we stand ready and available and obviously as one of the lead providers of tower space to dish, obviously have the scale to really help accelerate

Passages & reports (6)
  • This is the industry cheat code that exists in that Dish just built this network. I know t…
  • and staffed up in the services side to actually help enable
  • that.
  • So that does represent a a huge time to market advantage if they go down that route. But i…
  • I
  • think you'll have to wait to hear from them. But I think on our side, we stand ready and a…

Speaker unclear

?that.

Passages & reports (1)
  • that.

Speaker 6

Great, thank you. One more code. How are you thinking about the 600 megahertz contributing to to leasing activity and timing, whether that's going to be ?a you know four or five year normal maintenance activity from ATT, or if you expect that will be um you know new equipment shorter duration for um for deployment?

Passages & reports (3)
  • Great, thank you. One more code. How are you thinking about the 600 megahertz contributing…
  • a you
  • know four or five year normal maintenance activity from ATT, or if you expect that will be…

Speaker 2

Um you know I I think if if I'm being honest here, I think it's it's first the approval of six hundred megahertz of the transaction obviously took additional time as they went through ?the FCC approval process. And now I think the customer is very much in the throes of doing the design engineering and selection of their OEM vendor, which would provide the equipment for them to put ?up.

And so it's probably been a little bit slower of a rollout than we anticipated. That said, 600 megahertz is the equivalent of beachfront property, is the way that I describe this. Its propagation is such that it helps to drive in building coverage in urban and suburban areas. It extends coverage in the rural
areas. ?Uh and the customer just paid $23 billion for the spectrum.

It's highly valuable. I would think that they would look to deploy this as quickly as possible given the value in the overall spectrum portfolio
?of what they've just acquired. And again, with the handset manufacturers having already built these frequencies in for other customers, it's something that they can they can actually put to good use very, very quickly.

Passages & reports (10)
  • Um you know I I think if if I'm being honest here, I think it's it's first the approval of…
  • the
  • FCC approval process. And now I think the customer is very much in the throes of doing the…
  • up.
  • And so it's probably been a little bit slower of a rollout than we anticipated. That said,…
  • areas.
  • Uh
  • and the customer just paid $23 billion for the spectrum. It's highly valuable. I would thi…
  • of
  • what they've just acquired. And again, with the handset manufacturers having already built…

Speaker 6

Great. I appreciate the time. Thank you guys.

Passages & reports (1)
  • Great. I appreciate the time. Thank you guys.

Speaker unclear

?The

Passages & reports (1)
  • The

Speaker 0

next question will come from Nick Del Dio with Moffitt Nathansen. Please go ahead.

Passages & reports (1)
  • next question will come from Nick Del Dio with Moffitt Nathansen. Please go ahead.

Speaker unclear

?Hey,

Passages & reports (1)
  • Hey,

Speaker 0

thanks for taking

Passages & reports (1)
  • thanks for taking

Speaker 4

my questions. Um ?first, Chris, you noted that you're supporting

Passages & reports (3)
  • my questions. Um
  • first,
  • Chris, you noted that you're supporting

Speaker unclear

?over a hundred

Passages & reports (1)
  • over a hundred

Speaker 7

Unverified voice label

edge sites. What would that number have been, you know, a quarter or two or three ago? And what portion of that hundred are supporting GPU deployments versus other use cases?

Passages & reports (1)
  • edge sites. What would that number have been, you know, a quarter or two or three ago? And…

Speaker 2

Yeah, I let ?me start with the

Passages & reports (3)
  • Yeah, I let
  • me
  • start with the

Speaker 1

second part. I I can't ?tell you exactly what

Passages & reports (3)
  • second part. I I can't
  • tell you
  • exactly what

Speaker 2

what is in those uh that these have been build that have um continued to accelerate through the course of the year.

Passages & reports (1)
  • what is in those uh that these have been build that have um continued to accelerate throug…

Speaker unclear

?It's starting at the

Passages & reports (1)
  • It's starting at the

Speaker 1

beginning of the year, I think

Passages & reports (1)
  • beginning of the year, I think

Speaker unclear

?we're effectively at zero or very few sites. So we've been able to build that number in that period of time. Um

Passages & reports (1)
  • we're effectively at zero or very few sites. So we've been able to build that number in th…

Speaker 2

again, the key ?key learnings for us has been understanding what the requirements are of edge data customers that is different than our traditional tower customers, and making sure that we're able to provide them with that timely basis uh information uh to help them accelerate their deployment. Um ?and so it's been a pretty much a steady build. I think it peaked uh really peaked into three third quarter.

