Good day everyone. My name is Ryan and I will be your conference operator today. At this time, I'd like to welcome you all to the Amerin Corporation Third Quarter 2026 earnings call. All lines have been placed on mute to prevent any background noise. After the speaker's remarks, there will be a question and answer session. ?If you would like to ask a question during this time and if you have joined via the webinar, please use the raise hand icon, which can be found at the bottom of your webinar application.

At this time, I'd like to turn the call over to Andrew Kirk, Senior Director of Investor Relations and Corporate
Modeling.

Passages & reports (5)
  • Good day everyone. My name is Ryan and I will be your conference operator today. At this t…
  • answer session.
  • If
  • you would like to ask a question during this time and if you have joined via the webinar, …
  • Modeling.

Speaker 1

Unverified voice label

Thank you and good morning. On the call with me today are Marty Lyons, Chairman, President, and Chief Executive Officer, Michael Main, Group President of our Amran Utilities, and Lenny Sing, Executive Vice President and Chief Financial Officer, as well as other members of the AMRIN management team. This call contains time sensitive data that is accurate only as of the date of today's live broadcast, and redistribution of this broadcast is prohibited.

We have posted a presentation on the AmhernInvestors.com homepage that will be referenced by our speakers. As noted on page two of the presentation, comments made during this conference call may contain statements about future expectations, plans,
projections, financial performance, and similar matters which are commonly referred to as forward-looking statements. Please refer to the forward-looking statements section in the news release we issued yesterday, as well as our SEC filings for more information about the various factors that could cause actual results to differ materially from those anticipated.

Lastly, all
per share earnings amounts discussed during today's presentation, including earnings guidance, ?are presented on a diluted basis unless otherwise noted. Now here's Marty, who will start on page four. Thanks,

Passages & reports (6)
  • Thank you and good morning. On the call with me today are Marty Lyons, Chairman, President…
  • is accurate only as of the date of today's live broadcast, and redistribution of this broa…
  • projections, financial performance, and similar matters which are commonly referred to as …
  • per share earnings amounts discussed during today's presentation, including earnings guida…
  • are
  • presented on a diluted basis unless otherwise noted. Now here's Marty, who will start on p…

Speaker unclear

?Andrew. Good

Passages & reports (1)
  • Andrew. Good

Speaker 2

Unverified voice label

morning, everyone, and thank you for joining us. Starting on page four with key highlights. Today, we're very excited to share an update to our growth story, one driven by growing customer energy needs, economic development across our region, and the need for an even more resilient grid. We are well positioned to meet these needs, support expansion, and deliver durable value to our customers, communities, and shareholders.

First, reflecting our strong year-to-date performance and outlook, we have raised our 2026 earnings per share guidance range and issued 2027 earnings per share guidance that represents solid
year-over-year growth. Looking further ahead, we have also raised our long-term growth outlook with expected compound annual earnings per share growth of 8 to 10% from 2027 through 2031. This outlook reflects strong economic development across our service territory, particularly in Missouri, where 2.8 gigawatts of signed electric service agreements underpin our higher sales forecast and increased generation investment plan with additional opportunities in the pipeline.

Regional economic growth is also driving incremental investment opportunities in our transmission segment
to connect new generation resources and serve new large load customers. ?To meet this increasing energy need, we plan to strategically invest $38.1 billion in energy infrastructure over the next five years, which is expected to drive 13.3% compound annual rate base growth from 2026 through 2031. ?What excites me most about this plan is the opportunity to create lasting value for our customers and communities through a safer, more reliable, and more resilient grid while directly supporting a growing economy with more and better jobs.

Indeed, our strategy, outlined on page
five, ?is centered on delivering value to the customers and communities we serve, including 2.5 million electric and 900,000 natural gas customers across Missouri and Illinois. By investing in and strengthening our energy infrastructure, advocating for constructive energy policies, and continuously optimizing performance to improve service quality, we are delivering on what matters most to our customers: safe, reliable energy at the lowest cost possible.

Turning to page six, execution of our strategy is delivering tangible customer benefits. Over time, we have achieved top-quartile reliability
performance and strong customer service satisfaction. We have also supported tens of billions of dollars in annual economic impact, and in 2025 alone, an estimated 63,000 jobs while keeping average residential rates below national and Midwest averages. ?And that's before factoring in the significant additional economic impact from the large load and other customer growth our investments facilitate, including significant incremental tax revenue for our communities.

Highlighted on page 7, execution of our strategy has also delivered strong, consistent shareholder
results. Since divesting our merchant business in 2013, weather normalized adjusted earnings per share have grown at a compound annual rate of approximately 7.4%. Annual dividends per share have increased 78%, and total shareholder return has exceeded 300%, significantly outperforming utility index averages. Looking ahead, we believe continued execution of this strategy, centered on delivering value for customers and communities, will continue to drive superior long-term returns for our shareholders.

Turning now to page

Passages & reports (18)
  • morning, everyone, and thank you for joining us. Starting on page four with key highlights…
  • needs, support expansion, and deliver durable value to our customers, communities, and sha…
  • year-over-year growth. Looking further ahead, we have also raised our long-term growth out…
  • particularly in Missouri, where 2.8 gigawatts of signed electric service agreements underp…
  • to connect new generation resources and serve new large load customers.
  • To
  • meet this increasing energy need, we plan to strategically invest $38.1 billion in energy …
  • What
  • excites me most about this plan is the opportunity to create lasting value for our custome…
  • five,
  • is
  • centered on delivering value to the customers and communities we serve, including 2.5 mill…
  • performance to improve service quality, we are delivering on what matters most to our cust…
  • performance and strong customer service satisfaction. We have also supported tens of billi…
  • And
  • that's before factoring in the significant additional economic impact from the large load …
  • results. Since divesting our merchant business in 2013, weather normalized adjusted earnin…
  • significantly outperforming utility index averages. Looking ahead, we believe continued ex…

Speaker unclear

?eight.

Passages & reports (1)
  • eight.

Speaker 2

Targeted, timely infrastructure investments are key to delivering reliable service. As shown on the right, we invested more than $4 billion in energy infrastructure through September to strengthen reliability and resiliency and improve service. ?The value of continued investment was evident during the third quarter's extreme heat when our infrastructure performed well and our team successfully managed the system through periods of exceptionally high demand, keeping our coworkers safe, homes cool, and businesses running. ?

This
year's severe weather, with Illinois leading the nation in tornado activity, further underscores the importance of building a stronger, more resilient energy system and having skilled teams in place to operate it safely and reliably. ?In 2026 through September, investments in grid automation helped avoid more than 63 million customer outage minutes across both Missouri and Illinois, a tangible example of how infrastructure investment translates into better service.

We also made strong progress on many other objectives, which
I'll discuss in a ?moment. Moving to page nine. Yesterday we reported third quarter 2026 earnings of $2.42 per share compared to adjusted earnings of $2.17 per share in the third quarter of 2025. ?The key drivers of our strong third quarter results are outlined on this page. ?In light of a strong year-to-date performance, we raised our 2026 earnings per share guidance range to $5.35 cents to five dollars and fifty-five cents from our original range of five dollars and twenty-five cents to five dollars and forty-five cents.

Turning to page 10 for our 2027 guidance outlook.
?We have a long track record of strong and consistent earnings per share growth. As we look ahead, we expect this to continue. We expect 2027 earnings to be in the range of five dollars and seventy cents to five dollars and ninety cents per share. ?The midpoint of this range represents 8.4% earnings per share growth compared to our original 2026 earnings guidance midpoint.

Lenny will provide the key drivers for 2026 and expected 2027 earnings later in the call. Turning to page 11 and Amhern, Missouri sales growth
expectations. ?At Amran, we are proud to provide the quality of service that is necessary to attract investment and economic growth to our region. ?The pipeline of economic development interest within our service territory remains robust across Missouri and Illinois.

Our five-year financial plan laid out today assumes 12.9% compound annual sales growth in Missouri from 2027 through 2031, based on an assumption of
2.9 gigawatts of new load by 2031. This growth assumption, as depicted by the dashed green line on the chart on the right hand side of this page, is consistent with our preferred resource plan through 2030, which projects a 60% increase in Missouri sales by 2030 from 2027 levels. ?

This
growth is supported by the existing 2.8 gigawatts of electric service agreements, with sales from those agreements expected to reach full capacity in 2030. Beyond these signed agreements, our pipeline includes 1.2 gigawatts of projects with construction agreements and an additional 4.4 gigawatts of projects with completed interconnection studies. We were pleased to see one of the projects with a completed interconnection study advanced to a construction agreement since our second quarter update.

Consistent with the requirements of Missouri Senate Bill 4, large load customers will pay for the power and infrastructure costs driven
by their operations. And once their sites are operational, large load customers will contribute to paying fixed costs of the energy grid, providing long-term cost benefits for other customers. Moving then to page 12 for an update on Missouri's generation plan. ?In September, Amaron Missouri filed its 2026 Integrated Resource Plan, updating its 20-year roadmap to reliably and cost effectively meet customers' energy needs under a range of future conditions.

Using an optimal mix of natural gas, solar, energy storage, wind, nuclear, and other technologies, our
preferred resource plan is designed to serve 3.4 gigawatts of additional demand by 2031 and 5 gigawatts by 2036. To support this growth, the plan calls for accelerating and expanding natural gas generation and battery storage, expanding solar generation and adding fuel cell generation, extending the retirement date of two Labity Energy Center units from 2036 to 2042, and adding new nuclear generation by 2040.

Importantly, the table on this page identifies the preferred resource plan additions included
?in our 2027 through 2031 capital plan. The five-year capital plan supports 2.9 gigawatts of incremental load growth by 2031. Preferred plan resources identified as not included in our five-year capital and rate-based growth plans represent potential upside to our outlook as we execute additional electric service agreements. We will continue to provide updates on any additional electric service agreements and associated investment needs as appropriate.