It's built up steam.

Passages & reports (5)
  • again, the key
  • key learnings for us
  • has been understanding what the requirements are of edge data customers that is different …
  • and
  • so it's been a pretty much a steady build. I think it peaked uh really peaked into three t…

Speaker unclear

?And

Passages & reports (1)
  • And

Speaker 2

again,

Passages & reports (1)
  • again,

Speaker 1

the the the key for us is is this something that's scalable so that we're not just talking like a hundred

Passages & reports (1)
  • the the the key for us is is this something that's scalable so that we're not just talking…

Speaker 2

sites but that we're talking hundreds or even thousands of sites over time is when it really starts to make sense for us as a as a new line of business.

Passages & reports (1)
  • sites but that we're talking hundreds or even thousands of sites over time is when it real…

Speaker unclear

?Yeah

Passages & reports (1)
  • Yeah

Speaker 3

Nick Garret is still uh small in the scheme of our overall revenues, but it's a good sign and I would say ?you know compared to the beginning of the year we are talking to more players and I think just doing some more research on our sites and power availability and supply lines, as Chris was saying, we can uh it looks like on you know certain subsets of sites we can provide a bigger power footprint, which I think gets more ?in the sweet spot of what edge uh ?pro you know needs are.

But but again it's still early days and we'll have more to talk about this in subsequent quarters.

Passages & reports (8)
  • Nick Garret is still uh small in the scheme of our overall revenues, but it's a good sign …
  • you
  • know compared to the beginning of the year we are talking to more players and I think just…
  • which I think gets more
  • in
  • the sweet spot of what edge uh
  • pro
  • you know needs are. But but again it's still early days and we'll have more to talk about …

Speaker 7

Okay. Okay. That's good to hear. Thank you. ?And then maybe one on the leasing outlook. You noted it's going to come in at the low end of the expected range. ?You know, probably a little bit of a change from prior comments that leasing would be back end loaded.

Passages & reports (5)
  • Okay. Okay. That's good to hear. Thank you.
  • And
  • then maybe one on the leasing outlook. You noted it's going to come in at the low end of t…
  • You know,
  • probably a little bit of a change from prior comments that leasing would be back end loade…

Speaker unclear

?So

Passages & reports (1)
  • So

Speaker 7

is is that driven by leasing getting pushed into 2027 for some reason? ?Or are you seeing a shift in the underlying trajectory or is something else going on? Anything in each other would be

Passages & reports (3)
  • is is that driven by leasing getting pushed into 2027 for some reason?
  • Or
  • are you seeing a shift in the underlying trajectory or is something else going on? Anythin…

Speaker unclear

?great.

Passages & reports (1)
  • great.

Speaker 2

mobile network operator customers and these edge data center operators. ?Uh in order to finish the year above the low end of the range that we got into, we would have to see these opportunities materialize earlier than we currently anticipate. So it is it's more of a timing issue.

Passages & reports (3)
  • mobile network operator customers and these edge data center operators.
  • Uh
  • in order to finish the year above the low end of the range that we got into, we would have…

Speaker 3

Yeah, it's it's more a shift. I I would say the excitement around what people want to do is uh probably built up but uh but it's a timing shift as opposed to a trajectory shift.

Passages & reports (1)
  • Yeah, it's it's more a shift. I I would say the excitement around what people want to do i…

Speaker 7

Okay. Thank you

Passages & reports (1)
  • Okay. Thank you

Speaker unclear

?both

Passages & reports (1)
  • both

Speaker 0

the question will come from Cameron McVeigh with Morgan Stanley. Please go ahead.

Passages & reports (1)
  • the question will come from Cameron McVeigh with Morgan Stanley. Please go ahead.

Speaker 5

Hi, thank ?you. So Elon yesterday said that he expects AI agents to drive in orders of magnitude growth and bandwidth demand. And I'm curious as we think of the extent that AI AI agents are driving higher uplink traffic. How much can the carriers accommodate with their existing equipment and potential software upgrades? And then to that point, have you had conversations with customers looking to upgrade equipment related to higher uplink traffic so far?

Thanks.