On page 13,
?we outline how continued execution of our strategy is expected to drive strong growth over the next five years. Today, we're rolling forward our five-year capital plan, which now totals $38.1 billion, reflecting significant investment to serve the anticipated load growth I just discussed while strengthening system reliability. ?We expect these investments to drive 13.3% compound annual rate-based growth from 2026 through 2031.

Leveraging our proven strategy and building upon our track record of strong earnings growth, we expect to deliver 8 to 10% compound annual earnings per share growth
from 2027 through 2031, using our 2027 guidance midpoint of $5.80 per share as the base. As large load sales ramp in 2028 and 2029, we expect annual earnings per share growth near the upper end of that range in those years.

We
also expect to deliver strong, sustainable annual dividend growth as our earnings grow, with a payout ratio ranging between 45 to 55%.

Passages & reports (43)
  • Targeted, timely infrastructure investments are key to delivering reliable service. As sho…
  • The
  • value of continued investment was evident during the third quarter's extreme heat when our…
  • This
  • year's severe weather, with Illinois leading the nation in tornado activity, further under…
  • In
  • 2026 through September, investments in grid automation helped avoid more than 63 million c…
  • I'll discuss in a
  • moment.
  • Moving to page nine. Yesterday we reported third quarter 2026 earnings of $2.42 per share …
  • The
  • key drivers of our strong third quarter results are outlined on this page.
  • In
  • light of a strong year-to-date performance, we raised our 2026 earnings per share guidance…
  • We
  • have a long track record of strong and consistent earnings per share growth. As we look ah…
  • The
  • midpoint of this range represents 8.4% earnings per share growth compared to our original …
  • expectations.
  • At
  • Amran, we are proud to provide the quality of service that is necessary to attract investm…
  • The
  • pipeline of economic development interest within our service territory remains robust acro…
  • 2.9 gigawatts of new load by 2031. This growth assumption, as depicted by the dashed green…
  • 2027 levels.
  • This
  • growth is supported by the existing 2.8 gigawatts of electric service agreements, with sal…
  • projects with completed interconnection studies. We were pleased to see one of the project…
  • by their operations. And once their sites are operational, large load customers will contr…
  • In
  • September, Amaron Missouri filed its 2026 Integrated Resource Plan, updating its 20-year r…
  • preferred resource plan is designed to serve 3.4 gigawatts of additional demand by 2031 an…
  • cell generation, extending the retirement date of two Labity Energy Center units from 2036…
  • in
  • our 2027 through 2031 capital plan. The five-year capital plan supports 2.9 gigawatts of i…
  • as we execute additional electric service agreements. We will continue to provide updates …
  • we
  • outline how continued execution of our strategy is expected to drive strong growth over th…
  • system reliability.
  • We
  • expect these investments to drive 13.3% compound annual rate-based growth from 2026 throug…
  • from 2027 through 2031, using our 2027 guidance midpoint of $5.80 per share as the base. A…
  • also expect to deliver strong, sustainable annual dividend growth as our earnings grow, wi…

Speaker unclear

?As

Passages & reports (1)
  • As

Speaker 2

we invest to support meaningful economic growth in our communities, our focus remains on delivering reliable, affordable service for all customers, with large load customers paying the costs required to serve their operations. I'm truly excited about the opportunity to support this significant growth and the lasting benefits it can bring to local communities and across our region. I'll now turn the call over to Michael to discuss our disciplined approach ?to delivering the generation and transmission resources needed to meet our growing sales.

Thanks, Marty,

Passages & reports (4)
  • we invest to support meaningful economic growth in our communities, our focus remains on d…
  • communities and across our region. I'll now turn the call over to Michael to discuss our d…
  • to
  • delivering the generation and transmission resources needed to meet our growing sales. Tha…

Speaker unclear

?and good

Passages & reports (1)
  • and good

Speaker 3

Unverified voice label

morning, everyone. I'll begin on page 15. ?As Marty outlined, significant economic development is driving growing energy needs across our region. Our economic development teams remain focused on supporting long-term business investment and job growth. That work is translating into tangible results for our communities. During the second quarter, Google and Amazon announced projects in our Missouri service territory representing a combined planned investment of $25 billion.

These projects are part of the 2.8 gigawatts of ESAs we signed earlier this
?year. As you can see from the photos on this page, the projects are well underway. These projects are creating thousands of construction jobs for local contractors and small businesses and will directly employ hundreds of people longer term once operational. These projects are also expected to generate billions of dollars in local tax revenue, helping fund schools and public safety, including fire stations and police stations, and improve roads, delivering lasting benefits to the communities where they operate.

Beyond these investments, Google and Amazon have committed millions of dollars through community benefit agreements to support new workforce development, energy efficiency,
and community focused programs both locally and across Missouri. ?We will continue to work closely with businesses interested in locating operations in our service territory to find the right solutions to meet their energy needs and ultimately support economic development in the region.

Moving to page 16, we continue to make strong progress advancing our generation portfolio to support customers' growing energy
needs with a focus on reliability and affordability. As our generation investment grows, we are applying lessons learned across projects through a disciplined portfolio based execution model. This includes standardizing designs and equipment as appropriate, securing long lead components early, leveraging experienced engineering and construction partners across multiple projects, and strengthening our internal team to provide consistent oversight.

Work underway at the Castle Bluff and Big Hollow Energy Centers is helping establish a repeatable execution model for other projects, including the 2.1 gigawatt
West Alton Energy Center. This approach is designed to improve productivity, better coordinate resources across projects, and increase schedule and cost predictability. We believe this approach positions us well to effectively execute future generation projects and meet increasing customer demand.

Turning to page 17.
?The execution focus we just discussed is critical as we advance AMR Missouri's broader generation plan. Consistent with our 2026 preferred resource plan, we are developing a balanced and diverse portfolio that includes adding approximately 7.7 gigawatts of new generation capacity from 2027 through 2031, ?which would increase Amher Missouri's install capacity by approximately 80%.

Passages & reports (19)
  • morning, everyone. I'll begin on page 15.
  • As
  • Marty outlined, significant economic development is driving growing energy needs across ou…
  • Amazon announced projects in our Missouri service territory representing a combined planne…
  • year. As
  • you can see from the photos on this page, the projects are well underway. These projects a…
  • local tax revenue, helping fund schools and public safety, including fire stations and pol…
  • and community focused programs both locally and across Missouri.
  • We
  • will continue to work closely with businesses interested in locating operations in our ser…
  • needs with a focus on reliability and affordability. As our generation investment grows, w…
  • leveraging experienced engineering and construction partners across multiple projects, and…
  • West Alton Energy Center. This approach is designed to improve productivity, better coordi…
  • demand. Turning to page 17.
  • The
  • execution focus we just discussed is critical as we advance AMR Missouri's broader generat…
  • 2031,
  • which
  • would increase Amher Missouri's install capacity by approximately 80%.

Speaker unclear

?With

Passages & reports (1)
  • With

Speaker 3

5.3 gigawatts of announced projects, we are making tangible progress towards that target. Approximately 2.3 gigawatts of simple cycle gas, solar, and battery storage resources have received regulatory approval, are under construction, and are expected to begin serving customers in 2027 and 2028. In July, we filed a CCN request for the 2.1 gigawatt West Alton facility, which is expected to be in service in 2031. ?

In
October, the Missouri PSC approved CCN requests for nearly one gigawatt of solar and storage resources following a five-month review. These projects are expected to begin serving customers in 2028 and 2029. With more than five gigawatts of new generation resources in progress and more in the pipeline, I'm pleased to say that our teams are well positioned to deliver these projects on schedule for our customers.

Planned generation additions are expected to generate approximately $2.75 billion of tax credits from 2027 through 2031, providing significant savings for our customers.

Passages & reports (5)
  • 5.3 gigawatts of announced projects, we are making tangible progress towards that target. …
  • 2028. In July, we filed a CCN request for the 2.1 gigawatt West Alton facility, which is e…
  • In
  • October, the Missouri PSC approved CCN requests for nearly one gigawatt of solar and stora…
  • the pipeline, I'm pleased to say that our teams are well positioned to deliver these proje…

Speaker 3

portfolio, ?and ensuring costs to serve new large load customers are appropriately allocated to such customers in accordance with Senate Bill 4. Moving to page 18 for a transmission update, we continue making robust investment in our region's transmission infrastructure to ensure ongoing reliability and efficiency. We expect our transmission investment levels to remain strong over time to support new large load customers and to connect the generation resources required to serve our our territory reliably as regional demand grows. ?

At
the same time, we remain focused on executing our assigned and awarded long range transition projects for the first two MISO LRTP tranches. ?In the second quarter, MISO selected our joint proposals for the Will and STU LRTP Tranche 2 competitive projects located in our Illinois Service Territory. Notably, we have won the opportunity to develop all five competitive long range transmission projects in our service territory within both the Tranch 1 and Tranch 2 portfolios, reflecting our strong record of delivering high-quality transmission infrastructure at a competitive cost.

I'm also pleased to say that last month, our joint proposal for the competitive ESOL transmission project, located in Iowa, was selected from among multiple bids. Over half of the approximate
$500 million investment opportunity is included in the capital plan issued today. Importantly, this marks our first competitive transmission project award outside of our service territory and further demonstrates our ability to effectively and efficiently design, build, and operate high-quality transmission infrastructure.

Passages & reports (10)
  • portfolio,
  • and
  • ensuring costs to serve new large load customers are appropriately allocated to such custo…
  • expect our transmission investment levels to remain strong over time to support new large …
  • At
  • the same time, we remain focused on executing our assigned and awarded long range transiti…
  • In
  • the second quarter, MISO selected our joint proposals for the Will and STU LRTP Tranche 2 …
  • 2 portfolios, reflecting our strong record of delivering high-quality transmission infrast…
  • $500 million investment opportunity is included in the capital plan issued today. Importan…

Speaker unclear

?On

Passages & reports (1)
  • On

Speaker 3

page 19, we outline the investment pipeline across our businesses over the next decade. These investments will support safety, reliability, and resiliency of the energy grid and economic development in our region, while positioning our system to power the quality of life for all of our customers in our territory. ?The pipeline now includes more than $90 billion in investment opportunity through 2036. ?The $19 billion increase in our 10-year pipeline primarily reflects the investments needed to serve the five gigawatts of load growth assumed within the new Air Missouri Preferred Resource Plan by 2036.

Moving to page 20, we recognize that our critical infrastructure projects represent significant investments,
which is why we prioritize the projects that are most beneficial for customers and maintain a sharp focus on keeping rates as low as possible. Through discipline cost management, we've been able to keep our AMRIN supplied residential rates in Missouri and Illinois on average below both national and Midwest averages. ?

In
addition, Amran invests hundreds of millions of dollars each year to support our customers and communities through energy efficiency programs and demand response initiatives. we announced $10 million of additional funding for programs to help eligible customers in need across Missouri and Illinois manage their energy bills. ?In addition to funding AMRIN developed programs, we also partner with a wide range of organizations to connect customers with available federal, state, and local assistance.

In 2026 through September, AMRIN customers have received more than $107 million in total energy assistance.

Passages & reports (11)
  • page 19, we outline the investment pipeline across our businesses over the next decade. Th…
  • The
  • pipeline now includes more than $90 billion in investment opportunity through 2036.
  • The
  • $19 billion increase in our 10-year pipeline primarily reflects the investments needed to …
  • which is why we prioritize the projects that are most beneficial for customers and maintai…
  • In
  • addition, Amran invests hundreds of millions of dollars each year to support our customers…
  • bills.
  • In
  • addition to funding AMRIN developed programs, we also partner with a wide range of organiz…

Speaker unclear

?We're

Passages & reports (1)
  • We're

Speaker 3

also focused on affordability through transformational process improvements, including implementation of several operational and process enhancements designed to increase efficiency and help manage cost. Since implementing these programs, we have achieved savings of over $100 million annually. For example, we have implemented a standardized planning and scheduling model across distribution operations that improves how work is planned, prioritized, cost estimated, and executed, reducing costs and enabling crews to be more productive.

We've also implemented initiatives designed to strengthen the efficiency of our third party spend.
?And also underway, we're working to improve the productivity of our gas operations through standardized operating practices and optimize crew deployment, streamlining operating costs while maintaining strong safety, service, and emergency response performance. ?We're also advancing a multi year digital roadmap to optimize operating costs, simplify the technology landscape, and position the company to leverage automation and AI capabilities more effectively. ?

I'm
excited by the operational milestones achieved to date, and I'm confident in our team's ability to effectively execute our investment plans in a way that benefit our customers and communities. ?I will now turn the call over to Lenny for a financial update.

Passages & reports (10)
  • also focused on affordability through transformational process improvements, including imp…
  • scheduling model across distribution operations that improves how work is planned, priorit…
  • And
  • also underway, we're working to improve the productivity of our gas operations through sta…
  • We're
  • also advancing a multi year digital roadmap to optimize operating costs, simplify the tech…
  • I'm
  • excited by the operational milestones achieved to date, and I'm confident in our team's ab…
  • I
  • will now turn the call over to Lenny for a financial update.

Speaker unclear

?Thanks,

Passages & reports (1)
  • Thanks,

Speaker 4

Unverified voice label

Michael. I'll begin on page twenty two of our presentation. Yesterday we reported third quarter twenty twenty six gap earnings ?of two dollars and forty two cents per share compared to third quarter quarter 2025 GAAP earnings ?of $2.35 per share and adjusted earnings of $2.17 per share. ?The difference between 2025 GAAP and the adjusted earnings reflected a previous disclosure of tax benefit of 18 cents per share. ?

The
year-over-year third quarter increase primarily reflected higher sales and favorable weather, higher earnings on investments in innovative energy technologies, and higher earnings on infrastructure investments to improve system reliability, resiliency, and service quality. ?The third quarter was the warmest in St. Louis in more than 50 years, with the month of September being the hottest on record. Separate from the impact of weather, we continue to experience solid customer growth at Amaron, Missouri, where weather-normalized electric retail sales for the trailing 12 months ended September increased approximately half a percent, primarily driven by the growth in the commercial customer class.

These positive factors were partially offset by higher operations and maintenance expenses at Ameryn, Missouri, primarily driven by increased reliability focused efforts. Moving to page 23 for select considerations for the remainder of the year.
?As Marty noted, yesterday we raised our 2026 earnings per share guidance due to strong year-to-date performance. The revised outlook assumes normal temperatures for the remainder of the year. ?As we close out the year, we expect higher expenditures for distribution line inspections, tree trimming, and energy center maintenance that will strengthen service for our customers.

Through continued execution of our strategy, we remain focused on delivering 2026 earnings within our updated guidance range. Turning to pages
24 and 25, for a brief update on the Missouri electric rate review we filed with the Missouri PSE in late June. ?The review is proceeding according to the established procedural schedule, and we expect Missouri PSE staff and other interveners to file direct testimony in early December.

Recall the requested revenue increase is designed to recover the cost of significant system reliability and resiliency investments.
?In addition to incorporating meaningful improvements for our customers, this request also includes $21 million in savings from protected data center revenues for our other retail customers and establishes a new income eligible discount rate to supplement our financial assistance programs already in place. ?We look forward to working with the Missouri PSE staff and other stakeholders throughout the review process to achieve a constructive outcome. ?

We
expect the Missouri PSE order by May 2027, with new rates reflecting the approved adjustment effective by June 2027. Moving to page 26 for an update on Amaron, Illinois regulatory matters.

Passages & reports (25)
  • Michael. I'll begin on page twenty two of our presentation. Yesterday we reported third qu…
  • of
  • two dollars and forty two cents per share compared to third quarter quarter 2025 GAAP earn…
  • of
  • $2.35 per share and adjusted earnings of $2.17 per share.
  • The
  • difference between 2025 GAAP and the adjusted earnings reflected a previous disclosure of …
  • The
  • year-over-year third quarter increase primarily reflected higher sales and favorable weath…
  • The
  • third quarter was the warmest in St. Louis in more than 50 years, with the month of Septem…
  • percent, primarily driven by the growth in the commercial customer class. These positive f…
  • As
  • Marty noted, yesterday we raised our 2026 earnings per share guidance due to strong year-t…
  • As
  • we close out the year, we expect higher expenditures for distribution line inspections, tr…
  • 24 and 25, for a brief update on the Missouri electric rate review we filed with the Misso…
  • The
  • review is proceeding according to the established procedural schedule, and we expect Misso…
  • In
  • addition to incorporating meaningful improvements for our customers, this request also inc…
  • We
  • look forward to working with the Missouri PSE staff and other stakeholders throughout the …
  • We
  • expect the Missouri PSE order by May 2027, with new rates reflecting the approved adjustme…

Speaker 4

million adjustment we're requesting reflects 2025 actual cost, actual year-end rate base, and the allowed return on equity and common equity ratio established in the multi-year rate ?plan. Notably, our requested adjustment is aligned with the ICC's staff and administrative law judges' recommendations. ?An ICC decision is expected in December, with the approved reconciliation adjustment reflected in rates in 2027. Moving to the Amaron, Illinois multi-year grid plan proceeding, ?we have proposed a $2.7 billion electric distribution investment plan for 2028 through 2031.

The plan is designed to strengthen grid safety, reliability, and resiliency while preparing the system to support evolving customer needs and Illinois clean energy objectives. Last month, the administrative law
judge recommended approval of the grid plan with proposed downward adjustments to our capital plan of approximately $200 million. ?We expect an ICC decision on the proposed investment plan by December. ?The approved multi year grid plan will inform a rate review filing we expect to make in the first quarter of 2027.

Turning to page 27, we look at our company wide capital plan for the next five years. As Marty highlighted, we see robust investment opportunities ahead. The plan we are releasing today
calls for $38.1 billion in capital expenditures from 2027 through 2031, an increase of more than 20% compared to our capital plan issued last

Passages & reports (13)
  • million adjustment we're requesting reflects 2025 actual cost, actual year-end rate base, …
  • plan.
  • Notably, our requested adjustment is aligned with the ICC's staff and administrative law j…
  • An
  • ICC decision is expected in December, with the approved reconciliation adjustment reflecte…
  • we
  • have proposed a $2.7 billion electric distribution investment plan for 2028 through 2031. …
  • judge recommended approval of the grid plan with proposed downward adjustments to our capi…
  • We
  • expect an ICC decision on the proposed investment plan by December.
  • The
  • approved multi year grid plan will inform a rate review filing we expect to make in the fi…
  • calls for $38.1 billion in capital expenditures from 2027 through 2031, an increase of mor…

Speaker unclear

?year.

Passages & reports (1)
  • year.

Speaker 4

The investments themselves primarily reflect significant significant new generation additions at Amarin, Missouri, critical upgrades to strengthen and maintain an aging grid across all operating segments and expanded transmission investments to execute awarded MISO LRTP competitive projects, interconnect new generation to serve large load customers, and support resource adequacy across the region. ?We expect this investment to drive 13.3% compound annual rate-based growth from 2026 to 2031, which is outlined by business segment on this page.

Turning to pages 28 and 29, where we provide a financing update. We continue to feel good about our financial position.
?As we fund our robust infrastructure plan, we remain focused on maintaining a strong balance sheet and strong credit metrics. Our primary source of funding will continue to be cash from operations, which we expect to increase as sales grow and rates are updated to reflect our investment in energy infrastructure.

Additional funding needs will be
financed in a balanced manner consistent with our past practices.

Passages & reports (7)
  • The investments themselves primarily reflect significant significant new generation additi…
  • resource adequacy across the region.
  • We
  • expect this investment to drive 13.3% compound annual rate-based growth from 2026 to 2031,…
  • As
  • we fund our robust infrastructure plan, we remain focused on maintaining a strong balance …
  • financed in a balanced manner consistent with our past practices.