Passages & reports (4)
  • Hi, thank
  • you.
  • So Elon yesterday said that he expects AI agents to drive in orders of magnitude growth an…
  • potential software upgrades? And then to that point, have you had conversations with custo…

Speaker unclear

?May

Passages & reports (1)
  • May

Speaker 6

maybe

Passages & reports (1)
  • maybe

Speaker 2

put this in context and share at a recent analyst conference where we sat with the three CTOs of the operators, and what they described was

Passages & reports (1)
  • put this in context and share at a recent analyst conference where we sat with the three C…

Speaker 1

a very

Passages & reports (1)
  • a very

Speaker 2

interesting and exciting future around AI and the impacts on the carrier networks. Predominantly that it would take the current network profile of where, say, 90% of the total mobile traffic data load is on the downlink and only 10% is on the uplink, that longer term that would move closer to a 50 50 between the downlink and the uplink, meaning that you have people in the field ingesting data through video, through uh voice, through a text, whereby they would be ingesting that data and uploading it in order to gain real time information.

And the implications of that are
twofold. One of which is, to your point, there's some re architecting of the network, both in terms of capacity and then the configuration of how to balance that traffic load up and down. Two is it starts to talk to latency, and then does that become a

Passages & reports (3)
  • interesting and exciting future around AI and the impacts on the carrier networks. Predomi…
  • closer to a 50 50 between the downlink and the uplink, meaning that you have people in the…
  • twofold. One of which is, to your point, there's some re architecting of the network, both…

Speaker 1

bigger issue? And as you think about the

Passages & reports (1)
  • bigger issue? And as you think about the

Speaker 2

edge of data compute, is something where over time, as those applications evolve, that the need to have very fast uh response times lends itself towards the potential for future growth in the edge data centers. So those are those are the two implications that we've heard directly from customers in terms of the difference in the customer profile. The the broader context of the data growth, again, the latest data that I saw published was a doubling of total data payload over the next five years.

This was the this was the Kegger that was implied.

Passages & reports (2)
  • edge of data compute, is something where over time, as those applications evolve, that the…
  • in the customer profile. The the broader context of the data growth, again, the latest dat…

Speaker 3

Yeah I think it's going to be a big growth driver as you were pointing out. I think it also means that the you know fiber infrastructure into towers I think you also talked about the implications for uh for a need for a lot more edge compute and storage. Uh so you know these all these are all things that should be good drivers for our business.

And to your point, uh it it is I don't think it's just a software upgrade. If you just have raw growth in bits and it takes power to move bits, uh it might need you know upgrade of inf equipment too
over

Passages & reports (3)
  • Yeah I think it's going to be a big growth driver as you were pointing out. I think it als…
  • all these are all things that should be good drivers for our business. And to your point, …
  • over

Speaker unclear

?time.

Passages & reports (1)
  • time.

Speaker 5

Thanks.

Passages & reports (1)
  • Thanks.

Speaker 1

Thank you.

Passages & reports (1)
  • Thank you.

Speaker unclear

?The

Passages & reports (1)
  • The

Speaker 0

next question will come from Michael Rollins with the City. Please go ahead.

Passages & reports (1)
  • next question will come from Michael Rollins with the City. Please go ahead.

Speaker 4

Thanks and good afternoon. Two different topics, if I could. So first, going back to

Passages & reports (1)
  • Thanks and good afternoon. Two different topics, if I could. So first, going back to

Speaker unclear

?the

Passages & reports (1)
  • the

Speaker 7

customer dispute, can you provide just a little bit more background? You said it was longstanding. What ?was unique

Passages & reports (3)
  • customer dispute, can you provide just a little bit more background? You said it was longs…
  • was
  • unique

Speaker unclear

?about that dispute versus the normal

Passages & reports (1)
  • about that dispute versus the normal

Speaker 7

types of relationships that you have ?with your large carrier customers

Passages & reports (3)
  • types of relationships that you have
  • with
  • your large carrier customers

Speaker 4

and the payment that you made? is that related to the deferred purchase

Passages & reports (1)
  • and the payment that you made? is that related to the deferred purchase

Speaker unclear

?price

Passages & reports (1)
  • price

Speaker 7

associated with

Passages & reports (1)
  • associated with

Speaker 4

some of the carrier

Passages & reports (1)
  • some of the carrier

Speaker 2

lease

Passages & reports (1)
  • lease

Speaker 7

backs, you know,

Passages & reports (1)
  • backs, you know,

Speaker unclear

?where

Passages & reports (1)
  • where

Speaker 2

there's a certain amount of

Passages & reports (1)
  • there's a certain amount of

Speaker unclear

?money that gets deferred into the future? Or is there just

Passages & reports (1)
  • money that gets deferred into the future? Or is there just

Speaker 2

I

Passages & reports (1)
  • I

Speaker unclear

?know you mentioned some of the benefit you expect to leasing dollars, but any

Passages & reports (1)
  • know you mentioned some of the benefit you expect to leasing dollars, but any

Speaker 7

other context that you can provide ?there would be super helpful? And then just separately back to

Passages & reports (3)
  • other context that you can provide
  • there
  • would be super helpful? And then just separately back to

Speaker unclear

?the topic of

Passages & reports (1)
  • the topic of

Speaker 2

uh dish. Can you share how many of your

Passages & reports (1)
  • uh dish. Can you share how many of your

Speaker unclear

?40,000 locations uh did Dish get

Passages & reports (1)
  • 40,000 locations uh did Dish get

Speaker 4

to with their infrastructure before they hit the stop button? Thanks.

Passages & reports (1)
  • to with their infrastructure before they hit the stop button? Thanks.

Speaker unclear

?Yeah,

Passages & reports (1)
  • Yeah,

Speaker 1

let me start with the second one first. I think the easy

Passages & reports (1)
  • let me start with the second one first. I think the easy

Speaker 2

answer on the DISH was they uh had 12,000 plus installed sites ?uh with the ability to go up to 20,000 uh over time as they developed their network. ?And then in terms of again, not so much a dispute, but just more of a long standing customer issue. Um this is I would characterize it as just part of the normal back and forth that uh tower companies and their customers have over time.

Um, but it was something that by resolving it opens
up the door for additional growth. That that was the key for us as a catalyst in uh getting this uh getting this sorted.

Passages & reports (6)
  • answer on the DISH was they uh had 12,000 plus installed sites
  • uh
  • with the ability to go up to 20,000 uh over time as they developed their network.
  • And
  • then in terms of again, not so much a dispute, but just more of a long standing customer i…
  • up the door for additional growth. That that was the key for us as a catalyst in uh gettin…

Speaker 3

Yes, and uh a couple of additional things. You asked if we were purchasing uh you know futures, uh, you know, uh this wasn't that at all. This is more to do with the fact that this residuable residual economic interest uh is they were getting benefits from some of ?the revenues. So this just was a simplification, there was a win-win for both of ?us.

I think for them it it simplifies uh uh things for them on their side. For us, it's it it was uh a creative transaction for us uh if you look at on a multiple basis. Uh and also it came with a term extension and an agreement to limit churn on a longer term
basis. So I would say if you look at it in terms of uh from a balance sheet perspective, yeah, it's 275 million of which 158 million we put on other intangible assets.

Uh and then the other hundred and eighteen in just other current activities, but that's that's the value of the contractual
term extension and limiting the churn. So that's that's what it was. It it didn't really have any anything to do with any purchase options or anything like

Passages & reports (7)
  • Yes, and uh a couple of additional things. You asked if we were purchasing uh you know fut…
  • the
  • revenues. So this just was a simplification, there was a win-win for both of
  • us.
  • I think for them it it simplifies uh uh things for them on their side. For us, it's it it …
  • basis. So I would say if you look at it in terms of uh from a balance sheet perspective, y…
  • term extension and limiting the churn. So that's that's what it was. It it didn't really h…

Speaker unclear

?that.

Passages & reports (1)
  • that.

Speaker 4

I appreciate all

Passages & reports (1)
  • I appreciate all

Speaker unclear

?that detail. And

Passages & reports (1)
  • that detail. And

Speaker 7

if

Passages & reports (1)
  • if

Speaker unclear

?I just follow up with one other thing on that.

Passages & reports (1)
  • I just follow up with one other thing on that.

Speaker 0

So

Passages & reports (1)
  • So

Speaker unclear

?uh given what you described on the churn side, does

Passages & reports (1)
  • uh given what you described on the churn side, does

Speaker 4

this make the case stronger that

Passages & reports (1)
  • this make the case stronger that

Speaker unclear

?annual churn, you know, extra

Passages & reports (1)
  • annual churn, you know, extra

Speaker 2

the sprint uh decommissioning side of ?it could you know stay below one percent per year?

Passages & reports (3)
  • the sprint uh decommissioning side of
  • it
  • could you know stay below one percent per year?

Speaker unclear

?Yeah,

Passages & reports (1)
  • Yeah,

Speaker 3

I mean so as you know we we said uh churn is uh fifty to a hundred hundred um uh basis points, fifty pro probably call it, but uh ?it's so it it impacts churn, but uh you know, as I said, it's for a small ?is a subset of the towers, so so not uh big enough to to kind of impact our guide long term guidance we've talked about with respect to churn.

But it's certainly beneficial.

Passages & reports (5)
  • I mean so as you know we we said uh churn is uh fifty to a hundred hundred um uh basis poi…
  • it's
  • so it it impacts churn, but uh you know, as I said, it's for a small
  • is
  • a subset of the towers, so so not uh big enough to to kind of impact our guide long term g…

Speaker unclear

?Thanks very much.