Speaker unclear

?We

Passages & reports (1)
  • We

Speaker 4

fulfilled our 2026 equity needs in 2025 primarily through $600 million of forward sales agreements that we expect to settle near the end of the year. ?We expect to issue approximately $5 billion of equity from 2027 through 2031 and have sold forward in 2026 approximately $1.7 billion of common stock under our At the Market program to address a portion of those needs. We've had success utilizing our ATM program and expect to continue to leverage the program going forward. ?

We
appreciate the flexibility our ATM provides, including the ability to effectively dollar cost average our issuances over time. Based on our anticipated investment and other funding needs, we expect equity issuances for 2027 through 2031 to be concentrated primarily near year-end 2027 and year-end 2028. Long-term debt will fund remaining cash requirements. In 2027, we expect approximately $5.2 billion of new long-term issuance to refinance maturing obligations and fund a portion of our $8.8 billion of planned investments.

A portion of such issuances could include parent
company hybrid debt securities, which receive 50% equity credit from Moody's and SP. Expected timing for 2027 debt issuances is shown on page 29. ?We will continue to proactively manage interest rate risk associated with planned parent company new issuances through systematic execution of our rate hedging program. ?As a reminder, this past spring, SP and Moody's reaffirmed our stable outlook ?and Triple B plus and BAA1 credit ratings, respectively. ?

As
we've said before, we value our current ratings and remain committed to maintaining a strong balance sheet and strong credit metrics as we execute our growth ?plan. Moving to page 30 of our presentation, Marty outlined our 2027 earnings per share guidance range earlier. Expected 2027 earnings, detailed by segment compared to our 2026 expectations, are highlighted on this page. Robust plan infrastructure investments, strong expected sales and economic growth, and strategic business process optimization opportunities give us confidence in our ability to deliver strong earning growth in 2027 ?and the years ahead.

In summary, turning to page 31, we're excited about the opportunities ahead and confident in our ability to execute our strategic plan and deliver strong, sustainable value to customers, communities, and shareholders.
?As Marty noted earlier, our outlook includes 8 to 10% compound annual EPS growth from 2027 through 2031. And we expect EPS growth near the upper end of that range in 2028 and 2029.

This anticipated growth reflects strong economic development with expected 12.9% compound annual sales growth
in Missouri from 2027 through 2031, as well as our $38.1 billion five-year capital plan that is expected to drive 13.3% compound annual rate-based growth. Additional electric service agreements and the infrastructure investments needed to serve that demand represent potential upside to these growth expectations. Over the next decade, we have identified an investment pipeline greater than $90 billion needed to support reliability and anticipated economic growth while delivering meaningful benefits to our customers. ?

We
also expect it to deliver strong sustainable annual dividend growth as our earnings grow, ?with a payout ratio ranging between 45 to 55 percent. ?As we execute our robust growth plan, we remain committed to maintaining a strong balance sheet and strong investment grade credit ratings. Taken together, we believe our strong growth outlook, discipline financing plan, and focus on operational excellence and execution position us well to deliver long term value for our customers and competitive total returns for shareholders.

With that, we'll now open the call for questions.

Passages & reports (32)
  • fulfilled our 2026 equity needs in 2025 primarily through $600 million of forward sales ag…
  • We
  • expect to issue approximately $5 billion of equity from 2027 through 2031 and have sold fo…
  • leverage the program going forward.
  • We
  • appreciate the flexibility our ATM provides, including the ability to effectively dollar c…
  • 2028. Long-term debt will fund remaining cash requirements. In 2027, we expect approximate…
  • company hybrid debt securities, which receive 50% equity credit from Moody's and SP. Expec…
  • We
  • will continue to proactively manage interest rate risk associated with planned parent comp…
  • As
  • a reminder, this past spring, SP and Moody's reaffirmed our stable outlook
  • and
  • Triple B plus and BAA1 credit ratings, respectively.
  • As
  • we've said before, we value our current ratings and remain committed to maintaining a stro…
  • plan.
  • Moving to page 30 of our presentation, Marty outlined our 2027 earnings per share guidance…
  • growth, and strategic business process optimization opportunities give us confidence in ou…
  • and
  • the years ahead. In summary, turning to page 31, we're excited about the opportunities ahe…
  • As
  • Marty noted earlier, our outlook includes 8 to 10% compound annual EPS growth from 2027 th…
  • in Missouri from 2027 through 2031, as well as our $38.1 billion five-year capital plan th…
  • expectations. Over the next decade, we have identified an investment pipeline greater than…
  • We
  • also expect it to deliver strong sustainable annual dividend growth as our earnings grow,
  • with
  • a payout ratio ranging between 45 to 55 percent.
  • As
  • we execute our robust growth plan, we remain committed to maintaining a strong balance she…
  • and competitive total returns for shareholders. With that, we'll now open the call for que…

Questions & answers

Speaker 0

We will now move to our question and answer session. ?If you have joined via the webinar, please use the raise hand icon, which can be found at the bottom of your webinar application. ?When you are called on, please unmute your line and ask your question. ?We will now pause a moment to assemble the queue.

Passages & reports (7)
  • We will now move to our question and answer session.
  • If
  • you have joined via the webinar, please use the raise hand icon, which can be found at the…
  • When
  • you are called on, please unmute your line and ask your question.
  • We
  • will now pause a moment to assemble the queue.

Speaker 0

Our first question will come from Char Poreza with Wells Fargo. Please unmute your line and ask your question.

Passages & reports (1)
  • Our first question will come from Char Poreza with Wells Fargo. Please unmute your line an…

Speaker unclear

?Actually, it's Andrew Kadevi on for Shar this morning.

Passages & reports (1)
  • Actually, it's Andrew Kadevi on for Shar this morning.

Speaker 5

Unverified voice label

Thanks for taking my questions.

Passages & reports (1)
  • Thanks for taking my questions.

Speaker unclear

?Good

Passages & reports (1)
  • Good

Speaker 2

morning, Andrew. Sure. Happy to do

Passages & reports (1)
  • morning, Andrew. Sure. Happy to do

Speaker unclear

?it.

Passages & reports (1)
  • it.

Speaker 5

So looking at the uh EPS

Passages & reports (1)
  • So looking at the uh EPS

Speaker 1

rate keger and then also the the rate-based keger. We're seeing uh pubic delta there. It's uh the delta has gone up since your last update. Uh, can you talk about what's driving that? Is it structural or is this something that could be narrowed through

Passages & reports (1)
  • rate keger and then also the the rate-based keger. We're seeing uh pubic delta there. It's…

Speaker unclear

?time? Yeah,

Passages & reports (1)
  • time? Yeah,

Speaker 2

look, uh similar to the past, uh, the big delta between the rate-based growth and uh the earnings per share growth rate that we expect has to do with our financing activities. And, ?you know, as you know, we're gonna uh finance the capital expenditure plan that we have, the $38.1 billion capital plan in a very in a very balanced way, consistent with the way we've uh historically financed our operations, which means we will be issuing uh some equity over time to uh help with the financing of that.

You know, today we talked about
?the fact that we expect about $5 billion of equity issuances over the next five years. Uh we've already got $1.7 billion of that uh priced through some of the uh uh forward hedging that we've done. But that uh equity dilution is the primary driver of the difference between the rate based growth plans that we have and the uh EPS growth that we expect to be able to deliver over the next five years.

Passages & reports (7)
  • look, uh similar to the past, uh, the big delta between the rate-based growth and uh the e…
  • you
  • know, as you know, we're gonna uh finance the capital expenditure plan that we have, the $…
  • of that. You know, today we talked about
  • the
  • fact that we expect about $5 billion of equity issuances over the next five years. Uh we'v…
  • we have and the uh EPS growth that we expect to be able to deliver over the next five year…

Speaker unclear

?Thank you

Passages & reports (1)
  • Thank you

Speaker 5

for that. And then moving on to the the rate case in Missouri. ?Are you thinking that you'll be able to settle that case? Or since it's kind of your first one with the large load tariffs involved, maybe want ?to uh fully litigate it. And then on top of that, um, what what kind of outcome are you embedding in your in your plan for the that rate case?

Passages & reports (5)
  • for that. And then moving on to the the rate case in Missouri.
  • Are
  • you thinking that you'll be able to settle that case? Or since it's kind of your first one…
  • to
  • uh fully litigate it. And then on top of that, um, what what kind of outcome are you embed…

Speaker unclear

?Yeah,

Passages & reports (1)
  • Yeah,

Speaker 2

I'll start. This is Marty again and see if anybody else wants to chime in. But you know, we're really uh still in the very early stages with respect to that rate review. As ?we uh indicated in our prepared remarks, uh this case is really about infrastructure investments that have been made to serve you know all of our uh existing customers. Uh today we really uh aren't serving any large loads.

Uh we expect those uh sales to begin ramping up in in
20 late 2027 ?and uh only modestly in late 2027 and really not ramp up till 28 or 29. So, really, this case is really all about infrastructure investments we've made for uh our our traditional customer base. ?Uh, we expect, as we mentioned, to see direct testimony from parties in early December.

So we haven't seen any of that yet.
?Uh however, uh we do always try to work with uh the parties in these cases to resolve issues, and we have a good track record of being able to settle these rate reviews in the past, and that would be our ambition again as we go into this rate review. So, ?you know, typically those settlements have occurred sometime between when true up testimony is received and the evidentiary hearings begin.