Passages & reports (1)
  • Thanks very much.

Speaker 1

Thank you.

Passages & reports (1)
  • Thank you.

Speaker 0

The next question will come from Mike Ng with Gold Goldman Sachs. Please go ahead. Hey, good afternoon.

Passages & reports (1)
  • The next question will come from Mike Ng with Gold Goldman Sachs. Please go ahead. Hey, go…

Speaker unclear

?Thanks for the question.

Passages & reports (1)
  • Thanks for the question.

Speaker 1

First, I was just wondering if you ?could um comment on some of the lower

Passages & reports (3)
  • First, I was just wondering if you
  • could
  • um comment on some of the lower

Speaker 2

network services activity in the quarter ?and um if you expect that to um kind of return back to more of a normal cadence after this quarter.

Passages & reports (3)
  • network services activity in the quarter
  • and
  • um if you expect that to um kind of return back to more of a normal cadence after this qua…

Speaker 3

Yeah. Yeah, I mean look, if you look at our guidance uh for the service business this year uh it's uh eighty five million. So if you look at what we reported in the third quarter, that implies we'll see a nice pickup in the in the fourth quarter, a nice increase ?in the fourth quarter. So yeah, it it it returns to more of a normal cadence cadence, uh probably not at the levels we might have guided to, but yeah, in that close enough in that vicinity, um ?at least in the fourth quarter.

Passages & reports (5)
  • Yeah. Yeah, I mean look, if you look at our guidance uh for the service business this year…
  • in
  • the fourth quarter. So yeah, it it it returns to more of a normal cadence cadence, uh prob…
  • at
  • least in the fourth quarter.

Speaker unclear

?Great. Thanks.

Passages & reports (1)
  • Great. Thanks.

Speaker 1

And um I was just wondering if you

Passages & reports (1)
  • And um I was just wondering if you

Speaker unclear

?could talk a little bit more

Passages & reports (1)
  • could talk a little bit more

Speaker 2

about um the operational efficiencies uh in the quarter um and some of the kind of key drivers of the two hundred bips of margin expansion over the next few years. Um any change in terms of um ?you know key things that could help you

Passages & reports (3)
  • about um the operational efficiencies uh in the quarter um and some of the kind of key dri…
  • you know
  • key things that could help you

Speaker unclear

?there? Yeah,

Passages & reports (1)
  • there? Yeah,

Speaker 3

I mean so Chris uh talked about a couple of systems implementations we've done. Uh we've got more of those coming up uh next year and the year after that. Um and and then you know we also talked about uh exiting our transition services agreement that'll lead to further simplica simplification in future periods. So I ?think uh we've been consistent about saying our margin uh will improve two two hundred uh plus basis points between here and twenty thirty.

But the fact is we are uh we made more progress on that on this year and still sticking to that uh that guidance, which which I think should
say on the margin we are doing better than what we had indicated at the beginning of the year.

Passages & reports (5)
  • I mean so Chris uh talked about a couple of systems implementations we've done. Uh we've g…
  • simplification in future periods. So I
  • think
  • uh we've been consistent about saying our margin uh will improve two two hundred uh plus b…
  • say on the margin we are doing better than what we had indicated at the beginning of the y…

Speaker unclear

?Well,

Passages & reports (1)
  • Well,

Speaker 1

particularly pr particularly the

Passages & reports (1)
  • particularly pr particularly the

Speaker 2

GLBO as is

Passages & reports (1)
  • GLBO as is

Speaker 3

a

Passages & reports (1)
  • a

Speaker 1

driver of our business.

Passages & reports (1)
  • driver of our business.

Speaker 2

We know we

Passages & reports (1)
  • We know we

Speaker 1

identified

Passages & reports (1)
  • identified

Speaker unclear

?at

Passages & reports (1)
  • at

Speaker 2

the start of the year that we had a gap to

Passages & reports (1)
  • the start of the year that we had a gap to

Speaker 1

what our

Passages & reports (1)
  • what our

Speaker 2

key competitors had in terms of owning land underneath our towers and embarked on a strategic program to accelerate those activities, which we we've effectively doubled more than doubled year over year, and continues to be a large driver of the efficiency and cost savings that uh that we're investing in that today.

Passages & reports (1)
  • key competitors had in terms of owning land underneath our towers and embarked on a strate…

Speaker unclear

?Great. Thank you very much. The

Passages & reports (1)
  • Great. Thank you very much. The

Speaker 0

next question will come from Matt Nicknam with Truis. Please go ahead.

Passages & reports (1)
  • next question will come from Matt Nicknam with Truis. Please go ahead.

Speaker unclear

?Hey

Passages & reports (1)
  • Hey

Speaker 6

guys, thanks for taking the questions. I'll keep it at two as well, but I'll keep them simple. First on services, I I know you had maybe alluded ?to the expected downtick that we actually ended up seeing in the third quarter.

Passages & reports (3)
  • guys, thanks for taking the questions. I'll keep it at two as well, but I'll keep them sim…
  • to the
  • expected downtick that we actually ended up seeing in the third quarter.

Speaker unclear

?Is there any indication of broader, softer

Passages & reports (1)
  • Is there any indication of broader, softer

Speaker 2

leasing from carriers ahead of next year's upper C band auctions. ?And then secondly, on the edge data centers, can you speak to whether there's a general type or size of customer you're speaking to for these trials and if there are any sort of specific uh use cases they're typically trying to solve for? Thanks. ?Yeah, I mean, in

Passages & reports (5)
  • leasing from carriers ahead of next year's upper C band auctions.
  • And
  • then secondly, on the edge data centers, can you speak to whether there's a general type o…
  • Yeah,
  • I mean, in

Speaker unclear

?terms of the services, you

Passages & reports (1)
  • terms of the services, you

Speaker 2

heard uh me refer earlier to the fact that 600 megahertz had been pushed out. And so um this was something that when we led in the guide to would have an uptick in in 4Q. Is now that the transaction has been completed and applications are starting to flow, is that is the the largest individual component from a services perspective. In terms of the edge data centers, um, ?you know, again, the traditional installation has been in a sub one megawatt in a in a 0.2 to 0.5.

It's providing edge data compute at at the cell site in the existing structures that we have,
supporting use cases of kind of both a combination of capacity supply in a high demand data center environment combined with folks that need the low latency that's provided by ?the fact of our cell sites being as close to the edge as they are. Those are the primary installation types that we're seeing in that space.

Passages & reports (7)
  • heard uh me refer earlier to the fact that 600 megahertz had been pushed out. And so um th…
  • largest individual component from a services perspective. In terms of the edge data center…
  • you
  • know, again, the traditional installation has been in a sub one megawatt in a in a 0.2 to …
  • supporting use cases of kind of both a combination of capacity supply in a high demand dat…
  • the
  • fact of our cell sites being as close to the edge as they are. Those are the primary insta…

Speaker unclear

?Yeah,

Passages & reports (1)
  • Yeah,

Speaker 3

and a couple of things. I mean remember, I think we've said that the service business has always been lumpy for us in any given quarter. Uh we've talked about that in the past. From a long term trend perspective, no, and I think we talked about this earlier, we've seen a time shift, but uh the interest level in general continues to be pretty strong and active uh and maybe helped by the change in the competitive environment a

Passages & reports (2)
  • and a couple of things. I mean remember, I think we've said that the service business has …
  • uh the interest level in general continues to be pretty strong and active uh and maybe hel…

Speaker unclear

?little.

Passages & reports (1)
  • little.

Speaker 5

Thank

Passages & reports (1)
  • Thank

Speaker unclear

?you.

Passages & reports (1)
  • you.

Speaker 0

The next question will come from David Borden with New Street. Please go ahead.

Passages & reports (1)
  • The next question will come from David Borden with New Street. Please go ahead.

Speaker unclear

?Hey

Passages & reports (1)
  • Hey

Speaker 5

guys, thanks so much for taking the questions. I ?appreciate it.

Passages & reports (3)
  • guys, thanks so much for taking the questions. I
  • appreciate
  • it.

Speaker unclear

?I guess the first, if I could,

Passages & reports (1)
  • I guess the first, if I could,

Speaker 5

would be the language around what SpaceX seems to be trying to do seems to be very prospective. Like it's going to maybe probably, eventually someday build a network. You know, your services business has been very much about planning and permitting and those sorts of things. Usually when companies are planning on building something, they kind of come to you guys first and then they buy the spectrum.