So that would,
?you know, signal late February, early March of next year in terms of ?a possible sort of settlement uh uh time frame. And uh, you know, as I sit here today, again, not having seen any direct testimony yet, but have no reason to believe we wouldn't be able to reach agreement with the uh uh other parties in the

Passages & reports (16)
  • I'll start. This is Marty again and see if anybody else wants to chime in. But you know, w…
  • we
  • uh indicated in our prepared remarks, uh this case is really about infrastructure investme…
  • 20 late 2027
  • and
  • uh only modestly in late 2027 and really not ramp up till 28 or 29. So, really, this case …
  • Uh,
  • we expect, as we mentioned, to see direct testimony from parties in early December. So we …
  • Uh
  • however, uh we do always try to work with uh the parties in these cases to resolve issues,…
  • you
  • know, typically those settlements have occurred sometime between when true up testimony is…
  • you
  • know, signal late February, early March of next year in terms of
  • a
  • possible sort of settlement uh uh time frame. And uh, you know, as I sit here today, again…

Speaker unclear

?case.

Passages & reports (1)
  • case.

Speaker 5

Perfect. I'll leave it there. Thank

Passages & reports (1)
  • Perfect. I'll leave it there. Thank

Speaker unclear

?you.

Passages & reports (1)
  • you.

Speaker 0

Our next question will come from David Arcaro with Morgan Stanley. Please unmute your line and ask your question.

Passages & reports (1)
  • Our next question will come from David Arcaro with Morgan Stanley. Please unmute your line…

Speaker 6

Unverified voice label

Hey, this is Amanda on for Dave. Thanks so much for taking our questions. ?Um, maybe the first point on large loads and what the ESA is expected to ramp starting in ?the second half of 27 and then reaching full capacity in 2030. What are the main items that could accelerate or or delay the ramp? And do you see any impact to earnings from any shifts to the expected ramp?

Passages & reports (5)
  • Hey, this is Amanda on for Dave. Thanks so much for taking our questions.
  • Um,
  • maybe the first point on large loads and what the ESA is expected to ramp starting in
  • the
  • second half of 27 and then reaching full capacity in 2030. What are the main items that co…

Speaker unclear

?Uh

Passages & reports (1)
  • Uh

Speaker 2

good morning, Amanda. Yeah, look, first of all, as you probably saw in our slides, uh, you know, we were encouraged by the construction activity that we're seeing uh with respect to the uh ?you know 2.2 gigawatts of of uh construction that's already underway. We showed you know in a couple of pictures, that's ?for uh Google and for Amazon. And so we're we're seeing really good progress in terms of those construction activities, as well as our own construction crews.

It's great to be able to go out and meet with our teams that have been uh interconnecting the transmission assets that we have to these particular sites and
have have had great progress there as well. So really it's it's it's it's terrific to see. ?So as we sit here today, uh we uh are encouraged by the signs we're seeing. We expect RAM to begin in 2027.

And as you noted ramp aggressively in 28 and 29. What could throw that off? I would say, you know, construction delays uh at those sites to the extent those would occur. But
frankly, we've had pretty good weather year to date and uh are seeing, again, very good progress. But I think that's the primary thing would be any delays in construction that could occur uh over the course of 2027 as they really look to finalize those structures.

And I would say, you know, to the
extent that any of those uh sales were uh delayed uh due to construction activity or or other other uh uh other matters, ?uh it would of course affect the uh uh sales growth and EPS growth that we would uh see in 27 or 28. But we feel like the Kegger we provided today, uh as well as the guidance we gave about our expectations to deliver near the upper end of that in in uh 28 and 29 uh have uh reasonable assumptions baked in in terms of uh of the growth we expect to

Passages & reports (13)
  • good morning, Amanda. Yeah, look, first of all, as you probably saw in our slides, uh, you…
  • you
  • know 2.2 gigawatts of of uh construction that's already underway. We showed you know in a …
  • for
  • uh Google and for Amazon. And so we're we're seeing really good progress in terms of those…
  • have have had great progress there as well. So really it's it's it's it's terrific to see.
  • So
  • as we sit here today, uh we uh are encouraged by the signs we're seeing. We expect RAM to …
  • frankly, we've had pretty good weather year to date and uh are seeing, again, very good pr…
  • extent that any of those uh sales were uh delayed uh due to construction activity or or ot…
  • uh
  • it would of course affect the uh uh sales growth and EPS growth that we would uh see in 27…
  • 29 uh have uh reasonable assumptions baked in in terms of uh of the growth we expect to

Speaker unclear

?see

Passages & reports (1)
  • see

Speaker 6

Great. That's very helpful. Thank you. And then you raised the like 26 range to 535, 555. Any specific moving pieces to call it there and kind of ?uh what puts you into that higher range?

Passages & reports (3)
  • Great. That's very helpful. Thank you. And then you raised the like 26 range to 535, 555. …
  • uh
  • what puts you into that higher range?

Speaker unclear

?Yeah,

Passages & reports (1)
  • Yeah,

Speaker 2

I think Lenny covered it really well as he went through uh 2026. Uh we've had favorable weather year to date. Uh we've had some uh favorable gains on some innovation investments that we've made and that's been partially offset by uh in investments that we've made, OM uh investments that we've made in our system as it relates ?to uh things like uh veg additional vet vegetation management, uh energy center maintenance, things that we've really done to bolster reliability for our customers and our distribution system, uh as well as uh bolster the reliability of our energy centers, which is really going to be important in the years ahead. ?

Uh,
we saw those as needed investments, frankly, very early in the year and uh and began making those uh those investments early. So, you know, net uh we uh feel very confident in our ability to raise the midpoint of our guidance uh, ?you know, 10 cents.

Passages & reports (8)
  • I think Lenny covered it really well as he went through uh 2026. Uh we've had favorable we…
  • system as it relates
  • to
  • uh things like uh veg additional vet vegetation management, uh energy center maintenance, …
  • Uh,
  • we saw those as needed investments, frankly, very early in the year and uh and began makin…
  • you
  • know, 10 cents.

Speaker 6

Great. Thank you so

Passages & reports (1)
  • Great. Thank you so

Speaker unclear

?much.

Passages & reports (1)
  • much.

Speaker 0

Our next question will come from Carly Davenport with Goldman Sachs. Please unmute your line and ask your question.

Passages & reports (1)
  • Our next question will come from Carly Davenport with Goldman Sachs. Please unmute your li…

Speaker 6

Hey, good

Passages & reports (1)
  • Hey, good

Speaker 7

Unverified voice label

morning. Thanks so much for taking the questions. Um maybe just starting on the revised EPS growth outlook. Obviously, the 27 guidance is just north of 8% growth year over year. Anything more you can share about the cadence of growth as we work through the new planning period relative to that 8 to 10% range?

Passages & reports (2)
  • morning. Thanks so much for taking the questions. Um maybe just starting on the revised EP…
  • range?

Speaker 3

Yeah, that's a

Passages & reports (1)
  • Yeah, that's a

Speaker 2

really terrific question and appreciate it. Yeah, you know, first of all, as it relates to 2027, uh, you know, we had guided on our prior calls that we expected to uh deliver at the upper end of our prior 6 to 8% uh earnings per share growth range. And that's exactly what we're delivering today. As you look at that midpoint of that 570 to 590 guidance, that $5.80, again, 8.4% growth off of ?the original guidance we gave for 2026, which is 535.

So, you know, I think that should meet expectations. Now, as we look ahead to years beyond that, as we've spoken earlier, we're expecting to see a ramp rate in terms of uh the sales to our new customers, these hyperscalers under that uh
2.8 uh uh gigawatts of energy services agreements that we've signed. Uh, you can see that we're already deploying more capital in 2027 and we'll be doing so again in 2028, ?uh, as we really look to invest to build out the generation resources to serve those ESA.

So you're seeing both uh in 28 and 29 higher sales growth as well as higher rate-based growth in those periods. And that is what's giving us the confidence to indicate that we expect our uh earnings per share
growth in 28 and 29 to be ?you know towards the upper end of that um new eight to 10% EPS Kegger that we've provided. ?Uh but again, we feel like we've got really good visible growth uh all the way out through 2031, which gave us the confidence to provide that 8 to 10% kegger. ?

And
as you know, that's driven by the $38.1 billion of expenditures we have, which again was increased not only for incremental generation investments in Missouri, but also, as Michael indicated, incremental investments in transmission as well. Given the long range transmission projects that we've won and ?the need to begin spending capital in the latter parts of this five year plan to achieve the in service dates of 2032 to 2034 for those LRTP projects.

So feel good about
?the growth all the way out through 2031, you know, based upon all that. Now, I might take the opportunity, given your question, to talk a little bit about some of the upside that we also see uh in our plan. So, ?you know, I I'd focus you on slides 11 and 12 in particular. ?You know, so as you know, today we've signed 2.8 gigawatts of energy services agreements.

And as as I just said, we expect those to ramp up pretty quickly after 2027. The preferred resource plan assumed 2.9 gigawatts of sales growth by 2030. So as we said earlier today, that's
what we embedded in this update today. Essentially 60% sales growth in Missouri by 2030. If you look over to slide 12 in the bottom right, in the second column from the right, you see which preferred plan resources, you know, which projects and the related CapEx we've included in the update today.

That amounts to, if you total up that column, that amounts to 7,650 megawatts of new capacity or about an 80% increase in our installed capacity. That is the generation that we believe is needed to serve that 2.9 gigawatts
of assumed growth in sales out through 2030 or 2031. But as we said today, there's upside in our plans, both to our sales and to our rate-based growth plans. ?

If
you look back on slide 11, you'll see that we have another 5.6 gigawatts of large load interest. That's what's supported by construction agreements or interconnection agreements. And the generation assets in the full preferred plan would allow us to serve 3.4 gigawatts by 2031 and 5 gigawatts by 2036. So if we do sign additional ESAs, depending upon the amount and the timing of those sales, we would add spending towards the addition of the resources shown in the bottom of uh bottom right of slide 12.

Um
?you know, and we would be spending that in this five-year period. So that could be again additive in the latter part of this five-year plan to our to our sales and to our capital expenditures. I would also note ?that, you know, in the IRP, there was an upside case, and that's depicted in the dark blue line on page 11. And while it's not shown in these slides, that would require more simple cycle and combined cycle gas as well as renewables during that period of 2032 to 2034.