They don't buy the spectrum first and then figure out how to use it
later. Could you guys weigh in on that a little bit on how you really think what's actually happening there? And then the second question, if I ?could please, would be regarding the upper C-band auction. We all know the auction is going to happen next year, but that the deployment is going to be delayed because of the

Passages & reports (5)
  • would be the language around what SpaceX seems to be trying to do seems to be very prospec…
  • network. You know, your services business has been very much about planning and permitting…
  • later. Could you guys weigh in on that a little bit on how you really think what's actuall…
  • could
  • please, would be regarding the upper C-band auction. We all know the auction is going to h…

Speaker 4

potential interference

Passages & reports (1)
  • potential interference

Speaker unclear

?with

Passages & reports (1)
  • with

Speaker 5

the FAA optimeter issues. So when do you think that that would actually begin? It's probably not going to begin at the last minute in 2030-2031. It's probably going to begin sooner rather than later. So if you could give us a sense as to the conversations you're having on that topic, it would be hugely helpful. Thank

Passages & reports (2)
  • the FAA optimeter issues. So when do you think that that would actually begin? It's probab…
  • be hugely helpful. Thank

Speaker unclear

?you.

Passages & reports (1)
  • you.

Speaker 2

Sure. Thanks for the question. So let's start with the SpaceX. And I think you raise a great point for those of us that have spent their careers designing, building, operating networks, of which I spent more than half my career doing for Verizon predecessor and T Mobile, is you realize how complex these things are, how long it takes. And what I think Crown brings to the table is a strong pedigree of experience in helping customers get on air quickly from the time an application comes in to the time that we give them an NTP to get up on air.

And so if SpaceX as serious
as it sounds like they are in building a terrestrial network, I think we are a great partner for them in being able to help take a concept and turning it into reality of how to navigate through building a terrestrial network, which is again very, very different, obviously, than building a satellite network, as we'd be the first to admit.

So that's something that we believe we can add value to. And again, based on our portfolio
?and the fact of the partnership that we had with DISH initially, that we have the majority of our sites and top 100 markets where the vast majority of POPs are located. This is something that we can help to solve for, I think, in a in a significant way.

And so we stand ready uh
when and if that that uh that time comes. Then more broadly on your comments on the upper C band, yeah. So th there's always been this issue where spectrum is uh goes to to to market an auction, it takes the time that it takes to do an auction, then the aftermath of that is the spectrum clearing uh before it can be put into use.

What I've I think I've I've shared in the past is where there's a will, there's a way. And so if you think back to when the original C band spectrum was being put into place and there was issues with uh potential
adjacent channel interference with the altimeters, is that the industry found a way to work around that and to accelerate those activities.

And so
?I I don't know that you can put an exact date on when it is. There's typically a deadline by which the FCC sets for having the spectrum clear, but oftentimes that's not the actual date that the spectrum is cleared and put into put into service. So I believe it's one of these things where you know stay tuned to the space, but I I would not anticipate that it takes that long.

There is a desperate need to put additional spectrum to work based on the data growth that we've talked about before. And therefore, again, where there's a will, there's a way to find a way to clear
it and get it up on towers as quickly as possible.

Passages & reports (13)
  • Sure. Thanks for the question. So let's start with the SpaceX. And I think you raise a gre…
  • are, how long it takes. And what I think Crown brings to the table is a strong pedigree of…
  • as it sounds like they are in building a terrestrial network, I think we are a great partn…
  • we'd be the first to admit. So that's something that we believe we can add value to. And a…
  • and
  • the fact of the partnership that we had with DISH initially, that we have the majority of …
  • when and if that that uh that time comes. Then more broadly on your comments on the upper …
  • is the spectrum clearing uh before it can be put into use. What I've I think I've I've sha…
  • adjacent channel interference with the altimeters, is that the industry found a way to wor…
  • I
  • I don't know that you can put an exact date on when it is. There's typically a deadline by…
  • you know stay tuned to the space, but I I would not anticipate that it takes that long. Th…
  • it and get it up on towers as quickly as possible.

Speaker unclear

?I I really

Passages & reports (1)
  • I I really

Speaker 5

appreciate those comments. And I just want to be crystal clear that when you say that you stand ready to be a partner, that the reality is that that SpaceX really hasn't reached

Passages & reports (1)
  • appreciate those comments. And I just want to be crystal clear that when you say that you …

Speaker unclear

?out to do anything and that we're just kind of

Passages & reports (1)
  • out to do anything and that we're just kind of

Speaker 4

waiting to

Passages & reports (1)
  • waiting to

Speaker unclear

?find out what the plan is. Is that what

Passages & reports (1)
  • find out what the plan is. Is that what

Speaker 4

you're

Passages & reports (1)
  • you're

Speaker unclear

?saying?

Passages & reports (1)
  • saying?

Speaker 2

I I I what what I said, I'll just reiterate what I said earlier, which ?is um you know, we won't discuss individual customer discussions, and you can assume that we're talking to all of

Passages & reports (3)
  • I I I what what I said, I'll just reiterate what I said earlier, which
  • is
  • um you know, we won't discuss individual customer discussions, and you can assume that we'…

Speaker unclear

?them.