We would need those assets to
go into service. But that would also, as you know, based upon supply chain and construction timelines, that would require us to actually invest more during this five-year period and drive rate-based growth even higher. So ?I guess bottom line, where I'm going with all this, I'm very optimistic about the future. I'm excited about the economic development opportunities that are before us, excited for the communities that we serve and the jobs that this is going to create.

But we've been conservative today in the outlook that we've provided. We've only
incorporated sales based upon the ESAs that we've signed. We've only incorporated the capital expenditures for the projects needed to serve those 2.9 gigawatts of sales that we've included. And we think there's upside as we look even at the latter part of these five year plan in terms of sales opportunities and additional capex.

So
?uh just just building that on because we feel very good about that uh eight to 10% kegger that we provided today.

Passages & reports (40)
  • really terrific question and appreciate it. Yeah, you know, first of all, as it relates to…
  • today. As you look at that midpoint of that 570 to 590 guidance, that $5.80, again, 8.4% g…
  • the
  • original guidance we gave for 2026, which is 535. So, you know, I think that should meet e…
  • 2.8 uh uh gigawatts of energy services agreements that we've signed. Uh, you can see that …
  • uh,
  • as we really look to invest to build out the generation resources to serve those ESA. So y…
  • growth in 28 and 29 to be
  • you
  • know towards the upper end of that um new eight to 10% EPS Kegger that we've provided.
  • Uh
  • but again, we feel like we've got really good visible growth uh all the way out through 20…
  • And
  • as you know, that's driven by the $38.1 billion of expenditures we have, which again was i…
  • won and
  • the
  • need to begin spending capital in the latter parts of this five year plan to achieve the i…
  • the
  • growth all the way out through 2031, you know, based upon all that. Now, I might take the …
  • you know,
  • I I'd focus you on slides 11 and 12 in particular.
  • You
  • know, so as you know, today we've signed 2.8 gigawatts of energy services agreements. And …
  • what we embedded in this update today. Essentially 60% sales growth in Missouri by 2030. I…
  • we've included in the update today. That amounts to, if you total up that column, that amo…
  • of assumed growth in sales out through 2030 or 2031. But as we said today, there's upside …
  • If
  • you look back on slide 11, you'll see that we have another 5.6 gigawatts of large load int…
  • So if we do sign additional ESAs, depending upon the amount and the timing of those sales,…
  • you
  • know, and we would be spending that in this five-year period. So that could be again addit…
  • that, you
  • know, in the IRP, there was an upside case, and that's depicted in the dark blue line on p…
  • go into service. But that would also, as you know, based upon supply chain and constructio…
  • I guess
  • bottom line, where I'm going with all this, I'm very optimistic about the future. I'm exci…
  • incorporated sales based upon the ESAs that we've signed. We've only incorporated the capi…
  • opportunities and additional capex. So
  • uh
  • just just building that on because we feel very good about that uh eight to 10% kegger tha…

Speaker 7

Appreciate that perspective. Super helpful. And maybe just in that same vein, you also obviously raised here the 10-year pipeline pretty significantly. Is there anything that you can share sort of on how front-end loaded that remaining kind of $52 billion or so in additional opportunities beyond the five-year planning period is just as you think about some of the moving pieces on the PRP and transmission.

Passages & reports (2)
  • Appreciate that perspective. Super helpful. And maybe just in that same vein, you also obv…
  • think about some of the moving pieces on the PRP and transmission.

Speaker unclear

?Yeah,

Passages & reports (1)
  • Yeah,

Speaker 2

it's a really good question. You're right. We feel really good about that 10 year outlook and that pipeline we have. And I think with respect to the front end loading, if you will, I think you're saying, hey, do you think it's going to be front end loaded after 2031? The answer is yes, largely as we sit here today, because we have got greater visibility there.

And I think what you want to look at is those transmission projects that we won that have those in-service dates, as I mentioned, of 2032 to 2034. Look at the additional generation assets that we're putting into service, uh, which you
see in the slide that we provided on the IRP. You know, there's better visibility in those periods. And so, yeah, I think as it relates to that uh incremental uh you know, 52, that's more front end loaded.

But again, I'm optimistic that the growth that we're experiencing today uh can continue on for
a decade. And I think there'll be opportunities to add to that 90 billion as we as we go through time. That's really what's visible today. And I would say, going back to my answer to your last question, that includes what's in the preferred plan, but it does not include generation resources that would be needed if we were able to achieve the upside case in the IRP.

Passages & reports (5)
  • it's a really good question. You're right. We feel really good about that 10 year outlook …
  • largely as we sit here today, because we have got greater visibility there. And I think wh…
  • see in the slide that we provided on the IRP. You know, there's better visibility in those…
  • a decade. And I think there'll be opportunities to add to that 90 billion as we as we go t…
  • be needed if we were able to achieve the upside case in the IRP.

Speaker 7

Got it. Really appreciate all the color. Thank

Passages & reports (1)
  • Got it. Really appreciate all the color. Thank

Speaker unclear

?you.

Passages & reports (1)
  • you.

Speaker 0

Our next question will come from Richard Sunderland with Truist Securities. Please unmute your line and ask your question.

Passages & reports (1)
  • Our next question will come from Richard Sunderland with Truist Securities. Please unmute …

Speaker unclear

?Hey, good morning. Can you hear me?

Passages & reports (1)
  • Hey, good morning. Can you hear me?

Speaker 2

Yes, Richard. Welcome. Great. Thanks for having ?me. Um Marty, thanks for running through all of the upside uh case uh options and paths. Um, you know, it sounds like you have ?a real eye to additional contract signings. Obviously, the construction agreements and broader pipeline behind that speak to that. ?Um, how are you seeing the pace of conversations unfolding across those two buckets?

Any sense on just sort of momentum as it stands now relative to kind of progress over
?the last nine months in forming today's plan update?

Passages & reports (9)
  • Yes, Richard. Welcome. Great. Thanks for having
  • me.
  • Um Marty, thanks for running through all of the upside uh case uh options and paths. Um, y…
  • a
  • real eye to additional contract signings. Obviously, the construction agreements and broad…
  • Um,
  • how are you seeing the pace of conversations unfolding across those two buckets? Any sense…
  • the
  • last nine months in forming today's plan update?

Speaker unclear

?Yeah,

Passages & reports (1)
  • Yeah,

Speaker 2

Richard, it's it's uh great question. Uh look, you know, we are seeing progress. We did see um, you know, uh 600 megawatts move from interconnection studies to to construction agreements in Missouri. We thought that was positive. Frankly, we're seeing a lot of interest in both Missouri and Illinois in terms of sites that we have that are available for development. And those conversations continue.

I think they're constructive, they're positive, they're moving in a good direction. It's just always very hard to put a real timeline on when those might uh convert uh to energy services uh agreements.
?Uh, but those conversations are underway and you know feel really good about those. As I've mentioned before, uh, even the uh counterparties that we have today, the Amazons and the Googles, ?uh, you know, have expressed interest in future expansion in our service territory.

So we're working with both uh developers
?of uh ?you know of these sites as well as uh counterparties, uh ultimate counterparties to to move these forward. ?So again, hard to put a timeline on them. Uh conversations are constructive. ?Uh I am optimistic that in 2027 we'll see uh further uh energy services agreements uh signed, ?uh, but can't put a definitive timeline on ?that.

No,
that's that's perfect. That's helpful context. And ?I guess to ?follow up on that point, ?you know,

Passages & reports (24)
  • Richard, it's it's uh great question. Uh look, you know, we are seeing progress. We did se…
  • sites that we have that are available for development. And those conversations continue. I…
  • Uh,
  • but those conversations are underway and you know feel really good about those. As I've me…
  • uh,
  • you know, have expressed interest in future expansion in our service territory. So we're w…
  • of
  • uh
  • you
  • know of these sites as well as uh counterparties, uh ultimate counterparties to to move th…
  • So
  • again, hard to put a timeline on them. Uh conversations are constructive.
  • Uh
  • I am optimistic that in 2027 we'll see uh further uh energy services agreements uh signed,
  • uh,
  • but can't put a definitive timeline on
  • that. No,
  • that's that's perfect. That's helpful context. And
  • I guess
  • to
  • follow up on that
  • point,
  • you
  • know,

Speaker unclear

?it sounds like you're clear on a

Passages & reports (1)
  • it sounds like you're clear on a

Speaker 2

you

Passages & reports (1)
  • you

Speaker unclear

?know this five year plan

Passages & reports (1)
  • know this five year plan

Speaker 2

opportunity. You've ?already guided to uh kind of an upper end um expectation for 20 and 29. So is this is this the chance to extend that over you know 30 and 31? You know,

Passages & reports (3)
  • opportunity. You've
  • already
  • guided to uh kind of an upper end um expectation for 20 and 29. So is this is this the cha…

Speaker unclear

?how do you see the

Passages & reports (1)
  • how do you see the

Speaker 2

upside kind ?of feathering in over the five five-year period?

Passages & reports (3)
  • upside kind
  • of
  • feathering in over the five five-year period?

Speaker unclear

?Yeah,

Passages & reports (1)
  • Yeah,

Speaker 2

Richard, that's exactly the way uh I'm thinking about it. You know, over time, uh, if we're able to sign additional ESAs, I look at it as really strengthening the EPS growth rate uh in the outer years of this five year plan and lengthening the period of this uh strong growth. So I think you've got it right. It's really about uh lengthening and strengthening as we look ahead to future ESAs.

As I said before, again, I I think we've
?been uh appropriately conservative in today's outlook. We've really only incorporated uh, you know, the ESAs that we've signed, the construction that's needed to support that, ?uh, but certainly see upside from ?there. No, that that's great. And sorry, a quick follow-up on that lengthening and strengthening the $90 billion plus uh 10-year plan. What does that roughly equate to on a rate-based caker basis?

Passages & reports (8)
  • Richard, that's exactly the way uh I'm thinking about it. You know, over time, uh, if we'r…
  • you've got it right. It's really about uh lengthening and strengthening as we look ahead t…
  • been
  • uh appropriately conservative in today's outlook. We've really only incorporated uh, you k…
  • uh,
  • but certainly see upside from
  • there. No, that
  • that's great. And sorry, a quick follow-up on that lengthening and strengthening the $90 b…

Speaker unclear

?Well,

Passages & reports (1)
  • Well,

Speaker 2

I'll let you do the math on that. I think what you'd see is that uh it it provides very good growth uh beyond uh uh beyond the five-year period. Uh again, uh lengthening the uh the strong EPS growth rates that we've had, frankly, over the past decade uh into the next decade. And as I mentioned before, I see upside to that $90 billion as we look out over time as ?well.

Great. Thank you for

Passages & reports (4)
  • I'll let you do the math on that. I think what you'd see is that uh it it provides very go…
  • as I mentioned before, I see upside to that $90 billion as we look out over time as
  • well.
  • Great. Thank you for

Speaker unclear

?all of that.

Passages & reports (1)
  • all of that.

Speaker 0

Our next question will come from Julian Dumalin Smith with Jeffries. Please unmute your line and ask your question.

Passages & reports (1)
  • Our next question will come from Julian Dumalin Smith with Jeffries. Please unmute your li…

Speaker unclear

?Good morning, team. Thank you guys very much for the

Passages & reports (1)
  • Good morning, team. Thank you guys very much for the

Speaker 2

time. I I Marty and team,

Passages & reports (1)
  • time. I I Marty and team,

Speaker unclear

?I've learned never to underestimate you guys over the years. And yet again, you guys come in

Passages & reports (1)
  • I've learned never to underestimate you guys over the years. And yet again, you guys come …

Speaker 5

and more

Passages & reports (1)
  • and more

Speaker unclear

?than deliver. So kudos to you guys, honestly. Well,

Passages & reports (1)
  • than deliver. So kudos to you guys, honestly. Well,

Speaker 2

thanks, Julian. It's great to have you on the call.

Passages & reports (1)
  • thanks, Julian. It's great to have you on the call.

Speaker 5

Excellent. Well, so look, let me let me take what you're you're what you're putting ?down. Um if if I can lead with this, uh you we've seen the midterms, we're we're actively hearing companies talk about pivoting here, um, and and specifically some of your customers here. How do you think about your opportunity? Uh you met

Passages & reports (3)
  • Excellent. Well, so look, let me let me take what you're you're what you're putting
  • down.
  • Um if if I can lead with this, uh you we've seen the midterms, we're we're actively hearin…

Speaker 2

you specifically go out of your way to highlight

Passages & reports (1)
  • you specifically go out of your way to highlight

Speaker 5

the incremental above the the the the roughly three ?gigs you signed. How do you think about the timeline there? I know that was specifically asked here a second ago, ?uh, but has it changed even in recent days? ?And then more to the point, um, when you think about uh what this looks

Passages & reports (7)
  • the incremental above the the the the roughly three
  • gigs you signed. How
  • do you think about the timeline there? I know that was specifically asked here a second ag…
  • uh,
  • but has it changed even in recent days?
  • And
  • then more to the point, um, when you think about uh what this looks

Speaker unclear

?like in terms of of incremental generation, can you can you handle it? And I read the reason I raise this is, you know, just on the the ENC side, you know, we've seen, you know, just uh the the

Passages & reports (1)
  • like in terms of of incremental generation, can you can you handle it? And I read the reas…

Speaker 5

limits of the sector and what they can deliver. I'm very curious to hear how you think about um managing the the the construction risk at the same time here too. So

Passages & reports (1)
  • limits of the sector and what they can deliver. I'm very curious to hear how you think abo…

Speaker 2

both the upside

Passages & reports (1)
  • both the upside

Speaker unclear

?case doubling down with your customers, I'm hearing

Passages & reports (1)
  • case doubling down with your customers, I'm hearing

Speaker 5

that very clearly. Clearly, our channel checks would suggest that. ?But at the same time, how do you think about managing the construction risk, just given the the totality of what you have at hand? And I have ?a quick follow up on the backhand.

Passages & reports (5)
  • that very clearly. Clearly, our channel checks would suggest that.
  • But
  • at the same time, how do you think about managing the construction risk, just given the th…
  • a
  • quick follow up on the backhand.

Speaker unclear

?Okay,

Passages & reports (1)
  • Okay,

Speaker 2

Julian. Uh yeah, look, there was a lot there. I'll start, and I think I'll turn it over to Michael. You know, he in in our prepared remarks today talked a little bit about our our preparedness to execute. ?You know, you started uh by talking about uh, you know, the uh election. I would say is it related to the two states we operate in, uh, I think you'd expect relative uh stability.

Uh Governor Pritzker won re-election in Illinois. There was no gubernatorial election in Missouri. Uh our commissions are not are not
elected commissions, so there was no uh election results there. And while uh we always um uh have some experience of of some turnover in the state legislatures uh you know in in both uh cases the uh the majorities uh ?you know stayed the same uh post election so uh really I I would expect you know relative stability in terms of uh energy policy uh in both of the states and and I think uh that that's a good backdrop as we think about you know prospectively uh the growth opportunities, the investment, the growth opportunities that would exist within the two states.

Obviously, we're seeing a lot of this growth that we're experiencing, a sales growth and investment opportunity in Missouri. And so again, would expect relative stability there.
?And again, I would just say that as we thought about building out this five year plan, uh thought, as I said before, I think appropriately conservative in that we've really only reflected the uh sales that we've signed up already, uh, the ESAs that we already have, as well as the investments to support them.

So feel very good about the plan, but continue to feel good about our upside. Now you're absolutely right. It's really contingent not only on our ability to sign additional ESAs,
?uh, but to be able to deliver the power that's needed to support those uh those customers. And at that point, I'll I'll turn it over to Michael. Hey,

Passages & reports (12)
  • Julian. Uh yeah, look, there was a lot there. I'll start, and I think I'll turn it over to…
  • You
  • know, you started uh by talking about uh, you know, the uh election. I would say is it rel…
  • elected commissions, so there was no uh election results there. And while uh we always um …
  • you
  • know stayed the same uh post election so uh really I I would expect you know relative stab…
  • opportunities that would exist within the two states. Obviously, we're seeing a lot of thi…
  • And
  • again, I would just say that as we thought about building out this five year plan, uh thou…
  • So feel very good about the plan, but continue to feel good about our upside. Now you're a…
  • uh,
  • but to be able to deliver the power that's needed to support those uh those customers. And…

Speaker 3

thanks, Marty. Good morning, Julian. Yeah, I would certainly echo Marty's comments on the political side too. I ?mean, I think we like to think about infrastructure economic development as for you know bipartisan issues, you know, if you will. Um, and so, you know, we've had term limits in Missouri for a long time. So you always have turnover, always building new coalitions, new relationships.

So, you know, all of that will continue.
From a generation perspective, we we do have a lot going on, as you noted. I mean, in the slides, we talked about the 7,600, 7700 megawatts that we're building, you know, an 80% increase. ?Look, we feel good about where we are. We got a lot to do, but the team is executing this plan well. ?

You
know, we have two simple cycles that are under construction. You know, we have all the long lead time material, in fact, on the plant that's coming online in 2027. All the turbines are here, the generators that they're sitting on their uh pad. So feel good about those and that construction date uh in 2027. The big hollow uh energy center, same thing.

We have you know all the long lead time material. We have an EPC contract in place uh with the same person that's uh building, you know, the one in 2027. So feel good about that transition that's occurring there.
?And then also from a West Alton perspective, making good progress there. You know, we've had the long lead time material on this combined cycle.

It's a big plant, 2,100 megawatts under contract for a long period of
?time. We recently uh executed a construction agreement with our local partners here, uh both Alberisi and uh uh McCarthy, long term uh partners of ours that have built a lot of generation for us. They're very involved in our renewable build as ?well. I mean, I think it's a you know, it's a great economic development story.

We got Missouri companies building Missouri generation. So again, a lot to do there. But uh we have um, you know, a uh nationally recognized uh engineer record involved in that plant, the same ones, Sergeant Lundy, that's been involved with both
uh the two simple cycles, so feel good about that from a design perspective, putting some additional project oversight in place to make sure that we can execute this.

From a renewables battery perspective, I mean it's really a rinse and repeat uh sort of program. Just, you know, again, a lot of discipline around
it, standardizing wherever we possibly can. You know, just it makes it simple from a design, a construction perspective, ?and then an operating perspective, and able to use a number of uh, again, local EPC contractors to help build with this.

So a lot of activity, a lot of economic development, which is absolutely great for the region, great for skilled craft. You know, that that part's incredibly positive.
?Uh, we're gonna have to manage it well, but feel good about where we sit today, Julian.

Passages & reports (21)
  • thanks, Marty. Good morning, Julian. Yeah, I would certainly echo Marty's comments on the …
  • mean,
  • I think we like to think about infrastructure economic development as for you know biparti…
  • From a generation perspective, we we do have a lot going on, as you noted. I mean, in the …
  • Look,
  • we feel good about where we are. We got a lot to do, but the team is executing this plan w…
  • You
  • know, we have two simple cycles that are under construction. You know, we have all the lon…
  • 2027. The big hollow uh energy center, same thing. We have you know all the long lead time…
  • And
  • then also from a West Alton perspective, making good progress there. You know, we've had t…
  • time.
  • We recently uh executed a construction agreement with our local partners here, uh both Alb…
  • well. I
  • mean, I think it's a you know, it's a great economic development story. We got Missouri co…
  • uh the two simple cycles, so feel good about that from a design perspective, putting some …
  • it, standardizing wherever we possibly can. You know, just it makes it simple from a desig…
  • and
  • then an operating perspective, and able to use a number of uh, again, local EPC contractor…
  • Uh,
  • we're gonna have to manage it well, but feel good about where we sit today, Julian.