Passages & reports (1)
  • them.

Speaker 7

Great.

Passages & reports (1)
  • Great.

Speaker unclear

?All

Passages & reports (1)
  • All

Speaker 4

right,

Passages & reports (1)
  • right,

Speaker unclear

?man. I really appreciate it. Thank you.

Passages & reports (1)
  • man. I really appreciate it. Thank you.

Speaker unclear

?And

Passages & reports (1)
  • And

Speaker 0

the last question for the day will come from Bataya Levi with UBS.

Passages & reports (1)
  • the last question for the day will come from Bataya Levi with UBS.

Speaker 4

Great. Thank you so much. Just wanted to get back to the discussion about the dispute you had with the customer. Is is there any reserve that we need to factor in as a reversal as we forecast ahead? Maybe a cash component that you are expecting to receive? And is this an extension of an existing portfolio or addition

Passages & reports (2)
  • Great. Thank you so much. Just wanted to get back to the discussion about the dispute you …
  • an existing portfolio or addition

Speaker unclear

?of a of a new lease from the key customer? And any color in terms of how long that lease is and if it has a normal escalator would be household.

Passages & reports (1)
  • of a of a new lease from the key customer? And any color in terms of how long that lease i…

Speaker 3

It's uh extension of an existing portfolio. There are no reserves or anything in the future. I think it's sort of like what I described it. Uh we are paying two hundred seventy five million to acquire a residual economic interest on the revenue side. Uh and that's uh what it is. But in addition to that, they extended the the term of the contract for this particular set of towers, if you like, and agree to limit churn on a longer term basis.

So I think those those are
?the critical value components of this transaction.

Passages & reports (4)
  • It's uh extension of an existing portfolio. There are no reserves or anything in the futur…
  • addition to that, they extended the the term of the contract for this particular set of to…
  • the
  • critical value components of this transaction.

Speaker unclear

?With

Passages & reports (1)
  • With

Speaker 3

a three percent

Passages & reports (1)
  • a three percent

Speaker 5

escalator?

Passages & reports (1)
  • escalator?

Speaker 3

Specific extension, but uh yeah.

Passages & reports (1)
  • Specific extension, but uh yeah.

Speaker 5

Okay. Thank

Passages & reports (1)
  • Okay. Thank

Speaker unclear

?you. I

Passages & reports (1)
  • you. I

Speaker 3

mean you'll you get some sense of it from the straight line revenue treatment, but yeah, can't can't give you more specifics than that, sorry.

Passages & reports (1)
  • mean you'll you get some sense of it from the straight line revenue treatment, but yeah, c…

Speaker 0

And this will conclude our question and answer session as well as our conference call for today. Thank you for your participation. You may now disconnect.

Passages & reports (1)
  • And this will conclude our question and answer session as well as our conference call for …
Source, accuracy & exportsMay contain errorsAccuracy unmeasured. Speakers are anonymous voice labels, local to this call. No names are verified. Section starts and timestamps are inferred. Speakers are anonymous voice labels, local to this call. No names are verified. Section starts and timestamps are inferred.

Short unclear spans may appear inline between matching voice IDs. The ? marker retains unknown attribution; no voice identity is inferred for those words.

AI-generated transcript; names, numbers and wording may be inaccurate.

Speaker IDs are anonymous and local to this call. Section boundaries and timestamps are inferred.

1 words have zero-duration alignments. Use surrounding audio; no timing has been repaired.

The diarizer reached its eight-speaker limit; distinct voices may share an ID.

Zero-duration alignments: 1. Unassigned words: 357. No alignment has been repaired. Timestamps locate passages in the source recording; decimal positions do not establish word-level precision.

Official issuer source ↗ · Report an issue

Published transcript · Full recording available. Publication updated 2026-11-16T02:32:24.550Z.
Transcript version v1-6afe2bd65f4e8e5acd67 · publication revision 1. Generated by AI; no listener-verified accuracy score is available.

Dotted spans marked ? have an unclear speaker. They remain unattributed even when shown inside a surrounding turn.

Copy or download
ReadableGrouped by speaker and paragraph with timestamps. Stored words unchanged.
As storedOne line per stored segment with its original speaker ID and start time. Exactly the stored words.
Official issuer source ↗Company overview ↗
TRANSCRIPT FEEDBACK

Report a passage

Your report is queued privately for review. It does not change this transcript automatically. Please avoid personal information.