Speaker unclear

?Yeah,

Passages & reports (1)
  • Yeah,

Speaker 2

Julian, it's Marty. Just one thing to one thing to add on to you know what Michael said and tied to my earlier remarks. You know, I I mentioned earlier that, you know, when you look at what's sort of outside of our capital plan today, which includes some of the resources in the bottom right of slide twelve, uh, that's not to say that we haven't taken action.

We we

Passages & reports (2)
  • Julian, it's Marty. Just one thing to one thing to add on to you know what Michael said an…
  • right of slide twelve, uh, that's not to say that we haven't taken action. We we

Speaker 3

in fact we have taken action to uh ensure that to the extent that there were long lead time uh commitments that we needed to make to lock in our ability to deliver those resources in the 27 to 31 timeframe, uh, we have taken that action. So uh just wanted to make make mention of

Passages & reports (2)
  • in fact we have taken action to uh ensure that to the extent that there were long lead tim…
  • of

Speaker unclear

?that.

Passages & reports (1)
  • that.

Speaker 2

Excellent. So one small nuance. And first off, thank you. And again, I was more alluding to um maybe folks leaving Texas to come to you guys. But maybe with respect to the equity plan, just very quickly, um you I that's what I was thinking. ?So we're hearing out there. Um but really if I can talk about the

Passages & reports (3)
  • Excellent. So one small nuance. And first off, thank you. And again, I was more alluding t…
  • So
  • we're hearing out there. Um but really if I can talk about the

Speaker 5

equity plan real quickly, you have 13%

Passages & reports (1)
  • equity plan real quickly, you have 13%

Speaker unclear

?rate based keger here.

Passages & reports (1)
  • rate based keger here.

Speaker 1

Um

Passages & reports (1)
  • Um

Speaker unclear

?your last plan talked about 250

Passages & reports (1)
  • your last plan talked about 250

Speaker 5

to 300 basis points of equity dilution, give or take. Um, when you think about um today you're talking it seems like it implies roughly three hundred basis points of dilution. Is there any chance that you get incremental customer deposits to bring that down on the margin or the percentage ?of incremental uh equity

Passages & reports (3)
  • to 300 basis points of equity dilution, give or take. Um, when you think about um today yo…
  • of
  • incremental uh equity

Speaker 2

versus capex ?on future deals shifts here? We've seen some of your peers talk about this. I just want to make sure I'm hearing you right on ?this. If there's anything to to read in between the lines on on just de equitizing the plan on the margin, if you ?will, through through deposits. Yeah. Well well, first of all, Julian, I I think either one of our states, Missouri or Illinois, would welcome folks

Passages & reports (7)
  • versus capex
  • on
  • future deals shifts here? We've seen some of your peers talk about this. I just want to ma…
  • this.
  • If there's anything to to read in between the lines on on just de equitizing the plan on t…
  • will,
  • through through deposits. Yeah. Well well, first of all, Julian, I I think either one of o…

Speaker 3

that want to come from Texas. So uh so appreciate that uh that sentiment. Um, you know, look with respect to uh, you know, the the capital plan, the rate-based growth plans, uh, you know, the the the equity dilution and all that, uh I think that's uh uh ?you know all all uh reasonable. ?Yeah, Julian, I mean I would say absolutely those types of um arrangements are certainly on the table.

I mean, obviously we have this large load tariff that's in place today, you know, that's that's serving the
?the 2.8, 2.9 that uh Marty referenced. But as we think about this next phase and the 2.1 that he referenced, or ?I mean, clearly we have uh the ability to try to look at those uh arrangements, make sure that we have, again, the right parameters in place to make sure we're protecting all stakeholders, but also if there's a way to finance this in a different way that helps from a balance sheet perspective, we we absolutely are looking at those.

All right, I'll leave it there. Thank you

Passages & reports (10)
  • that want to come from Texas. So uh so appreciate that uh that sentiment. Um, you know, lo…
  • you
  • know all all uh reasonable.
  • Yeah,
  • Julian, I mean I would say absolutely those types of um arrangements are certainly on the …
  • the
  • 2.8, 2.9 that uh Marty referenced. But as we think about this next phase and the 2.1 that …
  • I
  • mean, clearly we have uh the ability to try to look at those uh arrangements, make sure th…
  • absolutely are looking at those. All right, I'll leave it there. Thank you

Speaker unclear

?guys.

Passages & reports (1)
  • guys.

Speaker 2

Good questions, Julian. Thank

Passages & reports (1)
  • Good questions, Julian. Thank

Speaker unclear

?you.

Passages & reports (1)
  • you.

Speaker 0

Our next question will come from Diana Niles with JP Morgan. Please unmute your line and ask your question.

Passages & reports (1)
  • Our next question will come from Diana Niles with JP Morgan. Please unmute your line and a…

Speaker 6

Hey, good morning. Thank you for the update today and for taking our questions. Reading the Missouri IRP. Yeah, thank you. Reading the Missouri IRP, we saw listed a pipeline of over 40 data center opportunities in the company's Missouri footprint. Um, if you could provide some color characterizing that wider opportunity set to the 5.6 gigawatts laid out in your slides, that would be appreciated.

And is there an opportunity for any of those projects to contribute to growth during the plan period or sustain to the next? Thank

Passages & reports (2)
  • Hey, good morning. Thank you for the update today and for taking our questions. Reading th…
  • color characterizing that wider opportunity set to the 5.6 gigawatts laid out in your slid…

Speaker unclear

?you. Yeah,

Passages & reports (1)
  • you. Yeah,

Speaker 2

listen, I I think the best way we've tried to frame that is in terms of the energy services agreements we've signed and then the uh the backlog that uh we have of construction agreements and interconnection agreements. So as you know, we've already signed 2.8 gigawatts of energy services agreements. We baked that into our assumptions today. In fact, we baked in 2.9 gigawatts total.

But beyond that, those sites that you saw within the IRP, that really translates into, you know, what we're seeing today, again, is uh about 5.6 gigawatts of affirmed large load interest. And that
takes the form of both 1.2 gigawatts of construction agreements, another 4.4 gigawatts of uh incremental projects with interconnection studies completed. As I said before, we're pleased to see about 600 megawatts go from uh interconnection studies into construction agreements in this quarter.

So,
?you know, I think that's the uh the color and the projects, and we're you know excited about uh the ESAs we've already signed, and we're excited about that backlog and the conversations we're having about ?uh serving additional data centers in our service territory. Appreciate the question.

Passages & reports (8)
  • listen, I I think the best way we've tried to frame that is in terms of the energy service…
  • our assumptions today. In fact, we baked in 2.9 gigawatts total. But beyond that, those si…
  • takes the form of both 1.2 gigawatts of construction agreements, another 4.4 gigawatts of …
  • quarter. So,
  • you know,
  • I think that's the uh the color and the projects, and we're you know excited about uh the …
  • uh
  • serving additional data centers in our service territory. Appreciate the question.

Speaker unclear

?Thank

Passages & reports (1)
  • Thank

Speaker 6

you. That'll do it for me. Thank

Passages & reports (1)
  • you. That'll do it for me. Thank

Speaker unclear

?you.

Passages & reports (1)
  • you.

Speaker 0

We have now reached the end of our question and answer session. I'd now like to turn the call over to Marty Lyons for closing remarks.

Passages & reports (1)
  • We have now reached the end of our question and answer session. I'd now like to turn the c…

Speaker unclear

?Hey,

Passages & reports (1)
  • Hey,

Speaker 2

I want to thank everybody who joined us this morning. A lot of really great questions and a lot of great dialogue. Hopefully, you got a lot out of the that that exchange. As you can tell, we're absolutely focused on strong execution of our plan. And, you know, we're going to continue to do that for the remainder of this year and into next year and work very diligently as a team to serve our customers well, to deliver safe, reliable, and affordable energy. ?

And
so again, thank you all for joining us today. And with that, have a great day and a great weekend.

Passages & reports (4)
  • I want to thank everybody who joined us this morning. A lot of really great questions and …
  • that for the remainder of this year and into next year and work very diligently as a team …
  • And
  • so again, thank you all for joining us today. And with that, have a great day and a great …
Source, accuracy & exportsMay contain errorsAccuracy unmeasured. Speakers are anonymous voice labels, local to this call. No names are verified. Section starts and timestamps are inferred. Speakers are anonymous voice labels, local to this call. No names are verified. Section starts and timestamps are inferred.

Short unclear spans may appear inline between matching voice IDs. The ? marker retains unknown attribution; no voice identity is inferred for those words.

AI-generated transcript; names, numbers and wording may be inaccurate.

Speaker IDs are anonymous and local to this call. Section boundaries and timestamps are inferred.

1 words have zero-duration alignments. Use surrounding audio; no timing has been repaired.

The diarizer reached its eight-speaker limit; distinct voices may share an ID.

Zero-duration alignments: 1. Unassigned words: 344. No alignment has been repaired. Timestamps locate passages in the source recording; decimal positions do not establish word-level precision.

Official issuer source ↗ · Report an issue

Published transcript · Full recording available. Publication updated 2026-11-16T01:41:22.322Z.
Transcript version v1-0777ccc345986f7ea277 · publication revision 1. Generated by AI; no listener-verified accuracy score is available.

Dotted spans marked ? have an unclear speaker. They remain unattributed even when shown inside a surrounding turn.

Copy or download
ReadableGrouped by speaker and paragraph with timestamps. Stored words unchanged.
As storedOne line per stored segment with its original speaker ID and start time. Exactly the stored words.
Official issuer source ↗Company overview ↗
TRANSCRIPT FEEDBACK

Report a passage

Your report is queued privately for review. It does not change this transcript automatically. Please avoid personal information.